Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EXPANSION AND CHANGE IN PRODUCT MIX
(b)Name of the Company / Organisation SANSKAR CHEMICALS AND DRUGS PRIVATE LIMITED
(c)Registered Address S.F. No. 457/3A, 457/3C, 457/4A, 457/4C, 457/4C (Part), Ammoor village,,12/5 (part), Chettithangal Village, Wallajah Taluk,Vellore,Tamil Nadu-632403
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dinesh Kumar R
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address S.F. No. 457/3A, 457/3c, 457/4A, 457/4C, 457/4C part, Ammoor Village,12/5 part, Chettithangal village, wallajah Taluk,Wallajah,Vellore,Tamil Nadu-632403
(d)Pin code 632403
(e)E-mail karthik@sanskarchemicals.com
(f)STD Code. 44(f)Telephone No. 00000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/IND2/155475/2018
(d)Master Proposal Number(Single Window) SW/155468/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S.F. No. 457/3A, 457/3C, 457/4A, 457/4C, 457/4C (P
(b)Pincode 632403
(c)Bounded Latitudes (North)
From
Degree 12.963459
Minutes
Second
From
Degree 12.964466
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.342512
Minutes
Second
From
Degree 79.342714
Minutes
Second
(e)Survey of India Topo Sheet No. 57 O/8 and 57 P/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 180
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.06
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/361/2018-IA-II(I)
(b)Date of Apply of TOR 15 Nov 2018
(c)Date of Issue of TOR / Standard ToR 18 Dec 2018
(d)Date of Apply of EC 01 Jan 2006
(e)Date of Issue of EC 02 Jan 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :1.5
TSR Mahal
State :Tamil Nadu
District :Vellore
Tehsil :Wallajah
Village :Ammoor
132Issue related to Air, water pollution and improper activities industries in Ranipet area. the proponent will allot 16 Lakhs as a budget for PH issueOthersDistrict Revenue Officer
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. Nil
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 26 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Basic Chromium Sulphate90-900OthersMT/MonthRoad
(2.)Sitagliptin011OthersMT/MonthRoad
(3.)IsoPropyl Bromide01010OthersMT/monthRoad
(4.)Linagliptin00.150.15OthersMT/MonthRoad
(5.)Vildagliptin01.51.5OthersMT/MonthRoad
(6.)Trityl olmesartan medoximal022OthersMT/MonthRoad
(7.)Ploy Allamine hydrochloride20020OthersMT/MonthRoad
(8.)Spent Caustic Lye Solution10-100OthersMT/MonthRoad
(9.)Allyl Isopropyl acetyl urea055OthersMT/MonthRoad
(10.)Diacerine00.20.2OthersMT/MonthRoad
(11.)Allylbromide066OthersMT/MonthRoad
(12.)Spent Sulphuric acid By products81081OthersMT/MonthRoad
(13.)Gypsum(by product)60-600OthersMT/MonthRoad
(14.)Hydrogen Bromide02525OthersMT/MonthRoad
(15.)Isopropanol Hydrochloride40040OthersMT/MonthRoad
(16.)Non Ferric Alum90-900OthersMT/MonthRoad
(17.)Lexoprofen022OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)GL reactor0113 KL
(2.)Cooling Tower2 no02 No3.1 KLD
(3.)DG set100 kVA200 kVA200 kVA100 kVA will be replaced after expansion
(4.)SS reactor6 Nos3 Nos9 Nos3.2 KL, 1.2 KL, 2KL, 2 KL, 6KL, 2 KL, 3.2 KL, 3.5 KL, 5 KL
(5.)SS dryer (48 trays)-48 trays48 trays-
(6.)SS dryer (96 trays)-96 trays96 trays-
(7.)Boiler0.7 TPH-0.7 TPH-
(8.)Chilling plant1 No1 No2 Nos39 TR
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Jul 2020
(iv)Valid Upto 31 Mar 2021
(v)File No. 2008132858125
(vi)Application No. F.0190VLR/RS/DEE/TNPCB/VLR/W/2020
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.61
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.085
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.161
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 70
(c)Total quantity of raw material/fuel 70
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)68 Product raw material16.29Tons per AnnumLocalRoad850 Open MarketCopy of Linkage
(2.)HSD0.5OthersKL/monthLocalRoad6 Open MarketCopy of Linkage
(3.)Fire wood0.75OthersTPHLocalRoad6 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Jan 2020 To 30 Apr 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube84.545.984.0100
(2.)SO2Micro Gram per Meter Cube14.85.914.780
(3.)NOxMicro Gram per Meter Cube28.213.728.080
(4.)PM2.5Micro Gram per Meter Cube32.017.031.860
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l11100100
(2.)TDSmg/l15822265002000
(3.)Heavy MetalsZIncmg/l0.10.1515
(4.)pHNA8.377.096.58.5
(5.)Chloridesmg/l56022.272501000
(6.)Total Hardnessmg/l583125200600
(7.)Fluoridemg/l0.570.1811.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l341.2D
(2.)CODmg/l2005.6E
(3.)pHNA7.626.68A
(4.)DOmg/l6.15.1B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.751.275
(2.)Leq(Night)A-weighted decibels(dB(A))684070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram46.6915.54
(2.)N(Nitrogen)Milligram per Kilogram561.65138
(3.)pH7.245.1
(4.)K(Potassium)Milligram per Kilogram18094
(5.)Electric ConductivityOthersµS/cm110.370
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 10
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPrivate Tanker208Copy of Permission LettermodeOthersLorryOthersLorryNil01 May 202012.2
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent610MEE and ATFDReuse within the Plant & Recycling,OthersSalt5.40.6
(2.)Sewage2.43STPGreen Belt Renewal Plant2.4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8.4
(b)Total Discharged Water (Kilolitre per Day) 0.6
(c)Total Reused Water (Kilolitre per Day) 7.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)InorganicMunicipal Solid Waste2.3Tons8RoadAuthorized Recyclers
(2.)OrganicMunicipal Solid Waste3.5Tons3RoadOthersLocal Bins
(3.)AshOthersOther39Tons12RoadOthersBrick manufacture
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube3200.0832.160
(2.)SO2Microgram per Meter Cube14.800.0714.8880
(3.)NOxMicrogram per Meter Cube28.201.0929.380
(4.)PM10Microgram per Meter Cube84.500.0884.6100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler 0.75 TPHFirewood200.4SO20.00905
(2.)Boiler 0.75 TPHFirewood200.4PM100.0309
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 139.87
(b)Source TANGEDCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 200 kVA (proposed)
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.3745
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.3745
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20185
(b)Waste/Barren Land (ha.) 1289
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 4213
(e)Settlements (ha.) 2781
(f)Industrial (ha.) 328
(g)Forest (ha.) 2425
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining 278
    Total (ha.) 31499.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.3745
Total (ha.) 0.3745
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNil0Nil
(2.)WLSNil0Nil
(3.)NPANil0Nil
(4.)ESAsNil0Nil
(5.)ESZsNil0Nil
(6.)Critically Polluted AreaRanipet SIPCOT2.88WSW
(7.)CorridorsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAmmur RF1.82ENE
(2.)Defence InstallationsNil0Nil
(3.)Archaeological SitesNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Settithangal Lake
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.96
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 35
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt597.4900.671498.07
(2.)Percentage of Total Project Area15.9524.0339.980000000000004
(3.)No. of Plants15165180
(4.)Funds Allocated50000450000500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialJob offer to 35
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0083
(ii)Name of the EIA Consultant HUBERT ENVIRO CARE SYSTEMS (P) LTD, CHENNAI
(iii)Address A-21, (Behind Lions Club School) III Phase, Thiru Vi Ka Industrial Estate. Guindy, Chennai - 600 032.
(iv)Mobile No. 9884390811
(v)Landline No. 0444363555
(vi)Email Id moses@hecs.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 29 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC along with complete public hearing/consultation documents, needs to be uploaded. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) 2. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 3. This is an expansion proposal accordingly, the PP shall submit the compliance report to the conditions of consents from the SPCB. (S.No 9 of Form 2 has to revised and uploaded), 4. S. no. 23.1 of form 2 (CPA) mentioned However PP has not submitted the Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. 5. All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2). 6. Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. 7. Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted 8. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) 9. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 26 Jun 2020
2.NAThe correction have been made as per the instruction received 06 Jul 2020
3.NA1. Please read the earlier EDS sought by the Ministry earlier. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal (For eg. (a) Certified compliance report on CTO, as per TOR, has not uploaded in Form 2, and, (b) Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC has not uploaded in Form 2. PP/consultant has not uploaded the document on PH forwarded by SPCB to MoEFCC) Form 2 (S.no. 7.1) 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 28 Jul 2020
4.NAThe correction have been made as per the instruction received 11 Sep 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAs per the ADS, we upload Revised EIA report with DAR Report along with ADS reply and affidavit 19 Dec 2020
2.NA

The Committee, at the first instance opined that the matter may be examined by the Ministry and the proposal shall be considered by the EAC based on the decisions taken.

 

The Committee also observed that the consultant has also tried to conceal the facts and mislead the EAC/Ministry. The attitude of the consultant may be reported to QCI to debar from this sector for presenting the cases before EAC in MoEF&CC.

 

After detailed deliberation, the proposal was deferred for the needful.

29 Oct 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDinesh Kumar R
DesignationOwner
Name of Company (Applicant Name should not be given here)SANSKAR CHEMICALS AND DRUGS PRIVATE LIMITED
AddressS.F. No. 457/3A, 457/3C, 457/4A, 457/4C, 457/4C (Part), Ammoor village,
Print