EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/HR/IND2/35108/2014
ii. MoEFCC File No. :
J-11011/315/2014-IA II (I)
iii.Short narrative of the project:
EC for proposed greenfield chlor alkali plant and captive power plant
iv. Project Sector :
Industrial Projects-2
v. Company/Proponent :
Mr. Pravind Kumar Garg
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Haryana
Ambala
Ambala
vii.Date of TOR Granted
23 Feb 2015
viii.TOR letter issued by Ministry:
Annexure-TOR letter
ix.Date of Submission for EC:
22 Feb 2016
x.Project Type:
New
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
28 Aug 2015
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
NIL
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
Committee sought following additional information: 1. Viability of project w.r.t. environmental angle. 2. To assess the impact on groundwater due its excessive extraction, a groundwater modeling study to be conducted by reputed institution covering long term impact to groundwater and base flow of the river. Measures to be taken for sustainability of groundwater. 3. Commitment to use of biomass/rice husk in boiler in place of coal 4. Risk analysis and managment in handling of toxic material including Cl2 The proposal was deferred till the desired information is submitted on Ministry's Website.
23 May 2016
2.
ADS Letter
NA
15 Jun 2016
3.
NA
One of the major querries, is to assess the impact on groundwater due its excessive extraction, a groundwater modeling study to be conducted by reputed institution covering long term impact to groundwater and base flow of the river. Measures to be taken for sustainability of groundwater. It is not appropraite to say comepetant authority in the matter is ground water board. The committee suggessted to conduct the study by indepeent agencies which has not been followed. Therefore, porposal should be reconsidered on basis of the report on quanititative analysis.
05 Aug 2016
4.
ADS Letter
NA
07 Sep 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
NABET/EIA/1316/SA2001
iii. Name of Consultant:
Kadam Environmental Consultants
iv. Address :
871/B/3, GIDC Makarpura, Vadodara, India
v. Mobile No.:
9714861611
vi. Landline No.:
02653001000
vii. Email Id:
pragungarg@gmail.com
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Mr. Pravind Kumar Garg
ii. Designation :
Managing Director
iii. Name of Company(Applicant Name should not be given here) :
Mr. Pravind Kumar Garg
iv. Address :
Shree Ganesh Fats (P) Ltd. Village: Buranwala, Barotiwala, Distt. Solan Himachal Pradesh India.
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print