1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development of Vadodara Mumbai Expressway (Phase-II) from km.26.320 to km.104.700 (km.390.864 of NH-8) of Main Expressway in the State of Maharashtra | (b)Name of the Company / Organisation | National Highways Authority of India | (c)Registered Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Biswajit Mukhopadhyay | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075 | (d)Pin code | 110075 | (e)E-mail | biswajit@nhai.org | (f)STD Code. | 11(f)Telephone No. | 25074200 | (g)Fax No. | 25093543 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(f) Highways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/MIS/156726/2020 | (d)Master Proposal Number(Single Window) | SW/156718/2020 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | List attached in additional details | (b)Pincode | 401404 | (c)Bounded Latitudes (North) | | From | | Degree | 19.484741 | Minutes | | Second | | From | | Degree | 20.156165 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.850189 | Minutes | | Second | | From | | Degree | 72.924489 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 46D16, 47A13, 47A14, 47A15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 113 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | No | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 11 Feb 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.9 |
| Gram Panchayat Office, Dahisar Turfe Manor village | State : | Maharashtra | District : | Palghar | Tehsil : | Palghar | Village : | Dahisar Turfe Manor |
| 204 | Land acquisition and environmental impacts | Others | Addl. District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | N/A | N/A | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 78.118 | 78.11 | Kilometers | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7010 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 66.42 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 35.05 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 40000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 40000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 40000 | Others | KL | Local Petrol Pump | Road | | 20 | Open Market | | Copy of Linkage | (2.) | Aggregate | 3072000 | Others | Cum | Approved Quarry | Road | | 3.3 | Open Market | | Copy of Linkage | (3.) | Bituminous Concrete | 4138 | Others | Cum | Local Traders | Road | | 20 | Open Market | | Copy of Linkage | (4.) | Steel | 78641 | Others | MT | Local Traders | Road | | 20 | Open Market | | Copy of Linkage | (5.) | Bitumen | 1004 | Others | MT | Refinery | Road | | 100 | Open Market | | Copy of Linkage | (6.) | Cement | 807000 | Others | MT | Local Traders | Road | | 20 | Open Market | | Copy of Linkage | (7.) | Coarse Sand | 2050000 | Others | Cum | Approved Quarry | Road | | 0.5 | Others | No linkage | Copy of Linkage | (8.) | Fly Ash | 10932287 | Others | Cum | GIPCL, Surat | Others | Covered dumper | 212 | Others | No linkage | Copy of Linkage | (9.) | Emulsion | 130 | Others | MT | Refinery | Road | | 100 | Open Market | | Copy of Linkage | (10.) | Water | 8571 | Kilo Litre per Day | | Tanker/Ground & Surface water | Others | Tanker | 15 | Others | No linkage | Copy of Linkage | (11.) | Borrow Earth | 7253703 | Others | Cum | Approved Borrow Area | Road | | 2.0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 06 Mar 2017 To 30 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 23.8 | 14.7 | 22.8 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.8 | 5.9 | 9.8 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 25.6 | 14.8 | 23.8 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 0.32 | 0.19 | 0.3 | 4 | (5.) | PM10 | | Micro Gram per Meter Cube | 62.9 | 42.6 | 60.1 | 100 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | N/A | 7.9 | 6.87 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 192.34 | 151.5 | 200 | 600 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Chlorides | | | mg/l | | 106.39 | 91.46 | 250 | 1000 | (5.) | Others | Calcium as Ca | | mg/l | | 57.18 | 33.13 | 75 | 200 | (6.) | Fluoride | | | mg/l | | 0.62 | 0.21 | 1 | 1.5 | (7.) | TDS | | | mg/l | | 422 | 346 | 500 | 2000 | (8.) | Heavy Metals | | Lead (as Pb) | mg/l | | 0.0 | 0.0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.4 | 6.1 | C | (2.) | BOD | | mg/l | | 8.4 | 2.32 | C | (3.) | pH | | Others | N/A | 7.85 | 7.24 | C | (4.) | COD | | mg/l | | 110.9 | 7.84 | C | (5.) | Others | Total Coliform | Others | MPN/100 ml | 27 | 2 | C | (6.) | Others | Fluoride as F | mg/l | | 0.74 | 0.56 | C | (7.) | Others | Iron as Fe | mg/l | | 0.49 | 0.33 | C | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.5 | 39.7 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.7 | 36.4 | 45 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.0 | 7.5 | (2.) | P(Phosphorus) | Kilogram per hectare | | 18.76 | 0.34 | (3.) | N(Nitrogen) | Kilogram per hectare | | 409.76 | 103.48 | (4.) | K(Potassium) | Kilogram per hectare | | 508.05 | 260 | (5.) | Electric Conductivity | Others | Mhos/cm | 2950 | 290 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1000 | 0.0 | Not Appliacble | modeOthers | Tanker | Intake Well | | NA | 09 Jun 2020 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | - | Others | NA | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Municipal Solid Waste | | 27 | Tons | 2.0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | CO | Microgram per Meter Cube | 320 | 0.01 | 64 | 385 | 4000 | (2.) | PM2.5 | | Microgram per Meter Cube | 22.82 | 0 | 0 | 22.83 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 60.17 | 0 | 0 | 60.18 | 100 | (4.) | NOx | | Microgram per Meter Cube | 23.81 | 0 | 0 | 23.82 | 80 | (5.) | SO2 | | Microgram per Meter Cube | 9.8 | 0 | 0 | 9.9 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | N/A | N/A | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | Maharashtra State Electricity Distribution Co. Ltd | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 750 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 193.1777 | (b)Private Land (ha.) | 708.7364 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 901.9141 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1461.1861 | (b)Waste/Barren Land (ha.) | 19.2519 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 110.7939 | (e)Settlements (ha.) | 176.5207 | (f)Industrial (ha.) | 33.4404 | (g)Forest (ha.) | 1083.2379 | (h)Mangroves (ha.) | 25.835 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Marshy Land, Salt Pan, Mudflats | 117.0591 | Total (ha.) | 3027.3250 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Highway Development | 901.9141 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | None within 10 km | (2.) | WLS | Tungareshwar Wildlife Sanctuary | 1.28 | Does not pass through the Wildlife Sanctuary | (3.) | NPA | NA | 0 | None within 10 km | (4.) | Wildlife Corridors | NA | 0 | None within 10 km | (5.) | ESZs | Tungareshwar Wildlife Sanctuary | 0.46 | Outside ESZ boundary | (6.) | Corridors | NA | 0 | None within 10 km | (7.) | ESAs | Dahanu Taluka Ecologically Sensitive Area | 0.0 | 27.745 km stretch passing through Dahanu Taluka ESA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserved, Protected, Mangrove & Private Forest | 0.0 | Alignment passing through forest area | (2.) | Archaeological Sites | | None | 0 | No Archaeological sites within 10 km | (3.) | Defence Installations | | None | 0 | No Defence Installations within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Under Process(Stage-II) | (b)Legal Status of Forest Land | Protected | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 640.60 | (b)Land yet to be acquired(Ha) | 261.31 | (c)Status of Land acquisition if not acquired | Acquisition of remaining land under progress | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 51 | (b)No. of Households | 3110 | (c)No. of PDFs (Project Displaced Families) | 359 | (d)No. of PAFs (Project Affected Families) | 3110 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 159400000 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Refer Section 3.14.7 of Chapter-3 and Section 9.4 of Chapter-9 of EIA report | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1200000 | (iii)Period of Implementation | Pre-Construction & Construction phase | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Vaitarna River, Surya River, Jogani River, Vadvali River, Pond | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 200 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 450 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 700 | (f)Total Manpower | 800 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 234 | (b)Percentage of Total Project Area | 25.94 | (c)No. of Plants to be Planted | 90899 | (d)Funds Allocated for Plantation | 231206000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | III | (b)Location Type | Low and Medium Eroding Coast | (c)Details of Mangroves Land Involved, if Any | Diversion of Mangrove Forest involved | (d)Area of Mangroves Land (hectare) | 3.9500 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | Please refer Section 3.14 of Chapter-3 of EIA Repo | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 04 Oct 2017 | (iv)Period of Study To (EIA Terrestrial) | 30 Oct 2017 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | NA | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 31 Dec 1899 | (iv)Period of Study to (EIA Marine) | 31 Dec 1899 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | Not Applicable | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Coastal Roads/Roads on Stilt | (i)Agency Name for Preparing CRZ Maps | NCESS | (ii)Area of Land Reclamation | 0 | (iii)Estimated Quantity of Muck/Earth for Reclamation | 0 | (iv)Carrying Capacity of Traffic | 1300 | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | III | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 0 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 0 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | Stated | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | Please refer Chapter-4 of EIA Report | |
|
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 4 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | NA | |
|
5. | Energy Saving Measures: | (a)Source/Mode | N/A | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 78.118 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 37 | (b)Total No. of ROB | 0 | (c)Total No. of Interchanges | 2 | (d)Total No. of Flyovers | 4 | (e)Total No. of Vehicle Underpass | 33 | (f)Total No. of Pedestrian Underpass | 50 | (g)Details of other utilities rail and road corridors | NA | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Bombay | (d)Case No. | WP 13561 & 13544 / 2018 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | The hearing is in progress. Last date of hearing 1 | (f)Case Details | Filed by the project affected persons regarding la | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0089 | (ii)Name of the EIA Consultant | Intercontinental Consultants and Technocrats Pvt L | (iii)Address | A-8 Green Park, New Delhi - 16 | (iv)Mobile No. | 9811820828 | (v)Landline No. | 40863000 | (vi)Email Id | aseem@ictonline.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 02 Sep 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please upload the ToR | 15 Jul 2020 | 2. | NA | The correction have been made as per the instruction received | 15 Jul 2020 | 3. | NA | Provide following documents/information/clarifications:
(i) Copy of documents in support of the competence/authority is outdated that was submitted in response of EDS dated 11.08.2018. Submit the latest document.
(ii) Please clarify that why the TOR is not mandatory for submission of this application as mentioned in column 6 of Form-2 of this application.
(iii) Baseline data was collected between March 2017 and May 2017, i.e., more than 3 years old. EIA/EMP report to be revised for incorporating fresh baseline data.
(iv) Traffic baseline data is more than 4 years old (data collection between 24 Feb - 7 March 2016) and Traffic survey locations map was prepared in year 2016. EIA/EMP report to be revised for incorporating fresh baseline data and maps related to traffic studies.
(v) It is mentioned that period of marine study was done on 3-4 April, 2017, however, no report has been uploaded. Instead in the relevant column, it is mentioned as Not Applicable. Please furnish clarification for contradictory statement.
(vi) Copy of recommendation letter from MCZMA is not submitted. Please upload the same.
(vii) As per minutes of MCZMA meeting, the length of the proposed alignment is 78.118, however, as per this EC+CRZ application length is 78.380. Please clarify in this regard.
(viii) CRZ Maps as desired in Column 35.3 of Form-2 application are not uploaded.
(ix) Copy of court order is not uploaded properly. | 16 Jul 2020 | 4. | NA | The correction have been made as per the instruction received | 16 Jul 2020 | 5. | NA | EDS reply to be mentioned in Form2 application only and not as additional document | 16 Jul 2020 | 6. | NA | The correction have been made as per the instruction received | 16 Jul 2020 | 7. | NA | CRZ maps not displaying | 16 Jul 2020 | 8. | NA | The correction have been made as per the instruction received | 17 Jul 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Recommendation if Maharashtra Coastal Zone Management Authority is enclosed | 07 Sep 2020 | 2. | NA |
The EAC, after examining the documents submitted by proponent and noted that the proponent does not have the approval of the State Coastal Zone Management Authority and therefore 2020, deferred the proposal for further consideration.
|
| 04 Sep 2020 | 3. | ADS Reply Letter | It is expected that letter of recommendation shall be issued by the MCZMA in few days. | 14 Aug 2020 | 4. | NA |
It was committed by the project proponent that letter of recommendations by the Maharashtra Coastal Zone Management Authority for this project will be submitted before finalisation of the Minutes. However, proponent could not submit the recommendation letter.
In view of this, The EAC, after detailed deliberation during 239th meeting on 29th July, 2020, deferred the proposal for want of recommendation letter by Maharashtra Coastal Zone Management in respect of this project.
|
| 08 Aug 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Biswajit Mukhopadhyay | Designation | General Manager | Name of Company (Applicant Name should not be given here) | National Highways Authority of India | Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075 |
|