1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Manufacturing of Asbestos Cement Sheets( Corrugated & Plain) of Capacity 50,000 TPA & Non Asbestos Flat sheets of Capacity 30,000 TPA of M/s JRT Industries LLP | (b)Name of the Company / Organisation | JRT INDUSTRIES LLP | (c)Registered Address | H.No. 62 , Tarun Nagar, Bye lane 2 , GS road, Kamrup,,Kamrup,Assam-781005 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | DEEPAK KAYAL | (b)Designation (Owner/ Partner/ CEO) | PARTNER | (c)Address | HOUSE NO. 62, BY LANE NO.2, ABC ,TARUN NAGAR , GS ROAD, DISTRICT KAMRUP , STATE ASSAM,,Guwahati,Kamrup,Assam-781005 | (d)Pin code | 781005 | (e)E-mail | sonali.jumbogroup@gmail.com | (f)STD Code. | 361(f)Telephone No. | 2465630 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(c) Asbestos milling and asbestos based products
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AS/IND/99846/2019 | (d)Master Proposal Number(Single Window) | SW/154810/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 43,24,25,122,149,580,195,147,522,353,439,392 | (b)Pincode | 781101 | (c)Bounded Latitudes (North) | | From | | Degree | 26.239983 | Minutes | | Second | | From | | Degree | 26.242111 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 91.700797 | Minutes | | Second | | From | | Degree | 91.7035 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 78N/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 64 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.5 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Assam | Kamrup | Guwahati | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/161/2019-IA-II(I) | (b)Date of Apply of TOR | 19 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 20 May 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 07 Dec 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.8 |
| Sri Sri Ganesh MandirPrathamikBidyalaycampus,Vill. HaluguriChowk, Sila, P.O. Changsari, Dist. Kamrup, Assam. | State : | Assam | District : | Kamrup | Tehsil : | Guwahati | Village : | Sila |
| 70 | Environmental problems, effect on health etc., Waste water discharge, Employment to locals, To carry out some work for the interest of the locality, Construction and renovation of temple etc.. | Others | Addl. District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Bag Shredder | 1 set | Motor 15 hp Shredder Blower | (2.) | Waste Recycling System | 1 set | Stirrer Motor 5 hp Pump 67 cum/Hr. Motor 7.5 hp | (3.) | Wet Ball Mill | 1 set | Gear box Ratio 25:1 Motor 25 hp | (4.) | Hydraulic Power Pack | 2 set | Motor 40 hp Pump PVR150-FF-140 | (5.) | Corrugated Templates | 2000 No.s | Length 6200 mm Width 1200 mm | (6.) | Automatic Bag Opener | 1 set | Motor 5 hp / 2 hp HSS Cutter 2 Nos. | (7.) | E.R. Mill | 1 set | Motor 50 hp`` Gear box Ratio 30:1 | (8.) | Fibre Storage Tank | 1 set | Geared Motor 10 hp Paddle Screw 2 Nos. | (9.) | Hydro disintegrator | 1 set | Motor 40 hp Metso Pump 100 cum/Hr. | (10.) | Beater tank | 1 set | motor 25hp | (11.) | Agitator cum Storage mixer | 1 set | Motor 20 hp Gear Box Ratio 50:1 | (12.) | Agitator cum Storage mixer | 1 set | Motor 20 hp Gear Box Ratio 50:1 | (13.) | Hydro Pulper and Pulp Slurry Storage Tank | 1 set | Slusher Motor 75 hp Stirrer Motor 5hp | (14.) | Cement Storage & Feeding System | 1 set | Screen Motor 5 hp | (15.) | Fly ash storage & slurry/feeding Sys | 1 set | Geared Motor 5 hp Blower 75 hp | (16.) | Fly ash storage & slurry/feeding Sys | 1 set | Geared Motor 5 hp Blower 75 hp | (17.) | Waste Desolving System | 1 Set | Stirrer Motor 15 hp Pump Metso HM-100 Motor 30 hp | (18.) | Hatscheck Machine | 1 set | Complete with Main Drive 125hp | (19.) | Vacuum Pump | 3 set | Motor 75 hp Complete with Water Separator Pump and | (20.) | 1st Conveyor | 1 set | Geared Motor 5 hp | (21.) | 2nd Conveyor | 1 set | Geared Motor 5 hp Ratio 8:14 15 m long PVC Belt | (22.) | Atmospheric Corrugator | 1 set | Hydraulic Cylinder Operated | (23.) | Electrical Control System | 1 | Complete with Contactors, Relay, MCB | (24.) | Moulding Cutting Press | 1 set | Hydraulic Operated | (25.) | Pulp Slurry Refiner | 1 SET | Double Disc Refiner 150 hp motor | (26.) | Weighing System /Fibre Hopper | 1 set | Load Cell 250 kg x 4 Pneumatically Operated | (27.) | Waste Shredder | 1 set | Geared Motor 10 hp Ratio 46:3 | (28.) | Pre-mix Tank | 1 set | Geared Motor 5 hp Ratio 20:2 | (29.) | High Pressure Pump | 2 set | Motor 50 hp Max Pressure 5.0 bar | (30.) | EOT Crane 10 Ton Capacity | 1 set | CT 2 hp LT 5 hp Hoist 15 hp | (31.) | Agitator cum Storage mixer | 1 set | Motor 20 hp Gear Box Ratio 50:1 | (32.) | Dust Collectors 3 Nos. | 3 set | Motor 15 hp | (33.) | Back Water Pump | 1 set | Motor 75 hp | (34.) | D.G. Set | 3 set | 600 KVA 320 KVA With Enclosures | (35.) | Cone Tanks 4 Nos. | 4 No.s | Cap 85 KL with overflow and blow down arrangements | (36.) | Air Compressor | 3 sets | IR Screw type Motor 40 hp | (37.) | Hydraulic Power Pack | 2 set | Motor 40 hp Pump PVR150-FF-140 | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Non Asbestos flat Sheets | 30000 | Tons per Annum | | Road,Rail | | (2.) | Asbestos Corrugated Sheets | 40000 | Tons per Annum | | Road,Rail | | (3.) | Asbestos Plain Sheets | 10000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 71.75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.05 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.445 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.125 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 64200 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 64200 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Asbestos Fibre Chrysotile | 4600 | Tons per Annum | | Russia | Road,Rail,Others | sea | 1000 | Others | Intent | Copy of Linkage | (2.) | Cement | 36000 | Tons per Annum | | local industry | Road | | 100 | Others | Intent | Copy of Linkage | (3.) | Fly ash | 20000 | Tons per Annum | | NTPC- Assam and West Benga | Road,Rail | | 1000 | Others | Intent | Copy of Linkage | (4.) | pulp | 1000 | Tons per Annum | | Local Suppliers | Road | | 15 | Others | Intent | Copy of Linkage | (5.) | Virgin pulp | 2600 | Tons per Annum | | Tasmania, Chile | Road,Rail,Others | sea | 1000 | Others | Intent | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 15.5 | 6.03 | 14.3 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 70.4 | 27.67 | 70.1 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 56.13 | 15.46 | 52.8 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 29.8 | 7.1 | 28.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 256 | 224 | 200 | 600 | (2.) | Fluoride | | | mg/l | | 0.65 | 0.45 | 1 | 1.5 | (3.) | Heavy Metals | | LEAD | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (4.) | Chlorides | | | mg/l | | 46 | 28 | 250 | 1000 | (5.) | Others | Nitrate | | mg/l | | 15.6 | 10.96 | 45 | 45 | (6.) | pH | | | NA | | 7.44 | 7.02 | 6.5 | 8.5 | (7.) | TDS | | | mg/l | | 694 | 535 | 500 | 2000 | (8.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (9.) | Heavy Metals | | LEAD | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.86 | 7.77 | C | (2.) | DO | | mg/l | | 5.5 | 5.1 | C | (3.) | BOD | | mg/l | | 2 | 2 | C | (4.) | COD | | mg/l | | 0 | 0 | C | (5.) | Others | TDS | mg/l | | 735 | 632 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.9 | 50.1 | 75 (Industrial) and 55 (Residential) | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.4 | 41.7 | 70 (Industrial) and 45 (Residential) | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 180 | 148 | (2.) | pH | | | 6.8 | 6.35 | (3.) | Electric Conductivity | Others | µ mhos/cm | 310 | 234 | (4.) | P(Phosphorus) | Kilogram per hectare | | 130 | 96 | (5.) | K(Potassium) | Kilogram per hectare | | 118 | 78 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 6.55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 4.55 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 100 | 0.15 | Copy of Permission Letter | Pipeline | | Tube Well | | NOC.No. –CGWA/NOC/IND/ORIG/2020/8167 | 03 Jul 2020 | 100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic,office,canteen | 15 | 15 | STP | Green Belt Renewal Plant | | 15 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 15 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 15 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Hard broken pieces | Others | damages rejects | 28.82 | Tons | 0 | Road | | Others | 100% Recycled in process | (2.) | Process sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 13.74 | Tons | 0 | Pipe Conveyor | | Others | 100% Recycled in process | (3.) | Empty Fibre bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6.86 | Tons | 0 | Conveyor Belt | | Others | 100% Recycled in process | (4.) | FLY ASH DUST | Fly Ash | | 0.24 | Tons | 0 | Conveyor Belt | | Others | 100% Recycled in process | (5.) | Fibre dust | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.07 | Tons | 0 | Conveyor Belt | | Others | 100% Recycled in process | (6.) | Cement dust | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.29 | Tons | 0 | Conveyor Belt | | Others | 100% Recycled in process | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 11.3 | 6.4 | 0.03 | 11.34 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 62.18 | 3.5 | 0.00 | 62.19 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 44.12 | 5.4 | 0.19 | 44.31 | 60 | (4.) | NOx | | Microgram per Meter Cube | 26.5 | 6.4 | 0.03 | 26.54 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Asbestos fibre dust collector | NA | 19 | 0.35 | Others | PM | 0.1 | (2.) | Cement dust collector | NA | 19 | 0.35 | Others | PM | 0.15 | (3.) | Fly ash dust collector | NA | 19 | 0.35 | Others | PM | 0.14 | (4.) | DG SET | Diesel | 19 | 0.2 | Others | PM | 0.89 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1500 | (b)Source | APDCL & Solar | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 900 KVA & 320 KVA | (e)Stack Height (in m) | 19 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.34 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.34 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : PVT NON AGRICULTURE | 4.34 | Total (ha.) | 4.3400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.59 | | (2.) | Green belt | | 1.43 | | (3.) | Built Up Area | | 1.5 | Office,stock yard,warehouse | (4.) | Others | includes parking,silos,roads | 0.82 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NOT APPLICABLE | 0 | NOT APPLICABLE | (2.) | ESAs | NOT APPLICABLE | 0 | NOT APPLICABLE | (3.) | ESZs | NOT APPLICABLE | 0 | NOT APPLICABLE | (4.) | Corridors | NOT APPLICABLE | 0 | NOT APPLICABLE | (5.) | Critically Polluted Area | NOT APPLICABLE | 0 | NOT APPLICABLE | (6.) | NPA | NOT APPLICABLE | 0 | NOT APPLICABLE | (7.) | Wildlife Corridors | NOT APPLICABLE | 0 | NOT APPLICABLE | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NOT APPLICABLE | 0 | NOT APPLICABLE | (2.) | Forest | | NOT APPLICABLE | 0 | NOT APPLICABLE | (3.) | Defence Installations | | NOT APPLICABLE | 0 | NOT APPLICABLE | (4.) | Others | River | Brahamaputra river | 5.5 | South direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.34 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NIL | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Brahamputra river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 5.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 335 | (f)Total Manpower | 250 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.43 | (b)Percentage of Total Project Area | 32.95 | (c)No. of Plants to be Planted | 2150 | (d)Funds Allocated for Plantation | 1000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | State will earn revenue which will be utilised for development of the area. | (2.) | Environmental | PP will take care of the environment by regular monitoring of environmental parameters as per plan
and take mitigative measures as & when required. | (3.) | Social | Total direct & indirect employment generation will be approx. 100 & 150 respectively. The work
men will be employed from nearby local villages at different levels depending on availability. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 95 | (ii)Name of the EIA Consultant | Ecomen Laboratories Pvt. Ltd. | (iii)Address | Flat No. 8, 2nd Floor , ArifChamber –V, Sector –H, Aliganj, Lucknow-226024 | (iv)Mobile No. | 9415410773 | (v)Landline No. | 0522276188 | (vi)Email Id | ravi.bhargava@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 20 Sep 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal is returned due to the following shortcomings:
i. Ground water withdrawal permission may be submitted.
ii. Occupational Risk assessment is inadequate. Accidental releases were not envisaged and corresponding risk was not assessed.
iii. Risk Assessment for containment failure of HSD tank and related safety features /procedures as per OISD guidelines.
iv. Topo sheet loaded seems to be not covered 10 km aerial distance around project site.
v. Kml file is not accessible. Appropriate KML file shall be uploaded.
vi. Complete list of attendees is not attached with proceedings of Public Hearing.
vii. Advertisement/ Public Notice in the daily in local language for Public Hearing is not attached. | 16 Jun 2020 | 2. | NA | Proposal is returned due to the following shortcomings:
i. Ground water withdrawal permission may be submitted.
ii. Occupational Risk assessment is inadequate. Accidental releases were not envisaged and corresponding risk was not assessed.
iii. Risk Assessment for containment failure of HSD tank and related safety features /procedures as per OISD guidelines.
iv. Topo sheet loaded seems to be not covered 10 km aerial distance around project site.
v. Kml file is not accessible. Appropriate KML file shall be uploaded.
vi. Complete list of attendees is not attached with proceedings of Public Hearing.
vii. Advertisement/ Public Notice in the daily in local language for Public Hearing is not attached. | 16 Jun 2020 | 3. | NA | The correction have been made as per the instruction received | 08 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | DEEPAK KAYAL | Designation | PARTNER | Name of Company (Applicant Name should not be given here) | JRT INDUSTRIES LLP | Address | H.No. 62 , Tarun Nagar, Bye lane 2 , GS road, Kamrup |
|