Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) SETTING UP NEW PESTICIDE & PESTICIDE INTERMEDIATE PLANT IN EXISTING FORMULATING UNIT
(b)Name of the Company / Organisation SAGA CHEMIE PVT LTD
(c)Registered Address Plot No 201/3, GIDC Industrial Estate -Panoli, Dist: Bharuch,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sahil P Maloakar
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 201/3, GIDC Industrial Estate-Panoli, Dist Bharuch,,Anklesvar,Bharuch,Gujarat-394116
(d)Pin code 394116
(e)E-mail sagachemied@gmail.com
(f)STD Code. 2646(f)Telephone No. 207394
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/78833/2018
(d)Master Proposal Number(Single Window) SW/163647/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 201/3, GIDC estate, Panoli
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21.573087
Minutes
Second
From
Degree 21.573480
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.997254
Minutes
Second
From
Degree 72.997414
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 15
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
(2.)West BengalBarddhamanBarabaniPanuria and 7 other villages
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/280/2018-IA-II(I)
(b)Date of Apply of TOR 29 Sep 2018
(c)Date of Issue of TOR / Standard ToR 04 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project site is located in Notified Industrial area of GIDC, Panoli
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Air Compressor200 liter
(2.)Cooling tower125 TR
(3.)Double cone blender500 Liter
(4.)Autoclave2 KL * 2 Nos.
(5.)Thermopack600000 Kcal
(6.)Glass line reactor5 KL * 6 Nos.
(7.)Distillation system1.5 KL * 2 Nos.
(8.)ML transfer pump8 M3 /hr
(9.)Boiler850 Kg/ Hr
(10.)Nutche filter1.5 KL
(11.)SS-316 REACTOR3 KL * 6 Nos.process plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Repacking of PGA, EDTA, SBS powder, Phosphoric acid, 2,6 Dipicolonic acid, SBS solution, Acetic acid derivatives, Indicator & stain powder, Metheline Blue, Butyric acid, Citrazinic Acid, HydroxylamineHydrochloride, 1-Hydroxy Benzotrizole, 2-Hydroxy quinoxaline50OthersMT/ MonthRoad
(2.)Pesticide & Agrochemicals formulation and Repacking (job work & own manufacturing)200OthersMT/ MonthRoad
(3.)Sodium Hydrogen Sulphide300OthersMT/ MonthRoad
(4.)Para Chloro Meta Cresol, Para Chloro Meta Xylenol, Para Chloro Ortho Cresol, Para Chloro Meta Toludine, Chloro phenol, Cyclopentanone, Benzophenone 3, Benzophenone 4, Tertiary Butyl Isocynate, Tertiary Butyl Chloride, Tertiary Butyl Carbitol Phosphite, Tris Tridecyl Phosphite, Ethyl Benzyl Meta Sulphonic Acid, 2-Cyano Phenol, 4,6 Dichloro Pyrimidine, 2-Hydroxy Phenyl Acetic Acid, Saga 545, 1,2 Octane Diol (Capryl Glycol), 1,2 Hexane Diol; 1,2 Pentane Diol; 2-Hydroxy Quinoxaline, Dipicolinic Acid100OthersMT/ MonthRoad
(5.)Formulation of Emulsifier200OthersMT/ MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Dec 2017
(iv)Valid Upto 25 Dec 2024
(v)File No. AWH-27113
(vi)Application No. GPCB/RO-ANK/ID 34047/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.73
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10.23
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HCI [ 30%]14.4Tons per AnnumGACL, GujaratRoad68.8 Open MarketCopy of Linkage
(2.)H2SO472Tons per AnnumAmizar chemRoad294 Open MarketCopy of Linkage
(3.)CSA12Tons per AnnumLocalRoad216 Open MarketCopy of Linkage
(4.)Formaldehyde24Tons per AnnumAmizar chemicalsRoad294 Open MarketCopy of Linkage
(5.)ammonia6Tons per AnnumKashyap IndustriesRoad151 Open MarketCopy of Linkage
(6.)Hydrogen24Tons per AnnumNavyug IndustriesRoad50 Open MarketCopy of Linkage
(7.)Bromine60Tons per AnnumVandana ChemicalsRoad50 Open MarketCopy of Linkage
(8.)Formic Acid72Tons per AnnumGNFCRoad50 Open MarketCopy of Linkage
(9.)Triphosgene36Tons per AnnumAnatres Chem Pvt. Ltd.Road294 Open MarketCopy of Linkage
(10.)EDC84Tons per AnnumAmizar chemicalsRoad294 Open MarketCopy of Linkage
(11.)DMS432Tons per AnnumPanoli intermediates India Pvt. Ltd.Road10 Open MarketCopy of Linkage
(12.)Phenol300Tons per AnnumLocalRoad216 Open MarketCopy of Linkage
(13.)Resorcinol84Tons per AnnumAmizar chemicalsRoad294 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube28.5319.2227.8480
(2.)PM10Micro Gram per Meter Cube95.9475.3895.91100
(3.)PM2.5Micro Gram per Meter Cube50.7942.950.6460
(4.)SO2Micro Gram per Meter Cube26.7216.0825.9480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.067.5178.5
(2.)TSSmg/l52250100
(3.)Heavy MetalsZnmg/l0.220.22515
(4.)TDSmg/l11502965002000
(5.)Total Hardnessmg/l265.05158.63300600
(6.)Chloridesmg/l261.65103.472501000
(7.)Fluoridemg/l0.050.0511.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.338.33A
(2.)DOmg/l5.425.42A
(3.)CODmg/l24.324.3A
(4.)BODmg/l8.168.16A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))453745
(2.)Leq(Day)A-weighted decibels(dB(A))554655
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.027.16
(2.)P(Phosphorus)Milligram per Kilogram20825.8
(3.)Electric ConductivityMillisiemens per Centimetre2.341.37
(4.)N(Nitrogen)Milligram per Kilogram225.498.5
(5.)K(Potassium)Milligram per Kilogram721207
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 15
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water supply2610Copy of Permission LetterPipelineOthersGIDC pipelineNAO/PNL/14815 Mar 201926
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3.53.5Soak pit & septic tankOthersSoak pit & septic tank03.5
(2.)Industrial7.57.5Primary treatment in ETPOthersSent to common MEE07.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 11
(b)Total Discharged Water (Kilolitre per Day) 11
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons60RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Dil. HCL 30%Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)252Tons0RoadOtherscollection & sent to ETP for further treatment
(3.)Chromium saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1536Tons120RoadOtherssold to end users under rule-9
(4.)Organic residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)39.6Tons0RoadOthersrecover & reused
(5.)cresylic acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)720Tons120RoadOtherssold to end users under rule 9
(6.)Spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5988Tons0RoadOthersrecover & reuse
(7.)Discarded containers/ barrels/ linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons25RoadAuthorized Recyclers
(8.)Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)120Tons120RoadOthersCo-processing in cement industries or CHWIF
(9.)Spent sulfuric acid (60-70%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons120RoadOtherssold to end users under rule-9
(10.)Sodium Bisulfite 22%Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)249.6Tons0RoadOtherscollection & sent to ETP for further treatment
(11.)TES. H3PO4 saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)864Tons120RoadOtherssold to end users under rule 9
(12.)Used oilIndustrial Waste6Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube95.943.970.0496100
(2.)NOxMicrogram per Meter Cube28.533.970.022980
(3.)SO2Microgram per Meter Cube26.723.970.072780
(4.)PM2.5Microgram per Meter Cube50.795.70.025160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Spray dryer--110.1OthersSPM150 mg/Nm3
(2.)ThermopackNatural gas300.4OthersSPM, SOx, NOx150, 262, 94 mg/Nm3
(3.)BoilerNatural gas300.3OthersSPM, SOx, NOx150, 262, 94 mg/Nm3
(4.)Reaction vessel-I--110.1SO240 mg/Nm3
(5.)Reaction vessel - II--110.1OthersHCl20 mg/Nm3
(6.)DG setDiesel100.2OthersSPM, SOx, NOx150, 262, 94 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 100
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.1
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25412.99
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 595.03
(e)Settlements (ha.) 1324.16
(f)Industrial (ha.) 3084.82
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Scrubland 999.15
    Total (ha.) 31416.1500
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.048
(2.)Green belt0.03
(3.)OthersOther infrastructure0.022
Total (ha.) 0.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNA00--
(2.)Critically Polluted AreaAnkleshwar6Industry located in GIDC - Panoli
(3.)WLSNA00--
(4.)NPANA00--
(5.)CorridorsNA00--
(6.)ESAsNA00--
(7.)ESZsNA00--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA00--
(2.)ForestNA00--
(3.)Archaeological SitesNA00--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.01
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 10 Schedule-I species present in Buffer area
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1022500
(iii)Period of Implementation 2 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhadi pond
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 4.23
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 330
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.03
(b)Percentage of Total Project Area 30.00
(c)No. of Plants to be Planted 60
(d)Funds Allocated for Plantation 250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialImplementation of Technopark Phase III will lead to employment generation in the IT/ITES sector.
(2.)FinancialThis project will lead to economic growth of the country.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay order against NABET/ QCI
(ii)Name of the EIA Consultant M/s. Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address M/S. AQUA – AIR ENVIRONMENTAL ENGINEERS PVT. LTD. 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJARAT)
(iv)Mobile No. 9904433995
(v)Landline No. 0261246124
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSahil P Maloakar
DesignationDirector
Name of Company (Applicant Name should not be given here)SAGA CHEMIE PVT LTD
AddressPlot No 201/3, GIDC Industrial Estate -Panoli, Dist: Bharuch
Print