EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/HR/MIN/26439/2015
ii. MoEFCC File No. :
J-11011/18/2015-IA II (I)
iii.Short narrative of the project:
Mining of Minor Mineral (sand) from Mines/Quarries of ‘Asadpur Sand Unit’
iv. Project Sector :
Mining Projects
v. Company/Proponent :
M/S ZELKOVA BUILDCON PRIVATE LIMITED
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Haryana
Sonipat
Sonipat
2.
Haryana
Sonipat
Sonipat
vii.Date of TOR Granted
17 Apr 2015
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
16 Feb 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
16 Dec 2015
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
ADS Letter
Request letter for the inclusion of proposal in EAC meeting agenda.
03 Jun 2016
2.
NA
The Proposal was deferred as the Project Proponent did not attend the meeting.
09 May 2016
3.
NA
Uploade Complete document of EIA/EMP Report.
11 Jul 2016
4.
ADS Letter
Final EIA report with Annexures.
11 Jul 2016
5.
NA
The Committee deliberated at length the information submitted by PP and deferred the Proposal. The Proposal may be considered further after receipt of following information: 1. The replenishment study shall be done and report shall be submitted. 2. The evacuation gates w.r.t. haulage road and detailed traffic analysis shall be submitted. 3. The Transportation plan and Plantation programme is to be revised with budgetary provisions. 4. Plan on occupational health and safety shall be submitted with revised budget. 5. Revised action plan on Public Hearing shall be submitted. The concerns related to School going children were raised by the Committee a separate action plan
05 Sep 2016
6.
ADS Letter
Reply to observations made in the minutes of 9th meeting of the reconstituted expert appraisal committee held on 22nd – 23rd August, 2016 for Agenda Item No. 2.2 for Mining of Sand (Minor Mineral) from Mines/Quarries of ‘Asadpur Sand Unit’ with Production Capacity of 18,00,000 TPA (ROM) of Sand by M/s Zelkova Buildcon Private Limited
17 Oct 2016
7.
NA
The PP submitted the required information online by letter no. ZBPL/Mining/Asadpur/2016-17/076 dt. 15.10.2016 and the proposal was once again considered during the EAC meeting held during 23-25 November 2016.The committee deliberated on the information provided by the proponent and was not satisfied with the haulage plan submitted by PP and suggested that the PP should reduce the mining quantity. In this regard, the PP submitted a letter no.ZBPL/Mining/Asadpur/2016-17/086 dt. 23.11.2016 with revised mining quantity of 15.5 Lakh tonnes per annum. Based on the revised mining quantity, the committee recommended the proposal for granting Environment Clearance. The Committee also noted that EIA/EMP report submitted by M/s Udaipur Min Tech Pvt. Ltd was carelessly prepared. The Committee info
07 Dec 2016
8.
ADS Letter
EC has already been recommended by the Hon’ble EAC Committee
09 Dec 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
157
iii. Name of Consultant:
M/s Udaipur Min Tech Pvt. Ltd.
iv. Address :
M/s Udaipur Min Tech Pvt. Ltd., 206, Apeksha Complex, Hiran Magari, Sector - 11, Udaipur (Rajasthan)
v. Mobile No.:
9829567672
vi. Landline No.:
02942489672
vii. Email Id:
ssbist@udrmintech.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Narender
ii. Designation :
Joint MD
iii. Name of Company(Applicant Name should not be given here) :
M/S ZELKOVA BUILDCON PRIVATE LIMITED
iv. Address :
60, 2nd floor, Vasant marg, Vasant Vihar, New Delhi-110057.
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print