1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Petrochemical Complex by Adding Polypropylene Unit at Pata, District Auraiya, Uttar Pradesh by M/s Gail (India) Limited | (b)Name of the Company / Organisation | GAIL INDIA LIMITED PATA | (c)Registered Address | GAIL PATA,,Auraiya,Uttar Pradesh-206241 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SANJIV BHALLA | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | GAIL BHAWAN,16 BHIKAIJI CAMA PLACE,NEW DELHI-110066,Chanakya Puri,New Delhi,Delhi-110066 | (d)Pin code | 110066 | (e)E-mail | s.patatunda@gail.co.in | (f)STD Code. | 0(f)Telephone No. | 26180151 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UP/IND2/161777/2019 | (d)Master Proposal Number(Single Window) | SW/161750/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khata No. 652/ Khatauni No. 20020200062 | (b)Pincode | 206241 | (c)Bounded Latitudes (North) | | From | | Degree | 263739 | Minutes | | Second | | From | | Degree | 263930 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 792823 | Minutes | | Second | | From | | Degree | 793016 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 54N6/N10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 143 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/595/2010-IA (II) I | (c)Date of Issue of TOR | 13 Sep 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 10 Jul 2020 | (c)Date of Issue of EC | 16 Oct 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing Exempted vide attached MoEFCC letter Dated 06.03.2020 | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/ENV/UP/IND-135/342/2012/701 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 12 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Benzene Rich Gasoline | 32800 | 0 | 32800 | Tons per Annum(TPA) | | Road | | (2.) | Mixed Fuel Oil | 15693 | 0 | 15693 | Tons per Annum(TPA) | | Road | | (3.) | High Density Polyethylene (HDPE) | 200000 | 0 | 200000 | Tons per Annum(TPA) | | Road | | (4.) | LPG | 271059 | 0 | 271059 | Tons per Annum(TPA) | | Road | | (5.) | Pentane | 31200 | 0 | 31200 | Tons per Annum(TPA) | | Road | | (6.) | Butene | 30000 | 0 | 30000 | Tons per Annum(TPA) | | Road | | (7.) | PFO | 12000 | 0 | 12000 | Tons per Annum(TPA) | | Road | | (8.) | Naphtha | 31200 | 0 | 31200 | Tons per Annum(TPA) | | Road | | (9.) | Polypropylene | 0 | 60000 | 60000 | Tons per Annum(TPA) | | Road | | (10.) | Linear Low Density Polyethylene (LLDPE) | 610000 | 0 | 610000 | Tons per Annum(TPA) | | Road | | (11.) | Hydrogenated C4 Mix | 23320 | 0 | 23320 | Tons per Annum(TPA) | | Road | | (12.) | Propane | 23048 | 0 | 23048 | Tons per Annum(TPA) | | Road | | (13.) | Propylene | 63712 | 0 | 63712 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | New Butene-1 | 20000 TPA | 0 | 20000 TPA | No Change | (2.) | Linear Low Density Polyethylene (LLDPE)-2 | 400000 TPA | 0 | 400000 TPA | No Change | (3.) | High Density Polyethylene (HDPE)-2 | 100000 TPA | 0 | 100000 TPA | No Change | (4.) | Ethylene (GCU-2) | 450000 TPA | 0 | 450000 TPA | No Change | (5.) | Linear Low Density Polyethylene (LLDPE)-1 | 210000 TPA | 0 | 210000 TPA | No Change | (6.) | Butene-1 | 10000 TPA | 0 | 10000 TPA | No Change | (7.) | Polypropylene | 0 | 60000 TPA | 60000 TPA | New Unit | (8.) | High Density Polyethylene (HDPE)-1 | 100000 TPA | 0 | 100000 TPA | No Change | (9.) | Ethylene (GCU-1) | 400000 TPA | 0 | 400000 TPA | No Change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Nov 2019 | (iv)Valid Upto | 31 Dec 2021 | (v)File No. | 63746&63829/UPPCB/Kanpurdehat(UPPCBRO)/CTO/Air/Aur | (vi)Application No. | 5759145 & 5772323 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 910.56 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3.25 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.77 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.88 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 60000 | (c)Total quantity of raw material/fuel | 60000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Propylene | 59200 | Tons per Annum | | Through existing availability | Road | | 0 | Linkage | | Copy of Linkage | (2.) | Ethylene | 1300 | Tons per Annum | | Through existing availability | Road | | 0 | Linkage | | Copy of Linkage | (3.) | Hydrogen | 6.25 | Tons per Annum | | Through existing availability | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2019 To 31 Dec 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 85 | 70 | 84.7 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 26 | 15 | 25.7 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 35 | 20 | 34.3 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 49 | 32 | 48.3 | 60 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | Others | as CaCO3 | 167 | 154 | 200 | 600 | (2.) | TSS | | | mg/l | | 13 | 11 | 0 | 0 | (3.) | Fluoride | | | mg/l | | 0.87 | 0.68 | 1.0 | 1.5 | (4.) | Chlorides | | | mg/l | | 48 | 32 | 250 | 1000 | (5.) | TDS | | | mg/l | | 351 | 320 | 500 | 2000 | (6.) | pH | | | NA | | 7.8 | 7.6 | 8.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.69 | 7.55 | B | (2.) | DO | | mg/l | | 7.5 | 7.1 | B | (3.) | COD | | mg/l | | 255 | 245 | B | (4.) | BOD | | mg/l | | 30 | 25 | B | (5.) | Others | Iron | mg/l | | 0.18 | 0.16 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 46.1 | 30.1 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.7 | 30.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.3 | 6.7 | (2.) | Electric Conductivity | Others | microS/cm | 186 | 173 | (3.) | K(Potassium) | Kilogram per hectare | | 381 | 254 | (4.) | P(Phosphorus) | Kilogram per hectare | | 25 | 19 | (5.) | N(Nitrogen) | Kilogram per hectare | | 116 | 80 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.14 To 2.81 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.0 To 0.08 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 41712 | 10 | Copy of Permission Letter | Pipeline | | Others | Open Canal | MoU between Gail & Irrigation Department,Etawah | 02 May 2017 | 73392 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Blowdowns,Process units,Sanitary | 5136 | 5136 | ETP | Discharge into Surface Water Body,Reuse within the Plant & Recycling | | 1200 | 3936 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5136 | (b)Total Discharged Water (Kilolitre per Day) | 3936 | (c)Total Reused Water (Kilolitre per Day) | 1200 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Molecular Sieves | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 25 | Tons | 70 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 35 | 0 | 0 | 35.01 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 85 | 0 | 0 | 85.01 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 49 | 0 | 0 | 49.01 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 26.0 | 0 | 0 | 26.01 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | No new stack envisaged | 0 | 0 | 0 | Others | 0 | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3000 | (b)Source | State Grid & G.T. | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 582.23 | Total Land (ha.) | 582.23 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 582.23 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 582.2300 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 390.23 | Within Existing boundaries | (2.) | Green belt | | 192 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | NA | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | ESZs | NA | 0 | NA | (4.) | WLS | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 582.23 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sengar River | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 10 | (c)Temporary Employment- During Construction | 1700 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 6 | (f)Total Manpower | 1760 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 192 | 0 | 192 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | Funds Allocated | 0 | 1.50 | 1.5 | (4.) | No. of Plants | 78000 | 114000 | 192000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Local Employment Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0041 | (ii)Name of the EIA Consultant | Engineers India Limited | (iii)Address | Head - Environment, Water & Safety (EWS) Division Tower-I, Ground floor, EIL Office Complex, Engineers India Limited, Gurugram (On NH-48), Haryana-122001 | (iv)Mobile No. | 9818669575 | (v)Landline No. | 1243802035 | (vi)Email Id | jk.joshi@eil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 12 Aug 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We have submitted EDS reply. Kindly consider our proposal in next EAC meeting. | 07 Sep 2020 | 2. | NA |
During deliberations, the EAC noted the following:
The EAC during deliberations noted that the documents and information submitted by the project proponent is not adequate to examine the proposal. The Committee after detailed deliberations desired for more comprehensive presentation with all the requisite additional documents for consideration of the proposal. The Committee suggested that the proposal shall be placed in the next meeting of the EAC.
The proposal was accordingly DEFERRED for the needful. | 07 Sep 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |