|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Inclusion of Forest Land in the Environment and CRZ clearance for development of Multi Cargo Port with supporting utilities and infrastructure facilities at Village Hazira, Taluka Choryasi, District Surat, Gujarat by M/s Adani Hazira Port Private Limited | (b)Name of the Company / Organisation | Adani Hazira Port Pvt. Ltd. | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shalin M Shah | (b)Designation (Owner/ Partner/ CEO) | Head - Environment | (c)Address | 01st Floor, Infrastructure House, Nr. Mithakhali Circle, Navrangpura, Ahmedabad.,,Ahmadabad City,Ahmedabad,Gujarat-380009 | (d)Pin code | 380009 | (e)E-mail | hse@adani.com | (f)STD Code. | 0(f)Telephone No. | 25557362 | (g)Fax No. | 255 5560 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/MIS/428/2010 | (d)Master Proposal Number(Single Window) | SW/161375/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Hazira Village Survey No. 179 ,434, 318, 306/A/1; | (b)Pincode | 394270 | (c)Bounded Latitudes (North) | | From | | Degree | 21.085317 | Minutes | | Second | | From | | Degree | 21.128267 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.638097 | Minutes | | Second | | From | | Degree | 72.642222 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 46-C/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 14 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Surat | Chorasi | Hazira | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 11-150/2010-IA.III | (c)Date of Issue of TOR | 07 Apr 2011 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 11 May 2012 | (c)Date of Issue of EC | 03 May 2013 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The public hearing was conducted on 14.08.2012 for the master plan for Development of Multi Cargo Port at Hazira including forest lands but the EC was granted excluding the forest lands. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No: 6-11/2013(ENV)/1038 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 24 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Cargo Handling Capacity | 84 | 0 | 84 | Others | MMTPA | Road,Rail,Conveyor Belt | | (2.) | Port Area | 496.63 | 301.0199 | 797.6499 | Hectares(ha) | | Road,Rail,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Cargo Handling Capacity | 84 MMTPA | 0 MMTPA | 84 MMTPA | No increase in cargo handling capacity after expansion | (2.) | Port Area | 496.63 Ha | 301.0199 Ha | 797.6499 Ha | | (3.) | Reclamation - North Side | 225.30 ha | 0 | 225.30 ha | No increase in the reclamation on the north side after expansion | (4.) | Reclamation - South Side | 84 ha | 0 | 84 ha | No increase in the reclamation on the south side after expansion | (5.) | Berths | 12 Nos | 0 Nos | 12 | No increase in the number of berths after expansion | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Jul 2017 | (iv)Valid Upto | 12 Jul 2022 | (v)File No. | GPCB/CCA-SRT-1314(8)/ID-35352/528583 | (vi)Application No. | AW-104319 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1800 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 20.26 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.20 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 8.5 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 8.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | STONES | 4.5 | Others | MMT | Chikli | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Sand | 1.5 | Others | MMT | Dredging / Rajpardi | Road | | 110 | Open Market | | Copy of Linkage | (3.) | Soil/Gravel | 2.5 | Others | MMT | Chikli | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 20 Dec 2018 To 07 Mar 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.5 | 69.3 | 94.98 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 45.8 | 22.7 | 45.38 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 20.9 | 8.3 | 20.65 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 25.8 | 12.1 | 25.53 | 80 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | pH | | | NA | | 7.85 | 7.30 | 6.5 | 8.5 | (3.) | TDS | | | mg/l | | 670 | 480 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 240.04 | 210.12 | 200 | 600 | (5.) | Fluoride | | | mg/l | | 1.4 | 0.62 | 1 | 1.5 | (6.) | Heavy Metals | | Iron | mg/l | | 0.3 | 0.25 | 0.3 | 0.3 | (7.) | Chlorides | | | mg/l | | 44.15 | 32.4 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 0 | 0 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | COD | | mg/l | | 0 | 0 | A | (4.) | pH | | NA | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.80 | 47.38 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.13 | 63.10 | 75 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.15 | 7.8 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 23.21 | 14.28 | (3.) | K(Potassium) | Milligram per Kilogram | | 183.03 | 125 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 104.91 | 71.42 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.54 | 0.32 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.48 To 17.75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.39 To 16.55 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Open Market | 40 | 15 | Copy of Permission Letter | modeOthers | Tankers | Others | No Withdrawal | Agreement | 01 Apr 2020 | 40 | (2.) | Others | Treated Wastewater from KRIBHCO | 2000 | 18.1 | Copy of Permission Letter | Pipeline | | Others | No Withdrawal | Memrandum of Understanding | 13 Jun 2014 | 2000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage | 60.22 | 75 | Primary (Grit Chamber and equalization), Secondary (MBBR), Tertiary (Sand and Carbon Filter Treatment and Sodium hypochlorite dosing) | Green Belt Renewal Plant | | 60.22 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 60.22 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 60.22 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Construction & Demolition Waste | Construction & Demolition Waste | | 0 | Tons | 0 | Road | | Authorized Recyclers | | (2.) | Biodegradable Waste | Others | Biodegradable Waste | 10.31 | Tons | 0 | Others | Organic Waste Converter | Others | Manure for Greenbelt | (3.) | Non-Biodegradable Waste | Municipal Solid Waste | | 143.07 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 19.95 | 0 | 0.59 | 20.55 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 82.63 | 0 | 1.41 | 84.04 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 33.74 | 0 | 0.29 | 34.04 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 14.50 | 0 | 0.10 | 14.61 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | Gujarat Electricity Board | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 8 DG Sets: 3 Nos of 1500 KVA, One 325 KVA, One 100 | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 301.0199 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 301.0199 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1357 | (b)Waste/Barren Land (ha.) | 10488 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2280 | (e)Settlements (ha.) | 3777.6 | (f)Industrial (ha.) | 2518.4 | (g)Forest (ha.) | 491.02 | (h)Mangroves (ha.) | 1234 | (i)Marine Area (ha.) | 25021.23 | (j)Others (ha.) : None | 0 | Total (ha.) | 47167.2500 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 13.114 | | (2.) | Main Plant | | 282.906 | Cargo Storage Area and Associated Infrastructures | (3.) | Others | Parking Area | 5.0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NIL | 0 | None | (2.) | ESAs | Hazira Mangroves | 7.0 | No mangroves will be disturbed | (3.) | Wildlife Corridors | NIL | 0 | None | (4.) | Critically Polluted Area | NIL | 0 | None | (5.) | Corridors | NIL | 0 | None | (6.) | WLS | NIL | 0 | None | (7.) | NPA | NIL | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NIL | 0 | None | (2.) | Defence Installations | | NIL | 0 | None | (3.) | Forest | | Reserve Forest | 0 | Two forest land parcels of 210.1594 ha and 90.8605 ha amounting to a total area of 301.0199 Ha is proposed for diversion | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | | (b)No. of Households | | (c)No. of PDFs (Project Displaced Families) | | (d)No. of PAFs (Project Affected Families) | | (e)Funds Allocated for R&R(in INR) (in Lacs) | | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | INR 750000 | (iii)Period of Implementation | 5 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Hazira Village Pond | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 400 | (d)Temporary Employment- During Operation | 600 | (e)No. of working days | 330 | (f)Total Manpower | 1200 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 69 | 13.11 | 82.11 | (2.) | Percentage of Total Project Area | 13.89 | 4.36 | 18.25 | (3.) | No. of Plants | 103500 | 19671 | 123171 | (4.) | Funds Allocated | 14100000 | 2100000 | 16200000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IB | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | No Mangroves Land is Involved | (d)Area of Mangroves Land (hectare) | 0 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | One season terrestrial EIA study was conducted | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 20 Dec 2018 | (iv)Period of Study To (EIA Terrestrial) | 07 Mar 2019 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | One season marine EIA study was carried out | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 20 Dec 2018 | (iv)Period of Study to (EIA Marine) | 07 Mar 2019 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | The AHPPL already has a Disaster Management Plan a | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | Institute of Remote Sensing, Anna University, Chen | (ii)Please Specify with salient features | Ports & Harbours | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IB | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 0 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 512 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | Comply to letter no. ENV-10-2012-31-E dt 11.05.12 | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | The proposed forest land for diversion is not inha | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 20 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 45 | (d)Total plot area (sqm) | 90000 | (e)Total built up area (sqm) | 36000 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 2 Wheeler Parking will be 300 nos. and 4 Wheelers | |
|
5. | Energy Saving Measures: | (a)Source/Mode | 39.5 MW of Solar Power & Wind Power, and CFL | (b)Percentage | 5 | (c)Quantity | 39.5 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | The applicant shall install & operate comprehensive adequate air pollution control system in order to achieve prescribed norms | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0170 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited | (iii)Address | Parry House 3rd Floor, No.2 N.S.C. Bose Road, Chennai – 600 001, Tamilnadu | (iv)Mobile No. | 9940047988 | (v)Landline No. | 0443044562 | (vi)Email Id | inquiry@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 23 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. unable open your ToR letter in Form2 application, please upload again in form2 application
2.Unable to open EC letter Please upload again in Form2 application
3.Unable to open public hearing support documents
3.Whether application was submitted under expansion proposal, copy of Tor issued for expansion including the proposed Forest land and its condition wise ToR compliance | 04 Aug 2020 | 2. | NA | The correction have been made as per the instruction received | 05 Aug 2020 | 3. | NA | unable open your ToR letter in Form2 application, please upload again in form2 application 2.Unable to open EC letter Please upload again in Form2 application 3.Unable to open public hearing support documents | 10 Aug 2020 | 4. | NA | The correction have been made as per the instruction received | 13 Aug 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shalin M Shah | Designation | Head - Environment | Name of Company (Applicant Name should not be given here) | Adani Hazira Port Pvt. Ltd. | Address | 1st Floor, Infrastructure House, Adjacent to Adani House, Near Mithakhali Circle, Navrangpura, Ahmad |
|