1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | SETTING UP NEW PESTICIDE & PESTICIDE INTERMEDIATE PLANT IN EXISTING FORMULATING UNIT | (b)Name of the Company / Organisation | SAGA CHEMIE PVT LTD | (c)Registered Address | Plot No 201/3, GIDC Industrial Estate -Panoli, Dist: Bharuch,,Bharuch,Gujarat-394116 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sahil P Maloakar | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot No. 201/3, GIDC Industrial Estate-Panoli, Dist Bharuch,,Anklesvar,Bharuch,Gujarat-394116 | (d)Pin code | 394116 | (e)E-mail | sagachemied@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 207394 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/78833/2018 | (d)Master Proposal Number(Single Window) | SW/163647/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 201/3, GIDC estate, Panoli | (b)Pincode | 394116 | (c)Bounded Latitudes (North) | | From | | Degree | 21.573087 | Minutes | | Second | | From | | Degree | 21.573480 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.997254 | Minutes | | Second | | From | | Degree | 72.997414 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 15 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Anklesvar | | (2.) | West Bengal | Barddhaman | Barabani | Panuria and 7 other villages | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/280/2018-IA-II(I) | (b)Date of Apply of TOR | 29 Sep 2018 | (c)Date of Issue of TOR / Standard ToR | 04 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The project site is located in Notified Industrial area of GIDC, Panoli | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Air Compressor | 200 liter | | (2.) | Cooling tower | 125 TR | | (3.) | Double cone blender | 500 Liter | | (4.) | Autoclave | 2 KL * 2 Nos. | | (5.) | Thermopack | 600000 Kcal | | (6.) | Glass line reactor | 5 KL * 6 Nos. | | (7.) | Distillation system | 1.5 KL * 2 Nos. | | (8.) | ML transfer pump | 8 M3 /hr | | (9.) | Boiler | 850 Kg/ Hr | | (10.) | Nutche filter | 1.5 KL | | (11.) | SS-316 REACTOR | 3 KL * 6 Nos. | process plant | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Repacking of PGA, EDTA, SBS powder, Phosphoric acid, 2,6 Dipicolonic acid, SBS solution, Acetic acid derivatives, Indicator & stain powder, Metheline Blue, Butyric acid, Citrazinic Acid, HydroxylamineHydrochloride, 1-Hydroxy Benzotrizole, 2-Hydroxy quinoxaline | 50 | Others | MT/ Month | Road | | (2.) | Pesticide & Agrochemicals formulation and Repacking (job work & own manufacturing) | 200 | Others | MT/ Month | Road | | (3.) | Sodium Hydrogen Sulphide | 300 | Others | MT/ Month | Road | | (4.) | Para Chloro Meta Cresol, Para Chloro Meta Xylenol, Para Chloro Ortho Cresol, Para Chloro Meta Toludine, Chloro phenol, Cyclopentanone, Benzophenone 3, Benzophenone 4, Tertiary Butyl Isocynate, Tertiary Butyl Chloride, Tertiary Butyl Carbitol Phosphite, Tris Tridecyl Phosphite, Ethyl Benzyl Meta Sulphonic Acid, 2-Cyano Phenol, 4,6 Dichloro Pyrimidine, 2-Hydroxy Phenyl Acetic Acid, Saga 545, 1,2 Octane Diol (Capryl Glycol), 1,2 Hexane Diol; 1,2 Pentane Diol; 2-Hydroxy Quinoxaline, Dipicolinic Acid | 100 | Others | MT/ Month | Road | | (5.) | Formulation of Emulsifier | 200 | Others | MT/ Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 Dec 2017 | (iv)Valid Upto | 25 Dec 2024 | (v)File No. | AWH-27113 | (vi)Application No. | GPCB/RO-ANK/ID 34047/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.73 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.10 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10.23 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 3000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HCI [ 30%] | 14.4 | Tons per Annum | | GACL, Gujarat | Road | | 68.8 | Open Market | | Copy of Linkage | (2.) | H2SO4 | 72 | Tons per Annum | | Amizar chem | Road | | 294 | Open Market | | Copy of Linkage | (3.) | CSA | 12 | Tons per Annum | | Local | Road | | 216 | Open Market | | Copy of Linkage | (4.) | Formaldehyde | 24 | Tons per Annum | | Amizar chemicals | Road | | 294 | Open Market | | Copy of Linkage | (5.) | ammonia | 6 | Tons per Annum | | Kashyap Industries | Road | | 151 | Open Market | | Copy of Linkage | (6.) | Hydrogen | 24 | Tons per Annum | | Navyug Industries | Road | | 50 | Open Market | | Copy of Linkage | (7.) | Bromine | 60 | Tons per Annum | | Vandana Chemicals | Road | | 50 | Open Market | | Copy of Linkage | (8.) | Formic Acid | 72 | Tons per Annum | | GNFC | Road | | 50 | Open Market | | Copy of Linkage | (9.) | Triphosgene | 36 | Tons per Annum | | Anatres Chem Pvt. Ltd. | Road | | 294 | Open Market | | Copy of Linkage | (10.) | EDC | 84 | Tons per Annum | | Amizar chemicals | Road | | 294 | Open Market | | Copy of Linkage | (11.) | DMS | 432 | Tons per Annum | | Panoli intermediates India Pvt. Ltd. | Road | | 10 | Open Market | | Copy of Linkage | (12.) | Phenol | 300 | Tons per Annum | | Local | Road | | 216 | Open Market | | Copy of Linkage | (13.) | Resorcinol | 84 | Tons per Annum | | Amizar chemicals | Road | | 294 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 28.53 | 19.22 | 27.84 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 95.94 | 75.38 | 95.91 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 50.79 | 42.9 | 50.64 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 26.72 | 16.08 | 25.94 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.06 | 7.51 | 7 | 8.5 | (2.) | TSS | | | mg/l | | 52 | 2 | 50 | 100 | (3.) | Heavy Metals | | Zn | mg/l | | 0.22 | 0.22 | 5 | 15 | (4.) | TDS | | | mg/l | | 1150 | 296 | 500 | 2000 | (5.) | Total Hardness | | | mg/l | | 265.05 | 158.63 | 300 | 600 | (6.) | Chlorides | | | mg/l | | 261.65 | 103.47 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0.05 | 0.05 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.33 | 8.33 | A | (2.) | DO | | mg/l | | 5.42 | 5.42 | A | (3.) | COD | | mg/l | | 24.3 | 24.3 | A | (4.) | BOD | | mg/l | | 8.16 | 8.16 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 45 | 37 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 55 | 46 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.02 | 7.16 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 208 | 25.8 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 2.34 | 1.37 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 225.4 | 98.5 | (5.) | K(Potassium) | Milligram per Kilogram | | 721 | 207 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 15 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC water supply | 26 | 10 | Copy of Permission Letter | Pipeline | | Others | GIDC pipeline | NAO/PNL/148 | 15 Mar 2019 | 26 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 3.5 | 3.5 | Soak pit & septic tank | Others | Soak pit & septic tank | 0 | 3.5 | (2.) | Industrial | 7.5 | 7.5 | Primary treatment in ETP | Others | Sent to common MEE | 0 | 7.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 11 | (b)Total Discharged Water (Kilolitre per Day) | 11 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 60 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Dil. HCL 30% | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 252 | Tons | 0 | Road | | Others | collection & sent to ETP for further treatment | (3.) | Chromium salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1536 | Tons | 120 | Road | | Others | sold to end users under rule-9 | (4.) | Organic residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 39.6 | Tons | 0 | Road | | Others | recover & reused | (5.) | cresylic acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 720 | Tons | 120 | Road | | Others | sold to end users under rule 9 | (6.) | Spent solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5988 | Tons | 0 | Road | | Others | recover & reuse | (7.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Tons | 25 | Road | | Authorized Recyclers | | (8.) | Distillation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 120 | Tons | 120 | Road | | Others | Co-processing in cement industries or CHWIF | (9.) | Spent sulfuric acid (60-70%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 120 | Road | | Others | sold to end users under rule-9 | (10.) | Sodium Bisulfite 22% | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 249.6 | Tons | 0 | Road | | Others | collection & sent to ETP for further treatment | (11.) | TES. H3PO4 salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 864 | Tons | 120 | Road | | Others | sold to end users under rule 9 | (12.) | Used oil | Industrial Waste | | 6 | Tons | 25 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 95.94 | 3.97 | 0.04 | 96 | 100 | (2.) | NOx | | Microgram per Meter Cube | 28.53 | 3.97 | 0.02 | 29 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 26.72 | 3.97 | 0.07 | 27 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 50.79 | 5.7 | 0.02 | 51 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Spray dryer | -- | 11 | 0.1 | Others | SPM | 150 mg/Nm3 | (2.) | Thermopack | Natural gas | 30 | 0.4 | Others | SPM, SOx, NOx | 150, 262, 94 mg/Nm3 | (3.) | Boiler | Natural gas | 30 | 0.3 | Others | SPM, SOx, NOx | 150, 262, 94 mg/Nm3 | (4.) | Reaction vessel-I | -- | 11 | 0.1 | SO2 | | 40 mg/Nm3 | (5.) | Reaction vessel - II | -- | 11 | 0.1 | Others | HCl | 20 mg/Nm3 | (6.) | DG set | Diesel | 10 | 0.2 | Others | SPM, SOx, NOx | 150, 262, 94 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 100 | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.1 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 25412.99 | (b)Waste/Barren Land (ha.) | 00 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 595.03 | (e)Settlements (ha.) | 1324.16 | (f)Industrial (ha.) | 3084.82 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Scrubland | 999.15 | Total (ha.) | 31416.1500 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.048 | | (2.) | Green belt | | 0.03 | | (3.) | Others | Other infrastructure | 0.022 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | NA | 00 | -- | (2.) | Critically Polluted Area | Ankleshwar | 6 | Industry located in GIDC - Panoli | (3.) | WLS | NA | 00 | -- | (4.) | NPA | NA | 00 | -- | (5.) | Corridors | NA | 00 | -- | (6.) | ESAs | NA | 00 | -- | (7.) | ESZs | NA | 00 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 00 | -- | (2.) | Forest | | NA | 00 | -- | (3.) | Archaeological Sites | | NA | 00 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.01 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 10 Schedule-I species present in Buffer area | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1022500 | (iii)Period of Implementation | 2 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bhadi pond | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 4.23 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 330 | (f)Total Manpower | 25 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.03 | (b)Percentage of Total Project Area | 30.00 | (c)No. of Plants to be Planted | 60 | (d)Funds Allocated for Plantation | 250000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Implementation of Technopark Phase III will lead to employment generation in the IT/ITES sector. | (2.) | Financial | This project will lead to economic growth of the country. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay order against NABET/ QCI | (ii)Name of the EIA Consultant | M/s. Aqua Air Environmental Engineers Pvt. Ltd. | (iii)Address | M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT) | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sahil P Maloakar | Designation | Director | Name of Company (Applicant Name should not be given here) | SAGA CHEMIE PVT LTD | Address | Plot No 201/3, GIDC Industrial Estate -Panoli, Dist: Bharuch |
|