1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Rongnichu HEP | (b)Name of the Company / Organisation | MADHYA BHARAT POWER CORPORATION LIMITED | (c)Registered Address | E-585, Ground Floor, Greater Kailash - II,,New Delhi,Delhi-110048 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | PS DUTTA GUPTA | (b)Designation (Owner/ Partner/ CEO) | DIRECTOR | (c)Address | 1ST FLOOR VANIJYA BHAWAN DEVENDRA SQUARE JAIL ROAD,,Raipur,Raipur,Chhattisgarh-492001 | (d)Pin code | 492001 | (e)E-mail | pduttagupta@mbpcl.co.in | (f)STD Code. | 771(f)Telephone No. | 2214210 | (g)Fax No. | 2214213 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(c) River Valley projects
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/SK/RIV/159493/2019 | (d)Master Proposal Number(Single Window) | SW/159477/2020 | (e)EAC concerned (for category A Projects only) | River Valley and Hydroelectric Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 387, 717,392, 6,20,9, 557, 743, 2261P, 359/P, 127| | (b)Pincode | 737135 | (c)Bounded Latitudes (North) | | From | | Degree | 27.182778 | Minutes | | Second | | From | | Degree | 27.274167 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 88.540833 | Minutes | | Second | | From | | Degree | 88.593889 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 78A11 AND 78A12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 742 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 742 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Sikkim | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-12011/14/2019-IA I (R) | (b)Date of Apply of TOR | 10 Aug 2019 | (c)Date of Issue of TOR / Standard ToR | 16 Jan 2020 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public hearing of Rongnichu HEP (96MW) was conduct | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | barrage and surface powerhouse | 115 | Hydro Electric Power Project (115 MW) | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Hydro power | 115 | Mega Watt(MW) | | Others | HT Transmission Line | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1061.21 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1061.21 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.31 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.55 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 50000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 50000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Stone | 1186000 | Others | cum | local | Road | | 0 | Linkage | | Copy of Linkage | (2.) | POL | 50000 | Others | LITRE | local | Road | | 0 | Linkage | | Copy of Linkage | (3.) | Sand | 175000 | Others | cum | local | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 May 2019 To 31 Dec 2019 | (b)Season | Three-Sesions | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 61 | 22 | 54 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.5 | 4.5 | 9.40 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 61 | 22 | 54 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 15.7 | 6.5 | 15.30 | 80 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 1.8 | 1.0 | 2 | 2 | (2.) | Fluoride | | | mg/l | | 0.12 | 0.09 | 1 | 1.5 | (3.) | TDS | | | mg/l | | 135 | 124 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 52 | 46 | 200 | 600 | (5.) | pH | | | NA | | 7.41 | 7.32 | 6.5 | 8.5 | (6.) | Chlorides | | | mg/l | | 26 | 21.2 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.42 | 6.88 | C | (2.) | BOD | | mg/l | | 3.6 | 2.4 | C | (3.) | COD | | mg/l | | 14 | 8 | C | (4.) | DO | | mg/l | | 9.5 | 7.1 | C | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.3 | 46.9 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.9 | 36 | 45 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 13.55 | 9.4 | (2.) | pH | | | 6.84 | 5.32 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 235.4 | 163.8 | (4.) | N(Nitrogen) | Kilogram per hectare | | 315.6 | 275.4 | (5.) | K(Potassium) | Kilogram per hectare | | 178.5 | 156.5 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 115 | 3 | Not Appliacble | Pipeline | | Barrage | | NA | 01 Jan 2020 | 115 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic wastewater by 430 persons | 24 | 40 | STP | Others | disposal at designated site | 0 | 24 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 24 | (b)Total Discharged Water (Kilolitre per Day) | 24 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | municipal solid waste | Municipal Solid Waste | | 185 | Tons | 3 | Others | By Dumpers | Others | Disposal at Landfill site | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 55 | 0 | 9.30 | 64.40 | 100 | (2.) | PM2.5 | | NA | 0 | 0 | 0 | 0.1 | 0 | (3.) | SO2 | | NA | 0 | 0 | 0 | 0.1 | 0 | (4.) | NOx | | NA | 0 | 0 | 0 | 0.1 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2 | (b)Source | NEAREST SUB STATION, TRANSFORMER | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2X500 KVA | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 48.4825 | (b)Private Land (ha.) | 11.3895 | (c)Government Land (ha.) | 0.00 | (d)Revenue Land (ha.) | 0.00 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 59.872 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 10629 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1248 | (e)Settlements (ha.) | 2054 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 38458 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 52389.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Submergence dam seat appurtenant works | 59.872 | Agriculture 11.3895 ha, Forest 48.4825 ha | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | NA | (2.) | WLS | None | 3.9 | No part of the project falls within the ESZ of WLS as per map authenticated by the Chief Wildlife Warden and Environment, Sikkim | (3.) | Critically Polluted Area | None | 0 | NA | (4.) | Wildlife Corridors | None | 0 | NA | (5.) | Corridors | None | 0 | NA | (6.) | ESAs | None | 0 | NA | (7.) | ESZs | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Singtam Range | 4 | Reserved Forest, Singtam Range 1 to 4km | (2.) | Archaeological Sites | | None | 0 | NA | (3.) | Others | Reserved Forest | Tarpin Range | 2 | Reserved Forest, Tarpin Range 1 to 2km | (4.) | Defence Installations | | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 11 | (b)Land yet to be acquired(Ha) | 0.00 | (c)Status of Land acquisition if not acquired | Permanent acquisition of private land 11.3859 ha l | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 5 | (b)No. of Households | 2869 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 62 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 284 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Red Panda and Clouded Leopard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 101.1 lakh | (iii)Period of Implementation | NA | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Rongnichu and its tributaries | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | 38.16 cumec from intake | (ii)Details of Study Conducted | Water Availability Studies carried out | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rongnichu and its tributaries | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 1100 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 5 | (b)Percentage of Total Project Area | 8.35 | (c)No. of Plants to be Planted | 8000 | (d)Funds Allocated for Plantation | 15 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | implementation of CAT, Compensatory Afforestation, Green belt Development | (2.) | Financial | Benefits to economy and commerce | (3.) | Social | Employment Potential | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For River Valley and Hydroelectric Projects |
|
1. | Project Sub Sector | Hydroelectric Project | 2. | Name of the River | Rongnichu | 3. | Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? | No |
|
|
4. Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme) |
---|
S. No. | Project Type | Dam Height (in meters) | Dam Length (in meters) | Total Submergence Area (in hectare) | Gross Command Area (GCA) (in hectare) | Irrigable Command Area (ICA) (in hectare) | Culturable Command Area (CCA) (in hectare) | Total Command Area (in hectare) |
---|
(1.) | Barrage | 14 | 120 | 10.70 | 0 | 0 | 0 | 0 | |
5. | Powerhouse Installed Capacity | No | (a) Type of Powerhouse | Surface | (b) Capacity (in megawatts) | 115 | (c) No. of Tunnels | 1 | (d) No. of Units | 2 | (e) Bank of River | Left |
|
|
6. | Generation of Electricity Annually. | (a) Quantity of Generation of Electricity Annually (in giga watt hours) | 413.78 | (b) Water Availability at Various percentage | S. No. | Percentage | Water availability (in cusecs) | Dependable year | Remarks |
---|
(1.) | 50 % | 600.56 | 1979 | 1979-80 | (2.) | 90 % | 488.20 | 1996 | 1996-97 | (3.) | 75 % | 548.47 | 2006 | 2006-07 | | (c) Machine Availability (in percent) | 95 | (d) Cost of Electricity Generation (in INR) | 3.91 | (e) Internal Rate of Return (in percent) | 10.08 | (f) Year of achievement of Internal Rate of Return | 10 |
| 7. | Catchment Area Treatment Plan | Copy of Catchment Plan | 8. | Muck Management Plan | (a)Muck Management Plan | Copy of Muck Management Plan | (b) Total Excavation Muck (in cubic meter) | 516000 | (c) Utilized for Construction (in cubic meter) | 190000 | (d) No. of Muck Disposal sites | 10 | (e) Total Muck Disposal Area (in hectare) | 9.5299 |
| 9. | Fishery Development and Management Plan | (a)Fishery Development and Management Plan | Copy of Fishery Development and Management Plan | (b) No. of Fish Species | 2 | (c) Name of the umbrella Fish Species (Scientific Name) | Acrossocheilus hexagonolepis (Catli) and Schizotho |
| 10. | Status of Environmental Flow | S. No. | Season | Average Inflow (in cumec) | Percent of Flow |
---|
(1.) | Non-Lean Non-Monsoon | 15.9 | 2.39 | (2.) | Lean | 4.76 | 0.71 | (3.) | Monsoon | 28.95 | 4.31 | |
| 11. | Free Flow Stretch (in km) | 0 | 12. | Approval of Central Water Commission | Yes | (a)Approval Reference No. | 91/GOS/E&P/2004-05/PART-IV/20 | (a)Date of Approval | 15 Jun 2020 | (a)Copy of Approval | Copy of approval |
| 13. | Approval of Central Electricity Authority | Yes | (a)Approval Reference No. | 91/GOS/E&P/2004-05/PART-IV/20 | (a)Date of Approval | 15 Jun 2020 | (a)Copy of Approval | Copy of approval |
| 14. | Details of Coffer Dam (Upstream) | Yes | (a) Quantity of the material (in cubic meter). | 0 | (b) Length of the dam (in meter) | 0 | (c) Decommissioning Plan | Copy of Decommissioning Plan |
| 15. | Details of Coffer Dam (Downstream) | Yes | (a) Quantity of the material (in cubic meter). | 0 | (b) Length of the dam (in meter) | 0 | (c) Decommissioning Plan | Copy of Decommissioning Plan |
| |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/SA 225 AC meeting, dt.11.5.2018 | (ii)Name of the EIA Consultant | EQMS India Private Limited | (iii)Address | 304-305, 3rd floor, Rishabh Corporate Tower, Community Center, Karkardooma, Delhi-110092 | (iv)Mobile No. | 9650002530 | (v)Landline No. | 0114306275 | (vi)Email Id | eqms@eqmsindia.org | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | River Valley and Hydroelectric Projects | (ix)Validity of Accreditation | 31 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS REPLY SUBMITTED WITH ANNEXURES | 22 Dec 2020 | 2. | NA | Deferred | 07 Aug 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | PS DUTTA GUPTA | Designation | DIRECTOR | Name of Company (Applicant Name should not be given here) | MADHYA BHARAT POWER CORPORATION LIMITED | Address | E-585, Ground Floor, Greater Kailash - II |
|