Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Petrochemical Complex by Adding Polypropylene Unit at Pata, District Auraiya, Uttar Pradesh by M/s Gail (India) Limited
(b)Name of the Company / Organisation GAIL INDIA LIMITED PATA
(c)Registered Address GAIL PATA,,Auraiya,Uttar Pradesh-206241
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SANJIV BHALLA
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address GAIL BHAWAN,16 BHIKAIJI CAMA PLACE,NEW DELHI-110066,Chanakya Puri,New Delhi,Delhi-110066
(d)Pin code 110066
(e)E-mail s.patatunda@gail.co.in
(f)STD Code. 0(f)Telephone No. 26180151
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(c) Petro-chemical complexes (industries based on processing of
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/161777/2019
(d)Master Proposal Number(Single Window) SW/161750/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No. 652/ Khatauni No. 20020200062
(b)Pincode 206241
(c)Bounded Latitudes (North)
From
Degree 263739
Minutes
Second
From
Degree 263930
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 792823
Minutes
Second
From
Degree 793016
Minutes
Second
(e)Survey of India Topo Sheet No. 54N6/N10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 143
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/595/2010-IA (II) I
(c)Date of Issue of TOR 13 Sep 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 10 Jul 2020
(c)Date of Issue of EC 16 Oct 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing Exempted vide attached MoEFCC letter Dated 06.03.2020
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/UP/IND-135/342/2012/701
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 12 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Benzene Rich Gasoline32800032800Tons per Annum(TPA)Road
(2.)Mixed Fuel Oil15693015693Tons per Annum(TPA)Road
(3.)High Density Polyethylene (HDPE)2000000200000Tons per Annum(TPA)Road
(4.)LPG2710590271059Tons per Annum(TPA)Road
(5.)Pentane31200031200Tons per Annum(TPA)Road
(6.)Butene30000030000Tons per Annum(TPA)Road
(7.)PFO12000012000Tons per Annum(TPA)Road
(8.)Naphtha31200031200Tons per Annum(TPA)Road
(9.)Polypropylene06000060000Tons per Annum(TPA)Road
(10.)Linear Low Density Polyethylene (LLDPE)6100000610000Tons per Annum(TPA)Road
(11.)Hydrogenated C4 Mix23320023320Tons per Annum(TPA)Road
(12.)Propane23048023048Tons per Annum(TPA)Road
(13.)Propylene63712063712Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)New Butene-120000 TPA020000 TPANo Change
(2.)Linear Low Density Polyethylene (LLDPE)-2400000 TPA0400000 TPANo Change
(3.)High Density Polyethylene (HDPE)-2100000 TPA0100000 TPANo Change
(4.)Ethylene (GCU-2)450000 TPA0450000 TPANo Change
(5.)Linear Low Density Polyethylene (LLDPE)-1210000 TPA0210000 TPANo Change
(6.)Butene-110000 TPA010000 TPANo Change
(7.)Polypropylene060000 TPA60000 TPANew Unit
(8.)High Density Polyethylene (HDPE)-1100000 TPA0100000 TPANo Change
(9.)Ethylene (GCU-1)400000 TPA0400000 TPANo Change
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Nov 2019
(iv)Valid Upto 31 Dec 2021
(v)File No. 63746&63829/UPPCB/Kanpurdehat(UPPCBRO)/CTO/Air/Aur
(vi)Application No. 5759145 & 5772323
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 910.56
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.77
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.88
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 60000
(c)Total quantity of raw material/fuel 60000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Propylene59200Tons per AnnumThrough existing availabilityRoad0 LinkageCopy of Linkage
(2.)Ethylene1300Tons per AnnumThrough existing availabilityRoad0 LinkageCopy of Linkage
(3.)Hydrogen6.25Tons per AnnumThrough existing availabilityRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube857084.7100
(2.)SO2Micro Gram per Meter Cube261525.780
(3.)NOxMicro Gram per Meter Cube352034.380
(4.)PM2.5Micro Gram per Meter Cube493248.360
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total HardnessOthersas CaCO3167154200600
(2.)TSSmg/l131100
(3.)Fluoridemg/l0.870.681.01.5
(4.)Chloridesmg/l48322501000
(5.)TDSmg/l3513205002000
(6.)pHNA7.87.68.58.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.697.55B
(2.)DOmg/l7.57.1B
(3.)CODmg/l255245B
(4.)BODmg/l3025B
(5.)OthersIronmg/l0.180.16B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.130.170
(2.)Leq(Day)A-weighted decibels(dB(A))63.730.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.36.7
(2.)Electric ConductivityOthersmicroS/cm186173
(3.)K(Potassium)Kilogram per hectare381254
(4.)P(Phosphorus)Kilogram per hectare2519
(5.)N(Nitrogen)Kilogram per hectare11680
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.14 To 2.81
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.0 To 0.08
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4171210Copy of Permission LetterPipelineOthersOpen CanalMoU between Gail & Irrigation Department,Etawah02 May 201773392
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Blowdowns,Process units,Sanitary51365136ETPDischarge into Surface Water Body,Reuse within the Plant & Recycling12003936
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5136
(b)Total Discharged Water (Kilolitre per Day) 3936
(c)Total Reused Water (Kilolitre per Day) 1200
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Molecular SievesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25Tons70RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube350035.0180
(2.)PM10Microgram per Meter Cube850085.01100
(3.)PM2.5Microgram per Meter Cube490049.0160
(4.)SO2Microgram per Meter Cube26.00026.0180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)No new stack envisaged000Others00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source State Grid & G.T.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 582.23
    Total Land (ha.) 582.23
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 582.23
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 582.2300
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant390.23Within Existing boundaries
(2.)Green belt192
Total (ha.) 582.23
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Critically Polluted AreaNA0NA
(3.)ESZsNA0NA
(4.)WLSNA0NA
(5.)NPANA0NA
(6.)ESAsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 582.23
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages
(b)No. of Households
(c)No. of PDFs (Project Displaced Families)
(d)No. of PAFs (Project Affected Families)
(e)Funds Allocated for R&R(in INR) (in Lacs)
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sengar River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 1700
(d)Temporary Employment- During Operation 50
(e)No. of working days 6
(f)Total Manpower 1760
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1920192
(2.)Percentage of Total Project Area33033
(3.)Funds Allocated01.501.5
(4.)No. of Plants78000114000192000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal Employment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0041
(ii)Name of the EIA Consultant Engineers India Limited
(iii)Address Head - Environment, Water & Safety (EWS) Division Tower-I, Ground floor, EIL Office Complex, Engineers India Limited, Gurugram (On NH-48), Haryana-122001
(iv)Mobile No. 9818669575
(v)Landline No. 1243802035
(vi)Email Id jk.joshi@eil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 12 Aug 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe have submitted EDS reply. Kindly consider our proposal in next EAC meeting. 07 Sep 2020
2.NA

During deliberations, the EAC noted the following:

 

The EAC during deliberations noted that the documents and information submitted by the project proponent is not adequate to examine the proposal. The Committee after detailed deliberations desired for more comprehensive presentation with all the requisite additional documents for consideration of the proposal. The Committee suggested that the proposal shall be placed in the next meeting of the EAC.

 

The proposal was accordingly DEFERRED for the needful. 

07 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSANJIV BHALLA
DesignationGM
Name of Company (Applicant Name should not be given here)GAIL INDIA LIMITED PATA
AddressGAIL PATA
Print