Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Building construction of Group Housing Society on Residential Plot leased by DDA.
(b)Name of the Company / Organisation THE MODEST KETKI COOP. GROUP HOUSING SOCIETY LTD.
(c)Registered Address Plot No. 8B, Sector - 11, Dwarka, New Delhi,,South West,Delhi-110075
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Navneet Kumar
(b)Designation (Owner/ Partner/ CEO) Secretary
(c)Address D-103, The Modest Ketki Coop. Group Housing Society Ltd. Plot no. 8B, Sector - 11, Dwarka, New Delhi,,Delhi Cantonment.,South West,Delhi-110075
(d)Pin code 110075
(e)E-mail modestketki12@gmail.com
(f)STD Code. 798(f)Telephone No. 2657854
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/NCP/155068/2020
(d)Master Proposal Number(Single Window) SW/153453/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 8B
(b)Pincode 110075
(c)Bounded Latitudes (North)
From
Degree 28.5878
Minutes
Second
From
Degree 28.606
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.0492
Minutes
Second
From
Degree 77.0499
Minutes
Second
(e)Survey of India Topo Sheet No. 53D14, 53D15, 53H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 220
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.1
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Not applicable
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANAits building construction project
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Plot area in Sq.m.13000OthersSq.m.OthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto 31 Dec 1900
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.95
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.09
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0Tons per AnnumNARoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 1900 To 31 Dec 1900
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube0000
(2.)SO2Micro Gram per Meter Cube0000
(3.)NOxMicro Gram per Meter Cube0000
(4.)PM2.5Micro Gram per Meter Cube0000
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l0000
(2.)Fluoridemg/l0000
(3.)TSSmg/l0000
(4.)Total Hardnessmg/l0000
(5.)Chloridesmg/l0000
(6.)Heavy MetalsIronmg/l0000
(7.)pHNA0000
(8.)Heavy MetalsIronmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00B
(2.)CODmg/l00B
(3.)DOmg/l00B
(4.)pHmg/l00B
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre00
(2.)N(Nitrogen)Millisiemens per Centimetre00
(3.)pHMillisiemens per Centimetre00
(4.)P(Phosphorus)Millisiemens per Centimetre00
(5.)K(Potassium)Millisiemens per Centimetre00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.84 To 58.89
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.76 To 60.43
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board7117Copy of Permission LetterPipelineOthersSupply of DJBF.2(149)AE-1/WD-13/DDA/(i)/1903 Feb 200975
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste78200STPOthersReused in site4335
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 78
(b)Total Discharged Water (Kilolitre per Day) 35
(c)Total Reused Water (Kilolitre per Day) 43
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic wasteMunicipal Solid Waste227.22Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube00010
(2.)SO2Microgram per Meter Cube00010
(3.)PM2.5Microgram per Meter Cube00010
(4.)PM10Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetLSD80.01SO21
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 650
(b)Source BSES Rajdhani HPower Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.3
    Total Land (ha.) 1.3
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Residential Area 1.3
    Total (ha.) 1.3000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.3Residential Area
Total (ha.) 1.3
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area000
(2.)WLS000
(3.)NPA000
(4.)ESAs000
(5.)ESZs000
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPusa Hill Forest/Central Ridge Reserve forest9.780
(2.)Archaeological SitesNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.3
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.21
(b)Percentage of Total Project Area 16.15
(c)No. of Plants to be Planted 48
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIts generates local economic activity including jobs and income generated by construction workers and new residential.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 50
(b)Total No. of Flats to be Build 226
(c)No. of Buildings 5
(d)Total plot area (sqm) 13000
(e)Total built up area (sqm) 32624.75
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 1
(d)Capacity 56.52
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 387
5.
Energy Saving Measures:
(a)Source/Mode Solar Energy
(b)Percentage 25
(c)Quantity 160
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0128
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Ltd.
(iii)Address SCO 20-21, 1st Floor, Near Hotel Dolphin, Kalka Shimla, Highway, Dhakoli, Zirakpur, Punjab 140604
(iv)Mobile No. 9650601156
(v)Landline No. 0176250949
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Application has been examined. 2. Please address following deficiencies found in your application No. IA/DL/NCP/155068/2020, Dated 31st May: I. No clarity w.r.t. applicability of EIA Notification 1994, as amended vide notification dated 07.07.2004 on the existing building; II. Date of completion of existing building and existing built-up area is not available. Submit Building Completion/ occupancy certificate; III. Information supplied in Form-2 w.r.t. Details of Consent to Operate (CTO) are mismatching (See entries for 9.1/ (i) and (iv)); IV. Copy of the CTO for existing building obtained from Delhi Pollution Control Committee has not been provided; V. In FORM 2; Funds Allocated towards CER (Corporate Environment Responsibility) (in Crores) are not as per MOEFCC’s Guidelines issued vide Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. Submit Revise CER Plan; VI. Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been attached at SI No. 2 of FORM 2 ( File attached pertains to accreditation certificate of consultant appointed for the proposed project) ; VII. In FORM 2; Units for Maximum Elevation Above Means Sea Level (AMSL) and Distance of Nearest HFL within the study area from the project boundary, waste water generation and treatment have not been provided. Mismatch in built-up area given at ‘SI 1’ and ‘SI 22’ of FORM 2. Mismatch in Lat./ Long. of the project site given in FORM 2 and FORM-1/1A; VIII. Justification for the proposal to Install STP of 200KLD, while Waste Water generation is reported to be 87.2 KLD; and IX. In FORM 2; Incorrect data w.r.t. Period of Base Line Data Collection in FORM 2 (FROM 01 Jan 1900 to 31 Dec 1900). Further, details of Monitoring Locations along with data for Ambient Air Quality, Ambient Noise Ground Water, Surface Water and Soil Quality are not provided. You may like to submit the revised Application after addressing the above deficiencies. 01 Jun 2020
2.NAThe correction have been made as per the instruction received 11 Aug 2020
3.NAThe Application has been examined. Earlier, an EDS was raised on 01.06.2020 and deficiencies found in the application No. IA/DL/NCP/155080/2020, dated 31st May, 2020 were communicated to you. 2. Now, your reply dated 11.08.2020 to the EDS dated 01.06.2020 also suffers from the following deficiencies: (i) Your letter dated 11.08.2020 uploaded on the central Parivesh portal is addressed to Member Secretary, SEAC, Himachal Pradesh; (ii) The subject of letter dated 11.08.2020 is regarding withdrawal of TOR Proposal, whereas your application i.e. IA/DL/NCP/155080/2020 is for grant of Environmental Clearance; and (iii) The letter dated 11.08.2020 has not be signed by the authorised representative of the Project Proponent. 3. In case of intention to withdraw the current application (IA/DL/NCP/155080/2020), the PP shall submit a formal request at the portal in “Withdrawal Section”. Otherwise, address deficiencies as conveyed vide MoEFCC’s EDS dated 01.06.2020. 14 Aug 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNavneet Kumar
DesignationSecretary
Name of Company (Applicant Name should not be given here)THE MODEST KETKI COOP. GROUP HOUSING SOCIETY LTD.
AddressPlot No. 8B, Sector - 11, Dwarka, New Delhi