Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction (Including Structural Design) of 640 dwelling unit in 20 Nos. of G+3 Blocks (32 DU’s in each Blocks) at Plot No. - 2302, Khata No. – 148, Thana No. 25, village – Kalapathar, Tehsil, Chas, District Bokaro, Jharkhand
(b)Name of the Company / Organisation M/S. JHARKHAND URBAN INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
(c)Registered Address 3rd floor, RRDA Building, Pragati Sadan, near kutchery road, ranchi, jharkhand,,Ranchi,Jharkhand-834001
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjay kumar Singh
(b)Designation (Owner/ Partner/ CEO) Projectmanager
(c)Address 3rd floor, RRDA Building, Pragati Sadan, near kutchery road, ranchi, jharkhand,,Namkum,Ranchi,Jharkhand-834001
(d)Pin code 834001
(e)E-mail judicopmayproject@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/JH/NCP/161991/2020
(d)Master Proposal Number(Single Window) SW/161986/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. - 2302, Khata No. – 148, Thana No. 25,
(b)Pincode 827001
(c)Bounded Latitudes (North)
From
Degree 23.404338
Minutes
Second
From
Degree 23.404877
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.121418
Minutes
Second
From
Degree 86.121609
Minutes
Second
(e)Survey of India Topo Sheet No. --
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1274
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Proposed project is of Schedule 8 (a)
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Builtup area23638.62 sq.m.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up area23638.62Otherssq.m.OthersConstruction project
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jul 2020
(iv)Valid Upto 02 Jul 2020
(v)File No. Nil
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 35.92
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.89
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.70
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.295
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Construction materials00OthersNAopen marketRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 14 May 2020 To 21 May 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube112112110100
(2.)PM2.5Micro Gram per Meter Cube71.5071.5070.5060
(3.)NOxMicro Gram per Meter Cube30.2630.262980
(4.)SO2Micro Gram per Meter Cube20.1820.182080
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l7.127.1269
(2.)TDSmg/l3573575002000
(3.)OthersnaNA0000
(4.)Heavy Metalsfemg/l0.330.330.31
(5.)TSSNA0000
(6.)Chloridesmg/l20.5020.502501000
(7.)FluorideNA0000
(8.)Total Hardnessmg/l6565200600
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.137.13C
(2.)BODmg/l3.63.6C
(3.)CODmg/l2222C
(4.)DOmg/l6.36.3C
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))242445
(2.)Leq(Day)A-weighted decibels(dB(A))404055
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram218.60218.60
(2.)Electric ConductivityMillisiemens per Centimetre258258
(3.)pH7.117.11
(4.)N(Nitrogen)00
(5.)P(Phosphorus)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.65 To 5.30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.70 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal water supply2010Copy of Permission LettermodeOthersMunicipal water supplyOthersMunicipal water supply001 Jul 2020201
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic247300STPReuse within the Plant & Recycling247
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 247
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 247
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal WasteMunicipal Solid Waste1.92Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube11200112.1100
(2.)SO2Microgram per Meter Cube20.180020.1980
(3.)PM2.5Microgram per Meter Cube71.500071.5160
(4.)NOxMicrogram per Meter Cube30.260030.2780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Nil000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 565
(b)Source State electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.61
    Total Land (ha.) 1.61
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 1.61
    Total (ha.) 1.6100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.61
Total (ha.) 1.61
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0Nil
(2.)NPANil0Nil
(3.)ESZsNil0Nil
(4.)CorridorsNil0Nil
(5.)Critically Polluted AreaNil0Nil
(6.)WLSNil0Nil
(7.)Wildlife CorridorsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Nil
(2.)Archaeological SitesNil0Nil
(3.)Defence InstallationsNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.61
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Accquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 187
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 187
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.25
(b)Percentage of Total Project Area 15.53
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProject will provide infrastructure development and employment opportunity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 12
(b)Total No. of Flats to be Build 640
(c)No. of Buildings 1
(d)Total plot area (sqm) 16174.47
(e)Total built up area (sqm) 23638.62
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 10
(b)Capacity 8
(c)No. of Recharge Pits 10
(d)Capacity 9.42
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 128
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 1
(c)Quantity 5
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1992/IA0053
(ii)Name of the EIA Consultant P and M Solution
(iii)Address 1st Floor, C-88, B Block, Sector 65, Noida, Uttar Pradesh 201301
(iv)Mobile No. 9555548342
(v)Landline No. 0120432172
(vi)Email Id pmsolutionbxr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 10 Dec 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjay kumar Singh
DesignationProjectmanager
Name of Company (Applicant Name should not be given here)M/S. JHARKHAND URBAN INFRASTRUCTURE DEVELOPMENT COMPANY LIMITED
Address3rd floor, RRDA Building, Pragati Sadan, near kutchery road, ranchi, jharkhand
Print