Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Coast Guard Jetty and allied facilities within existing Okha Port, Okha, District-Devbhumi Dwarka, Gujarat
(b)Name of the Company / Organisation Gujarat Maritime Board
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) Deputy General Manager (Env)
(c)Address NIL
(d)Pin code 382010
(e)E-mail aasharma.envgmb@gmail.com
(f)STD Code. (f)Telephone No.
(g)Fax No. 23248733
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIS/65908/2017
(d)Master Proposal Number(Single Window) SW/162177/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. The survey no: for Okha Port is 569
(b)Pincode 361350
(c)Bounded Latitudes (North)
From
Degree 22.464544
Minutes
Second
From
Degree 22.474731
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 69.075531
Minutes
Second
From
Degree 69.083197
Minutes
Second
(e)Survey of India Topo Sheet No. 41B/15 and 41F/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 8
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratDevbhumi DwarkaOkhamandal
(2.)GujaratDevbhumi DwarkaOkhamandalOkha
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-45/2017-IA.III
(c)Date of Apply of TOR 04 Jul 2017
(d)Date of Issue of TOR / Standard ToR 11 Sep 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0.48
Dothiwala Club, Okha, Gujarat
State :Gujarat
District :Devbhumi Dwarka
Tehsil :Okhamandal
Village :Okha
140Safety concern of the people and vessel handling towards south of lighter Wharf (Govindh Ghat), for which GMB has proposed for construction of safety wall. The public welcomed the project and explaineOthersThe Public Hearing was presided over by Regional Officer, GPCB, along with Resident Additional Collector (and) Additional District magistrate, Devbhumi Dwarka.
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Construction of ICG jetty & approach TrestleJetty: 200X20m, Approach trestle: 120x50mIndian Coast Guard Jetty
(2.)Extension of Govind Ghat (Lighter Wharf)40X15.45mExtension of existing Govind Ghat lighter wharf
(3.)Reclamation0.9 haReclamation & Beautification - ICG Jetty
(4.)Total Cargo Handling Capacity10 MMTPAExisting cargo handling capacity - 6 MMTPA
(5.)Maintenance Dredging34125 cu.mMaintenance dredging carried only when required
(6.)Capital Dredging341250 cu.mfacilitate upto -8m depth
(7.)Reclamation1.26 haReclamation & Beautification - passenger jetty
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cargo handling capacity10OthersMMTPARoad,Conveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Sep 2019
(iv)Valid Upto 20 Sep 2020
(v)File No. AWH-97050
(vi)Application No. PC/CCA-JMN-1024/ID-30407/477549
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 107.76
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.77
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.81
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.17
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not applicable as there is no production processes0OthersNA0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 11 Dec 2017 To 11 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube16.812.5916.7780
(2.)NOxMicro Gram per Meter Cube30.239.7029.9280
(3.)PM2.5Micro Gram per Meter Cube33.1021.4233.0560
(4.)PM10Micro Gram per Meter Cube70.2549.3770.03100
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l48739502501000
(2.)Fluoridemg/l0.280.2111.5
(3.)Heavy MetalsIronmg/l0.090.020.30.3
(4.)Total Hardnessmg/l3150420200600
(5.)OthersDissolved Oxygenmg/l7.27.100
(6.)TDSmg/l831222825002000
(7.)TSSmg/l40200
(8.)pHNA7.67.26.58.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTurbidityOthersNTU27014A
(2.)DOmg/l6.86.2A
(3.)BODmg/l122A
(4.)pHNA7.27.1A
(5.)CODmg/l5624B
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.54675
(2.)Leq(Night)A-weighted decibels(dB(A))55.736.870
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram1424344
(2.)pH8.16.6
(3.)N(Nitrogen)Milligram per Kilogram584110
(4.)P(Phosphorus)Milligram per Kilogram18848.4
(5.)Electric ConductivityOthersMicrosiemens Per Centimeter25840410
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.00 To 5.00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.00 To 5.00
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGadechi Water Works under GWSSB45022Copy of Permission LetterPipelineOthersNAGMB/OKH/C/WS/WE/005-195001 Jan 1934450
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water75100STPReuse within the Plant & Recycling,Green Belt Renewal Plant75
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 75
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 75
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500000Tons0RoadAuthorized Recyclers
(2.)Solid wasteMunicipal Solid Waste383.25Tons0RoadAuthorized Recyclers
(3.)Non-biodegradable wasteMunicipal Solid Waste127.75Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.250878.26100
(2.)PM2.5Microgram per Meter Cube33.100336.1160
(3.)NOxMicrogram per Meter Cube30.230333.2480
(4.)SO2Microgram per Meter Cube16.440319.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)70 KVADiesel30.2PM100, DG Set is only for Backup Purpose
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 150
(b)Source Paschim Gujarat Vij Company Limited (PGVCL)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Okha Port has a backup D.G sets of 70 kVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 6.0128
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 6.0128
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2111
(b)Waste/Barren Land (ha.) 911
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 170
(e)Settlements (ha.) 1159
(f)Industrial (ha.) 0
(g)Forest (ha.) 572
(h)Mangroves (ha.) 145
(i)Marine Area (ha.) 24955
(j)Others (ha.) : Coastal Wetland, Salt affected Land, Salt Pan, Isl 1445
    Total (ha.) 31468.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.0618Extension of Govid Ghat (Lighter Wharf)
(2.)Built Up Area11Ha ICG Jetty & Approach trestle construction
(3.)Green belt2.8Greenbelt development
(4.)OthersReclamation within Port Boundary2.16Reclamation within Port Boundary
Total (ha.) 6.0218
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within the 10km Study Area0None within the 10km Study Area
(2.)ESAsArambada ESA/MNP2.36Arambada ESA/MNP 2.36km @SW, Adatra ESA/MNP 3.12km @SW, Padli ESA/MNP 7.29km @SSW, Hamusar ESA/MNP 7.65km @SSW, Shamlasar ESA/MNP 8.62km @S, Positra ESA/MNP 9.34km @SSE , Mangroves in, Arambada ESA/M
(3.)CorridorsNone within the 10km Study Area0None within the 10km Study Area
(4.)WLSNone within the 10km Study Area0None within the 10km Study Area
(5.)NPAArambada ESA/MNP2.36Arambada ESA/MNP 2.36km @SW, Adatra ESA/MNP 3.12km @SW, Padli ESA/MNP 7.29km @SSW, Hamusar ESA/MNP 7.65km @SSW, Shamlasar ESA/MNP 8.62km @S, Positra ESA/MNP 9.34km @SSE , Mangroves in, Arambada ESA/M
(6.)ESZsNone within the 10km Study Area0None within the 10km Study Area
(7.)Wildlife CorridorsNone within the 10km Study Area0None within the 10km Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRF at Northern boundary of Bet Shankhodhar Adatra3.26RF at Northern boundary of Bet Shankhodhar Adatra 3.26km @E, RF at Southern boundary of Bet Shankhodhar 3.48km @SSE, KYU Reserve Forest 6.8km @SSE, Positra RF 9.44km @SE, RF at South of Positra villag
(2.)Defence InstallationsNone within the 15km Study Area0None within the 15km Study Area
(3.)Archaeological SitesNone within the 15km Study Area0None within the 15km Study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable as proposed project will be develop
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl - Pavo cristatus, Olive Readily Sea turtle - Lepidochelys olivacea, Green Sea turtle - Chelonia mydas
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 16.5 Lakhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Gulf of Kutch - 0km
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arambada backwater, Ponds in Surajkaradi, Ponds in Hamsura
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1.65
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 120
(d)Temporary Employment- During Operation 65
(e)No. of working days 350
(f)Total Manpower 230
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.8
(b)Percentage of Total Project Area 46.57
(c)No. of Plants to be Planted 5600
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IB
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any Not Applicable
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies One Season Terrestrial Baseline Monitoring Carried
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 11 Dec 2017
(iv)Period of Study To (EIA Terrestrial) 11 Mar 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies One Season Marine Baseline Monitoring Carried Out
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 02 Feb 2018
(iv)Period of Study to (EIA Marine) 09 Feb 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan The port has an Tier-1 OSCP prepared by NIO, Goa
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps National Center for Sustainable Coastal Management
(ii)Please Specify with salient features Port and Harbors
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IB
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained No
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed Strict adherence to the provision of the CRZ Notif
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) Entire development occurs within the approved port
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 3.3
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 60218
(e)Total built up area (sqm) 1188
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Dry bulk cargo - Coal, Coke, Bauxite, Fertilizer,
(d)Quantity of Cargo 10
(e)Control Measures of Cargo Mechanized cargo handling
(f)Dust Control Measures Installation of DFDS system, wind barriers in carg
(g)Quantum 177
(h)Quantity of Dredging (Cubic meter per day) 487.5
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Dredged material completely used for land reclamat
(k)Details of Outfall Diffusers Not applicable
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall Not applicable
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0.015Ha Open Parking Area will be developed in the
5.
Energy Saving Measures:
(a)Source/Mode Installation of LED Bulbs and Solar powered lights
(b)Percentage 5
(c)Quantity 300
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Impacts during construction of Water front infrast
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act The quantity of trade effluents from the factory shall be "Nil", Diesel shall be used for DG Set Operation, comply with guidelines issued for handling of coal at port as per annexure of condition document
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Not applicable as being a port facility, complied,
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0170
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Dare House, 4th Floor, No.2, NSC Bose Road, Chennai - 600001
(iv)Mobile No. 7010898601
(v)Landline No. 0443044562
(vi)Email Id inquiry@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 23 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationDeputy General Manager (Env)
Name of Company (Applicant Name should not be given here)Gujarat Maritime Board
Address"Sagar Bhavan", Sector 10/A, OPp: Air force Station, Sachivalaya, Gandhinagar - 382010
Print