EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/WB/IND/48189/2014    ii. MoEFCC File No. : J-11011/201/2013-IA(I)    iii.Short narrative of the project: Expansion of Integrated stell plant    iv. Project Sector : Industrial Projects-1    v. Company/Proponent : SHAKAMBHARI ISPAT AND POWER LIMITED
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.West BengalPuruliaRaghunathpur
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 13 Apr 2015 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 06 Feb 2016 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 14 Oct 2015   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NABased on the presentation made and discussions held, the Committee desired additional information on the following for further consideration of the proposal: i. The project consultant M/s Mecons should be invited for providing details on the technical aspects of the project during the consideration of the project. ii. The subject of project to be changed as this is an integrated project. iii. Details regarding Electric load list and power consumption reduction per unit production should be submitted. iv. A note on Secretariat for Industrial Assistance (SIA) registration. v. Capacity calculations for settling tanks / pond should be furnished. vi. Material balance diagram should be resubmitted. vii. Details regarding proposed pollution control measures for the project should be submitted along with details on the number of pollution control equipments provided for each unit proposed. viii. Disposal of the solid waste plan should be submitted. ix. Status of permission for fi 25 Apr 2016
2. ADS LetterAddtional documents as required by EAC is submitted herewith. 26 Apr 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 74    iii. Name of Consultant: GLOBALTECH ENVIRO EXPERTS PVT LTD   iv. Address : C - 23, B J B NAGAR, BHUBANESWAR , 751014   v. Mobile No.: 9437033487   vi. Landline No.: 06742436853   vii. Email Id: globalexperts@rediffmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : INDRAJIT    ii. Designation : GROUP GENERAL MANAGER    iii. Name of Company(Applicant Name should not be given here) : SHAKAMBHARI ISPAT AND POWER LIMITED    iv. Address : PARVATPUR, RADHAMADHABPUR, BARTORIA, PURULIA- WEST BWNGAL v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL