EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/MH/MIS/26552/2015    ii. MoEFCC File No. : 10-4/2015-IA-III    iii.Short narrative of the project: Construction of Fifth Oil Berth at Jawahr Dweep    iv. Project Sector : Infrastructure and Miscellaneous Projects & CRZ    v. Company/Proponent : MUMBAI PORT TRUST
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.MaharashtraMumbai CityMumbai
2.MaharashtraMumbai CityKurla
 
   vii.Date of TOR Granted 19 Jun 2015 viii.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 13 Feb 2016 x.Project Type: New
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 30 Jan 2016   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAProposal was considered in the 3rd EAC meeting held during 23rd February, 2016 and the Committee deferred the proposal for want of following addl. information : i. As per MSCZMA recommendation, dredging shall be done about 4-5 million m3. However, PP informed that quantity of dredging is 6 million m3. PP has to confirm the quantity of dredging to be done. ii. The project proponents would clearly specify as to where does the project site fall, as regards to the coastal regulation zones, as certified in the report submitted to this effect. iii. Mangroves conservation plan to be submitted. iv. Pipeline to be laid 50 m away from the mangroves area. Therefore, revised maps with coordinates for the location especially with reference to mangroves to be submitted. v. SCZMA has not recommended the reclamation. Therefore, revised layout map to be submitted. The proposal was deferred till the desired information is submitted. The above information shall be provided with the uploading 10 Mar 2016
2. ADS LetterInformation as sought is enclosed herewith. 14 Mar 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 95    iii. Name of Consultant: L&T INFRASTRUCTURE ENGINEERING Ltd   iv. Address : Begumpet Hyderabad   v. Mobile No.: 9491035060   vi. Landline No.: 04040354444   vii. Email Id: smanna@mbptmail.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : SANTANU    ii. Designation : EXECUTIVE ENGINEER    iii. Name of Company(Applicant Name should not be given here) : MUMBAI PORT TRUST    iv. Address : CHIEF ENGINEER,MUMBAI PORT TRUST,PORT HOUSE,SHOORJI VALLABHDAS MARG,BALLARD ESTATE,MUMBAI v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL
Print