Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Shree Sairaj Enterprise
(b)Name of the Company / Organisation M/S. SHREESAIRAJ
(c)Registered Address Survey No. 81, plot no.14,15,16 At.Bhuvana, Ta.Gondal Dis. Rajkot, Gujarat,,Rajkot,Gujarat-360011
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Iteshkumar Babulal Dalsaniya
(b)Designation (Owner/ Partner/ CEO) TEC
(c)Address Survey no.82, plot no. 14,15,16 At.Bhuvana, Ta.Gondal, Dis. Rajkot, Gujarat, India,,Kotda Sangani,Rajkot,Gujarat-36011
(d)Pin code 36011
(e)E-mail shreesairaj990@gmail.com
(f)STD Code. 281(f)Telephone No. 2233
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/92425/2019
(d)Master Proposal Number(Single Window) SW/154929/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no.82,P2, plot no. 13,14,15,16
(b)Pincode 360311
(c)Bounded Latitudes (North)
From
Degree 22.057497
Minutes
Second
From
Degree 22.058172
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.772536
Minutes
Second
From
Degree 70.773217
Minutes
Second
(e)Survey of India Topo Sheet No. F42K16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 132
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratRajkotGondal
(2.)GujaratRajkotGondalBhunava
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/27/2019-IA-II(I)
(b)Date of Apply of TOR 28 Jan 2019
(c)Date of Issue of TOR / Standard ToR 05 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :2
Hadamtala Industrial Association Hall, Hadamtala Industrial Association, Survey No-177, P/18, Plot No: 01 Rajkot-Gondal N.H. 8- B, Bharudi Chowkdi, Neat Toll Plaza, Opp: 66 KV Power Station, Tal: Gon
State :Gujarat
District :Rajkot
Tehsil :Gondal
Village :Hadamtala
44Hazardous waste management Noise pollution mitigation Benefits from unit Time span for scholarship and medical servicesOthersAdditional District Magistrate & Resident District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Storage Tanks3 Tonnes4 nos
(2.)Hydraulic Press1 Tonne1 nos
(3.)Boiler3 Tonnes1 nos
(4.)Reactors8 Tonne, 3 Tonne, 1 Tonne3nos
(5.)Reaction Vessels10 Tonnes3 nos
(6.)DryerNA3 nos
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Melamine Formaldehyde Resin720Tons per AnnumRoad
(2.)Cardanol Phenol Formaldehyde Resin1800Tons per AnnumRoad
(3.)Phenol Formaldehyde Resin1800Tons per AnnumRoad
(4.)Urea Formaldehyde Resin4200Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Oct 2018
(iv)Valid Upto 30 Jun 2023
(v)File No. AWH-32592
(vi)Application No. 144628
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2.745
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.08
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.068
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.045
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8151
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 8151
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Caustic Soda42.6Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(2.)Cardanol174Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(3.)Acetic Acid21Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(4.)Formaldehyde (37%)3600Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(5.)Urea1680Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(6.)Phenol1566Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
(7.)Melamine288Tons per AnnumOpen marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.522.1639.860
(2.)PM10Micro Gram per Meter Cube94.1051.4992.6100
(3.)SO2Micro Gram per Meter Cube10.45.7910.280
(4.)NOxMicro Gram per Meter Cube19.89.819.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l10.11010
(2.)Chloridesmg/l3472152501000
(3.)TDSmg/l10457605002000
(4.)Total Hardnessmg/l446213100600
(5.)Fluoridemg/l0.470.130.11.5
(6.)pHNA7.547.1478.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.957.19D
(2.)BODmg/l105D
(3.)CODmg/l4016D
(4.)DOmg/l75D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.846.1Industrial zone 75, Silence zone 50
(2.)Leq(Night)A-weighted decibels(dB(A))64.237.9Industrial zone 70, Silence zone 40
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram130105
(2.)K(Potassium)Milligram per Kilogram74.148.2
(3.)P(Phosphorus)Milligram per Kilogram6.82.5
(4.)Electric ConductivityMillisiemens per Centimetre0.850.48
(5.)pH7.87.36
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater410.0Copy of Permission LetterPipelineOthersSubmersible Pump21-4/5501/GJ/IND/201922 Nov 201950
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial11.615ETP, RO 2 stage and MEEOthersEVAPORATED THROUGH MEE11.50.1
(2.)Doemstic44Soak pitOthersSOAK PIT04
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 15.6
(b)Total Discharged Water (Kilolitre per Day) 4.1
(c)Total Reused Water (Kilolitre per Day) 11.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)USED OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons100RoadAuthorized Recyclers
(2.)EDGE CUTTING WASTEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons100RoadCo-Processing
(3.)DISCARDED CONTAINERS/BARRELSE Waste6Tons100RoadAuthorized Recyclers
(4.)ETP SLUDGE/EVAPORATION RESIDUEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.92.080.420.3180
(2.)PM10Microgram per Meter Cube95.82.080.896.7100
(3.)SO2Microgram per Meter Cube122.080.2212.2380
(4.)PM2.5Microgram per Meter Cube38.92.080.839.760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD60.2OthersPM,SOx,NOxPM<150mg/Nm3, SO2<100ppm,NOx<50ppm
(2.)BoilerWhite coal/Briqquetes/Agro Waste300.5OthersPM,SOx,NOxPM<150mg/Nm3,SO2<100ppm,50ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 180
(b)Source Search Results Web result with site links Paschim
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 100 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.2730
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.2730
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22755.3
(b)Waste/Barren Land (ha.) 3214.79
(c)Grazing/ Community Land (ha.) 3566.45
(d)Surface Water Bodies (ha.) 512.61
(e)Settlements (ha.) 692.57
(f)Industrial (ha.) 670.91
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31412.6300
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.0910
(2.)Built Up Area0.019375
(3.)OthersOTHERS0.058802WC area, ETP area, Parking area, Open area
(4.)Main Plant0.103836
Total (ha.) 0.273013
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsRampara wildlife sanctuary80NONE WITHIN 10 KM
(2.)CorridorsNONE0NONE WITHIN 10 KM
(3.)Critically Polluted AreaVatva251NONE WITHIN 10 KM
(4.)ESAsRampara wildlife sanctuary80NONE WITHIN 10 KM
(5.)Wildlife Corridorsnone0NONE WITHIN 10 KM
(6.)WLSRampara wildlife sanctuary80NONE WITHIN 10 KM
(7.)NPAHingolgadh Sanctuary80NONE WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestHingolgadh Sanctuary80None within 10 km
(2.)Defence InstallationsNA0None within 10 km
(3.)Archaeological SitesNaulakha Palace14None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.27
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Near Lunivav
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 4
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 4
(e)No. of working days 325
(f)Total Manpower 18
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.09
(b)Percentage of Total Project Area 32.97
(c)No. of Plants to be Planted 140
(d)Funds Allocated for Plantation 40000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment & trade opportunities will be generated with the starting of the proposed activities. Thus, these considerable employment & trade opportunities will eventually result in appreciable economic benefits to the local people & businesses/contractors.
(2.)FinancialThe employed people are benefited financially as this financial growth fulfills their economic requirements, which in turn will increase their standard of living.
(3.)EnvironmentalUnit will develop greenbelt in 910 Sq.m.The green belt helps to capture the fugitive emissions and to attenuate the noise generated in the plant apart from improving the aesthetics of the plant site.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc.
(iii)Address Green Empire (Anupushpam), Above Axis Bank, near Yash Vadodara, 390021
(iv)Mobile No. 9311768924
(v)Landline No. 0265237126
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 08 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. On examination it is noted that the important documents are not legible. Kindly once check before uploading (For ex. PH Proceeding) 2. Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC along with complete public hearing/consultation documents, needs to be uploaded. Also issues raised during public hearing, response by the project proponent, action plan with budgetary allocation has not been submitted. Kindly upload the requisite documents. Form 2 (S.no. 7.1) 3. Action Plan with budgetary provisions and time lines on the issues raised during PH has not uploaded in Form 2. Kindly upload the action plan in S.No. 7.1 of Form 2 alongwith other requisite details. 4. PP mentioned very less incremental value for PM10 & PM2.5 & SOX, PM2.5 in Form 2. Air Quality Impact Prediction mentioned (18.1 of form 2) is inadequate kindly correct it. 5. All old CTOs not uploaded to verify the violation, if any done by PP. 6. Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) 7. PH was conducted in September 2019, however, PP has now submitted the EC application in May 2020. Please submit the reason why delay in submission of application. 8. Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted 9. Updated status of water approval 10. Consultant is only accredited upto 04.06.2020. Kindly upload the valid & latest accreditation certificate, if any Consultant have with them. 11. It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 26 Jun 2020
2.NAThe correction have been made as per the instruction received 01 Jul 2020
3.NA1. Please read the earlier EDS sought by the Ministry earlier. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal (For eg. Documents related to Public hearing proceedings which has forwarded by the Member Secretary, SPCB to the MoEFCC has not uploaded in Form 2. PP/consultant has not uploaded the document on PH forwarded by SPCB to MoEFCC) Form 2 (S.no. 7.1) 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 28 Jul 2020
4.NAThe correction have been made as per the instruction received 04 Aug 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantIteshkumar Babulal Dalsaniya
DesignationTEC
Name of Company (Applicant Name should not be given here)M/S. SHREESAIRAJ
AddressSurvey No. 81, plot no.14,15,16 At.Bhuvana, Ta.Gondal Dis. Rajkot, Gujarat