Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) New Kathara Coking Coal Washery
(b)Name of the Company / Organisation Central Coalfields Limited
(c)Registered Address DARBHANGA HOUSE, CCL, RANCHI,,Ranchi,Jharkhand-834029
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ranjan Mishra
(b)Designation (Owner/ Partner/ CEO) PO
(c)Address Project Officer,Kathara Washery,Kathara Area,,Gumia,Bokaro,Jharkhand-829116
(d)Pin code 829116
(e)E-mail pokatharawashery@gmail.com
(f)STD Code. 651(f)Telephone No. 235366
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/CMIN/77799/2018
(d)Master Proposal Number(Single Window) SW/163266/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1373, 1394, 1395, 1396, 1397, 1398,1399, 1400, 140
(b)Pincode 829116
(c)Bounded Latitudes (North)
From
Degree 23.75108
Minutes
Second
From
Degree 23.75527
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.86821
Minutes
Second
From
Degree 85.87401
Minutes
Second
(e)Survey of India Topo Sheet No. 73E/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 238
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandBokaroGumia
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/98/2018-IA-II(M)
(b)Date of Apply of TOR 12 Oct 2018
(c)Date of Issue of TOR / Standard ToR 15 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :2
Officer’s Club, Kathara Area, CCL, PO-Kathara, District- Bokaro
State :Jharkhand
District :Bokaro
Tehsil :Gumia
Village :Bandh Kathara
115Major issues raised in the public hearing are related to employment, Pollution Control, Safety, R & R, Health etc.OthersDirector, District Village Development Board
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Coking Coal Washery3 MTPAThis washery is proposed on BOO basis.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Washed Coal (Power)0.20OthersMTYRail
(2.)Rejects0.98OthersMTYRoad
(3.)Washed Coal/Clean Coal1.82OthersMTYRail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 269.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.38
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.0425
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.39
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal3OthersMTYGovindpur OCP & kathara OCP of CCLRoad3 OthersMines of CCLCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 24 Apr 2019 To 07 Jun 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube124.652.5123.45250
(2.)SO2Micro Gram per Meter Cube28.57.427120
(3.)PM2.5Micro Gram per Meter Cube55.421.250.7560
(4.)NOxMicro Gram per Meter Cube13.55.413.5120
    14.2.     No. of Ground Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)OthersNitratemg/l0.50.54545
(2.)OthersCynidemg/l0.010.010.050.05
(3.)Chloridesmg/l25.9913.992501000
(4.)Heavy MetalsAsmg/l0.010.010.010.05
(5.)OthersAlkalinitymg/l26626200600
(6.)OthersBoronmg/l110.51
(7.)OthersFemg/l0.140.10.30.3
(8.)OthersDetergentmg/l0.050.050.21.0
(9.)OthersPhenolic Compoundmg/l0000
(10.)OthersCamg/l49.6918.4375200
(11.)OthersResidual Chlorinemg/l0.050.050.21.0
(12.)OthersSemg/l000.010.01
(13.)pHNA7.176.758.58.5
(14.)TSSmg/l555002000
(15.)OthersColorOthersHazen11515
(16.)TDSmg/l3401485002000
(17.)Total Hardnessmg/l33490200600
(18.)OthersNitratemg/l0.50.54545
(19.)OthersZincmg/l0.20.2515
(20.)OthersSulphatesmg/l49.7517.12200400
(21.)OthersAlmg/l000.030.2
(22.)Fluoridemg/l0.10.111.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.497.10C
(2.)OthersTotal Hardness as caco3mg/l950108C
(3.)OthersCopper as Cumg/l0.40.4C
(4.)OthersSulphatemg/l351.0561.55C
(5.)OthersMaganese as Mnmg/l0.50.5C
(6.)BODmg/l186C
(7.)DOmg/l6.56.2C
(8.)OthersMercury as Hgmg/l0.010.01C
(9.)OthersPhenolic compoundmg/l00C
(10.)OthersHexavalent Chromium as cr6+mg/l0.010.01C
(11.)OthersTotal ColiformOthersMPN/100ml00C
(12.)OthersOil & Greasemg/l87C
(13.)OthersCalcium as Camg/l140.324.84C
(14.)CODmg/l00C
(15.)OthersMagnesium as Mgmg/l145.8011.70C
(16.)OthersCadmium as Cdmg/l0.40.4C
(17.)OthersLead as Pbmg/l0.220.22C
(18.)OthersZinc as Znmg/l0.20.2C
(19.)OthersIronmg/l0.10.1C
(20.)OthersFluoridemg/l0.810.41C
(21.)OthersTotal Suspended Solidsmg/l185C
(22.)OthersColorOthersCU11C
(23.)OthersCadmium as Cdmg/l0.40.4C
(24.)OthersChloridemg/l14.995.99C
(25.)OthersNitratemg/l1.260.72C
(26.)OthersSaleniummg/l0.010.01C
(27.)OthersArsenic as Asmg/l0.010.01C
(28.)OthersTotal Dissolved Solidmg/l1224232C
(29.)OthersCynidemg/l0.010.01C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.647.175
(2.)Leq(Night)A-weighted decibels(dB(A))65.941.770
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.296.23
(2.)N(Nitrogen)Milligram per Kilogram44.5628.56
(3.)K(Potassium)Kilogram per hectare182.50113.70
(4.)P(Phosphorus)Kilogram per hectare2.132
(5.)Electric ConductivityOthersmicro S/cm48.2041.26
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.54 To 5.60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.46 To 6.9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersQuarry water18692 Not Appliacble modeOthersThrough pipelineOthersMine pumpNot Applicable29 Feb 20201869
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Washery Operation14981498with Washed coalOtherswith washed coal01498
(2.)Washery Operation210210with RejectsOthersWIth Washery Rejects0210
(3.)Washery Operation70007000ETP & Water recoveryReuse within the Plant & Recycling7000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8708
(b)Total Discharged Water (Kilolitre per Day) 1708
(c)Total Reused Water (Kilolitre per Day) 7000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Oily Waste & Soaked CottonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons0RoadOthersstored in a concrete impervious hazardous bin
(2.)Burnt OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)26Kilolitre5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube12.61.13.315.9280
(2.)SO2Microgram per Meter Cube24.31.10.1624.4780
(3.)PM10Microgram per Meter Cube122.8028.56151.36250
(4.)PM2.5Microgram per Meter Cube46.51.12.549.0260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM10NA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 7500
(b)Source CCL substation
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.18
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 11.15
    Total Land (ha.) 11.33
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2.97
(b)Waste/Barren Land (ha.) 8.36
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 11.3300
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.99
(2.)Green belt0.66
(3.)OthersBunker,Reject Site, Slurry pond etc5.68
Total (ha.) 11.33
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil10No Critically polluted area within 10 KMs
(2.)Wildlife CorridorsNil10No Wildlife Corridors Within 10 KM
(3.)NPANil10No NPA Within 10 KM
(4.)WLSNil10No WLS within 10 KMs
(5.)ESZsNil10No ESZs Within 10 KM
(6.)ESAsNil10No ESAs Within 10 KM
(7.)CorridorsNil10No Corridors Within 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil10No Forest Range, national park etc.
(2.)Archaeological SitesNil10No Archaeological Sites within 10 km
(3.)Defence InstallationsNil10No Defence Installation within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.33
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Avifauna Peafowl come under Schedule-I species as per Indian wildlife (protection) Act, 1972 was found in the buffer zone.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 24
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tenughat Reservoir, Konar River Damodar River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 120
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 600
(e)No. of working days 330
(f)Total Manpower 1320
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.66
(b)Percentage of Total Project Area 5.83
(c)No. of Plants to be Planted 2250
(d)Funds Allocated for Plantation 1471500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe adoption of cloud-based services is growing significantly worldwide. The India data center market is expected to reach values of approximately $4 billion by 2024, growing at CAGR of around 9% during 2018-2024. The increase in demand for cloud computing, big data, and IoT services has been aiding the market growth. Increase in internet population, use of smart devices, and social media growth as prompted both central and state government to migrate from the existing traditional service offeri
(2.)SocialThe project will bring various social developments to the nearby area. The project shall enhance the socio-economic status of the area by increasing local and regional economic investment and expenditure and this will increase the demand for housing and other infrastructure in the region. The project will create direct employment both during construction and operation. Indirect employment will also be created from the direct employment and expenditure by the Project Developer. Corporate Social R
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Not Applicable as it is Coking Coal washeryMajor
2.
Mine Capacity in ROM (Run of Mine) 0
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. CS/BM/483/2020/153
(b)Date of Approval 25 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department CCL Board
(e)Approved Mining Lease Area 11.33
(f)Approved Capacity 3
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0
(b)Mineable Reserves (Million Ton) 0
(c)Extractable Reserves(Million Ton) 0
(d)Percent(%) of Extraction 0
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) NA
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 3
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11000 crushing of -1000mmsize coal down to 200mm size in primary twin shaft sizer
(2.)21000 Crushing of -200mm size coal down to 50mm size in secondary twin shaft sizer
(3.)31000 crushing of +13mm size fraction down to 13mm in teriary crusher and mixing with -13mm size fraction
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 11.33
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Land acquired under CBA(SO no. 3810 dtd. 23.11.57)
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Land acquired under CBA(SO no. 3810 dtd. 23.11.57)
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Land acquired under CBA(SO no. 3810 dtd. 23.11.57)
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface NA
(b)Surface to Siding/Loading Raw coal will be fed to washery through road
(c)Transportation / Conveyor Details washed coal will be transported by conveyor belt t
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND2.9702.97
(2.)FOREST LAND000
(3.)GRAZING LAND000
(4.)WASTE LAND8.3608.36
(5.)SURFACE WATER BODIES000
(6.)SETTLEMENTS000
TOTAL11.33011.33
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT11.330011.33
(2.)EXTERNAL OB DUMPS0000
(3.)VIRGIN AREA0000
(4.)INTERNAL OB DUMPS0000
(5.)EXCAVATION/QUARRY0000
(6.)ROADS0000
(7.)TOP SOIL STORAGE0000
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL11.3300011.33
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 11.33
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201900000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0092
(ii)Name of the EIA Consultant CENTRAL MINE PLANNING AND DESIGN INSTITUTE LIMITED
(iii)Address Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand
(iv)Mobile No. 8987788960
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply for ADS of New Kathara Coking Coal Washery 16 Nov 2020
2. ADS Reply LetterReply for ADS of New Kathara Coking Coal Washery 16 Nov 2020
3. ADS Reply LetterReply for ADS of New Kathara Coking Coal Washery 16 Nov 2020
4.NA

The EAC after deliberation on submission of project proponent, observed that details submitted are incomplete and require more inputs from PP. Further data presented was having various discrepancies, PP and its consultant should be extra cautious while presenting the data.  EAC desires further response on the following observation

 

·                PP shall present the compliance of ToR submitted in EIA/EMP to the EAC

·                Air pollution modelling due to increase traffic along with presence of habitation shall be produced before EAC

·                Reason of not proposing to implement conveyor transport from Kathara OCP to washery which is only 3 km away

·                Ground Water Recharge Estimation of buffer zone submitted in EIA shall be presented

·                Since the area comes under over extracted with regard to ground water and also there are various NGT cases related to this Prior permission of CGWA is must.

·                Proposed fund alloted for development of green belt is very less and accordingly shall be increased and year wise plantation plan shall be provided

·                Proposed utilisation of Washery rejects in 20 MW power plant shall be submitted. MoU stating the utilisation quantity shall be furnished.

·                Mine Approval document submitted by PP does not quote anywhere that area of washery has excluded from Kathara OCP instead it has been approved for extension of validity of EC from MoEF. PP must clarify.

·                Quality of road as given in EIA/EMP at chapter 7 (section 7.5) is very poor and may increase the dust generation. Plan for improvement of quality of road (if any)

 

The proposal was deferred on the above lines

14 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRanjan Mishra
DesignationPO
Name of Company (Applicant Name should not be given here)Central Coalfields Limited
AddressDARBHANGA HOUSE, CCL, RANCHI
Print