Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Makardhokra I OC mine (Phase-I) for increase in cap. from 2.0 MTY to 3.5 MTY in ML area of 614.69 ha located in Umred teh, Nagpur Dist, MH
(b)Name of the Company / Organisation Western Coalfields Limited
(c)Registered Address Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kaushik Chakraborty
(b)Designation (Owner/ Partner/ CEO) G.M (MINING)/ ENVIRONMENT.
(c)Address NIL
(d)Pin code 440001
(e)E-mail gmenvironment.wcl@coalindia.in
(f)STD Code. 712(f)Telephone No. 2510151
(g)Fax No. 2510151
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/CMIN/154498/2018
(d)Master Proposal Number(Single Window) SW/154481/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Near Shirpur Village Umred tehsil Nagpur Dist boun
(b)Pincode 441203
(c)Bounded Latitudes (North)
From
Degree 20.84250000
Minutes
Second
From
Degree 79.23555556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 20.87055556
Minutes
Second
From
Degree 79.27333333
Minutes
Second
(e)Survey of India Topo Sheet No. 55 P/1 & 55 P/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 295
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/54/2006-IA-II (M)
(c)Date of Issue of TOR 07 Nov 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 31 May 2020
(c)Date of Issue of EC 20 May 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Dec 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :4
Community Hall WCL Colony
State :Maharashtra
District :Nagpur
Tehsil :Umred
Village :near Waygaon- Ghoturli
400land compensation, Employment, roads, Plantation, CSR etc.OthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-1031/RON/2019-NGP/5783 dated 01.10.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 31 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Production Capacity2.01.53.5OthersMTPARoad,Rail
(2.)Land area614.690614.69Hectares(ha)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Opencast Coal MiningShovel Dumper CombinationShovel Dumper CombinationShovel Dumper Combination
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Jan 2019
(iv)Valid Upto 31 Mar 2021
(v)File No. UAN No 24388/ CC-1901000356
(vi)Application No. MPCB-CONSENT-0000024388
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 266.2308
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.9709
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.5
(b)Existing quantity of raw material/fuel 2.0
(c)Total quantity of raw material/fuel 3.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosives4637Otherstonnes per annumCIL approved vendorsRoad0 LinkageCopy of Linkage
(2.)High Speed Diesel10830OthersKL per annumFrom OMCsRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Oct 2019 To 15 Jan 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13111380
(2.)OthersSPMMicro Gram per Meter Cube130116130200
(3.)NOxMicro Gram per Meter Cube16141680
(4.)PM10Micro Gram per Meter Cube787078100
(5.)PM2.5Micro Gram per Meter Cube29262960
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA8.47.96.58.5
(2.)Total Hardnessmg/l484168200600
(3.)Fluoridemg/l0.620.471.01.0
(4.)TDSmg/l7762965002000
(5.)TSSOthersTurbidity in NTU2115
(6.)Chloridesmg/l130202501000
(7.)OthersNAOthersNA0000
(8.)Heavy MetalsLeadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersNitratemg/l9.147.02C
(2.)CODmg/l1614C
(3.)BODmg/l2.41C
(4.)DOmg/l4.74.4C
(5.)pHNA7.57.3C
    14.4.     No. of Ambient Noise monitoring locations : 2
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.644.370
(2.)Leq(Day)A-weighted decibels(dB(A))56.248.675
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersm mhos per cm at 20 degree0.630.36
(2.)N(Nitrogen)Kilogram per hectare285.47236.87
(3.)P(Phosphorus)Kilogram per hectare26.5620.56
(4.)pH6.66.17
(5.)K(Potassium)Kilogram per hectare146.12116.59
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.80 To 12.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.20 To 7.50
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/685/MH/MIN/2017 (Application under process)
(f)Date of Issue 09 Jan 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Water Discharge22680Copy of Permission LetterPipelineOthersMine Discharge21-4/685/MH/MIN/2017 (Application under process)09 Jan 20172268
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine Dischrage2268480Sedimentation TankDischarge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant4801788
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2268
(b)Total Discharged Water (Kilolitre per Day) 1788
(c)Total Reused Water (Kilolitre per Day) 480
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverBurdenOthersOver burden56.10Tons1.50OthersInternal Haul RoadOthersDumping on adjacent mine void
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube290.281.643160
(2.)SO2Microgram per Meter Cube130.280.581480
(3.)PM10Microgram per Meter Cube780.289.8788100
(4.)NOxMicrogram per Meter Cube160.2826.464380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not ApplicableNot Applicable00PM10Not Applicable
(2.)Not ApplicableNot Applicable00OthersNANot Applicable
(3.)Not ApplicableNot Applicable00SO2Not Applicable
(4.)Not ApplicableNot Applicable00NOxNot Applicable
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2209
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 589.97
(c)Government Land (ha.) 24.72
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 614.69
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 589.97
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Government land 24.72
    Total (ha.) 614.6900
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0
(2.)Township0
(3.)Ash Pond0
(4.)Tailing Pond0
(5.)LandFill0
(6.)Water Reservoir0
(7.)Desalination Plant0
(8.)OB Dump Area137.81External OB dump
(9.)Built Up Area15.0Infrastruture and road
(10.)Green belt8.0
(11.)Safety Zone56.24
(12.)OthersUndisturbed Area144.68
(13.)Quarry Area252.96Total Excavation Area
Total (ha.) 614.69
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANot Applicable0Not Applicable
(2.)Critically Polluted AreaNot Applicable0Not Applicable
(3.)WLSNot Applicable0Not Applicable
(4.)Wildlife CorridorsNot Applicable0Not Applicable
(5.)ESAsNot Applicable0Not Applicable
(6.)CorridorsNot Applicable0Not Applicable
(7.)ESZsNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Nil
(2.)Archaeological SitesNot Applicable0Not Applicable
(3.)Defence InstallationsNot Applicable0Not Applicable
(4.)OthersNot ApplicableNot Applicable0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 614.69
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired land acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Shirpur Nallah
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Shirpur Nallah
(ii)Details of Study Conducted Yet to be conducted
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Amb river (tributary of Wainganga River)
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 275
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 275
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt12.50149.76162.26
(2.)Percentage of Total Project Area2.0324.3626.39
(3.)No. of Plants30000375650405650
(4.)Funds Allocated60000007513000081130000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in Green Belt area
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunites. Various CSR activities in adjoing villages will help in improving social status.
(3.)FinancialThe project will contribute to the Government through various taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 3.50
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. WCL/BD/SECTT/BM-313/2019/712
(b)Date of Approval 06 Aug 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department WCL Board
(e)Approved Mining Lease Area 614.69
(f)Approved Capacity 3.50
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 52.863
(b)Mineable Reserves (Million Ton) 17.16
(c)Extractable Reserves(Million Ton) 16.30
(d)Percent(%) of Extraction 95
(e)Grade of Coal /Ore /Mineral G-8 (GCV-4997 kCal/Kg)
(f)Stripping Ratio 1 : 7.35
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Not applicable
(h)Average Gradient(Degree) 1 in 9
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 6
(c)Thickness of seams to be worked on 4.69
(d)Maximum Thickness of Seams (metres) 8.85
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 614.69
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Land acquired as per CBA, 1957
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Land acquired as per CBA, 1957
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Land acquired as per CBA, 1957
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 137.81
(iii)Height (in meter) 90
(iv)Quantity (in Million Cubic meter) 68.02
(v)No. of year back fill up 1
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 96.90
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 15.90
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 6.08
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 6.08
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 156.06
(b)Depth (in meter) 140
(c)Volume (in Million Cubic meter) 160.0
12.
Details of Quarry:
(a)Final Void of 156.06 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 252.96
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper
(b)Surface to Siding/Loading trucks / tipper
(c)Transportation / Conveyor Details Road transportation, Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND589.970589.97
(2.)OTHERS(Specify)Government land24.72024.72
(3.)FOREST LAND000
(4.)GRAZING LAND000
(5.)SURFACE WATER BODIES000
(6.)WASTE LAND000
(7.)SETTLEMENTS000
TOTAL614.690614.69
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)VIRGIN AREA31.760112.92144.68
(3.)EXTERNAL OB DUMPS120017.81137.81
(4.)GREEN BELT8008
(5.)INTERNAL OB DUMPS0096.996.9
(6.)ROADS0.501.52
(7.)OtherSafety Zone0056.2456.24
(8.)BUILT UP AREA (COLONY/OFFICE)201113
(9.)EXCAVATION/QUARRY0156.0600156.06
TOTAL162.26156.06296.370614.69
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 137.81
(b)Internal Dump(in hectare) 96.90
(c)Quarry(in hectare) 252.96
(d)Safety Zone(in hectare) 56.24
(e)Final Void of 156.06 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 144.68
(h)Total afforestation plant (in hectare) 162.26
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 88.20
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20192.02.02.02.00
(2.)20202.02.02.01.990
(3.)20151.01.01.00.070
(4.)20161.01.01.00.960
(5.)20182.02.02.01.600
(6.)20172.02.02.01.810
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0092
(ii)Name of the EIA Consultant CMPDIL
(iii)Address Gondwana Place, Kanke road, Ranchi 834031
(iv)Mobile No. 6512231850
(v)Landline No. 0651223185
(vi)Email Id Gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPointwise Action taken report / Detailed Compliance has been prepared and same enclosed for herewith for your kind perusal 03 Apr 2021
2.NA

 

            The EAC after detailed deliberations observed that there are various issues which required further deliberations and inputs from PP. Further one of non-compliances has been highlighted by Ministry’s Regional Office about Amb River which has been diverted, while as per EC condition the river bank was required to be strengthened through embankment.  Also CSR provision, ETP augmentation, GW contamination, cost of conservation plan has not been addressed properly for the proposed project. In view of the non-compliances of earlier EC, the Committee recommends to sought clarification from Project Proponent. Further Committee proposed to issue the SCN to Consultant for submitting incomplete details. EAC desired further compliance on below mentioned observations.

 

(i)            PP to submit the Action Taken Report on the non-compliances/partial compliances of existing EC conditions and clarification on diversion of Amb River.

(ii)          PP should submit the details of Environment Management Plan regarding the commitments made during the Public Hearing. PP shall provide CSR provision with adequate effectiveness of EMP

(iii)       PP to provide the clarification for ETP expansion in view of additional load due vehicle washing/servicing and justification on ETP capacity with wastewater load from all sources. Accordingly, Water Balance diagram with zero liquid discharge considering no untreated mine water discharged in river

(iv)        PP needs to recheck Quality of ground water in view of public concern raised near flood area due to embankment.

(v)          Detailed plan to submit for trees plantation along both the sides of the Butibori-Kanwa PWD road which is passing in between proposed dip side quarry surface and external dump with broad leaves in three years to prevent the effect of air pollution.

(vi)        PP shall revise the cost of Conservation plan of schedule I species.

(vii)      PP shall increase the fleet size for transportation of coal along with proper road networks to avoid dust emission and include it as EMP.

 

         The proposal is deferred in above lines

12 Mar 2021
3. ADS Reply LetterAs directed, the ATR/Compliance against the observations of EAC has been prepared and enclosed herewith. It is most earnestly solicited that, our above submission may kindly be considered grant of EC to Makardhokra - I OC (Phase-I) with increase in production capacity from 2.00 MTPA to 3.50 MTPA in Land Area of 614.69 ha, located in Umrer Tehsil, Nagpur District, Maharashtra. 17 Feb 2021
4.NA

56.3.4  The EAC after deliberation observed various deficiency in filling of Form #2 on PARIVESH Portal and further sought compliance on below mentioned details:

·         Letter of Member Secretary to MoEF regarding Public Hearing proceedings is not provided or enclosed.

·         PP shall justify the baseline monitoring conducted during October, 2019 to 15th January, 2020 and then PH was conducted on 16th January, 2020.  

·         Permission of CGWA for ground water extraction is still pending since 2017.  

·         PP shall correct details submitted in Form # 2 @ Sr. No.27 regarding R & R, PP states there are 0 villages for R&R however at the end it mentions that R & R yet to start. And @Sr. No.35 (4) Approved Mine lease area is stated as 614.69 ha however approval document enclosed states that total land area is 660.02.

·         Study the impact of diversion of Shirpur Nallah and accordingly necessary permission from concerned State Water Resource Department shall be submitted.

·         Fresh/Separate baseline data for Flora & Fauna should be generated instead of using of Dinesh OC (nearby Makardhokra-I).  

·         PP shall clarify why CER is not applicable though the proposal is for expansion from 2 MTPA to 3.5 MTPA there must be additional capital investment for the project

·         Permission for diversion is required from concerned authority for Butibori-Kanwa PWD road which is passing in between proposed dip side quarry surface and external dump.   

·         PP shall carry out hydro-geological investigations as regards the quality and quantity of water. Impact of mining activity on aquifers and water table considering the project is located near the Makardhokra Reservoir shall also be studied.

·          PP shall implement separate ETP for the proposed project for HEMM deployed though their maintenance will be contractor’s responsibilities.  

·         PP shall provide necessary mitigation measures as maximum Air quality data of PM10 and PM2.5 is almost close to 100 and 60 respectively at almost all the sites

·         Mitigation measures to protect residence of Shirpur village should be proposed by PP as rehabilitation of Shirpur village is proposed in Phase – II.

·         Clarification from District Forest Officer that project does not falls under Umred Karhandla Wildlife Sanctuary, Tadoba Andhari Tiger Reserve, Pench Tiger Reserve, Navegaon Nagzira Tiger Reserve, Melghat Tiger Reserve, Bor Wildlife Sanctuary, and Tipeshwar Wildlife Sanctuary and there is no wildlife corridor (Tiger/Elephant).

·         Site visit may be conducted as early as possible by sub-committee of EAC

 

Keeping in view above points the proposal was deferred for compliance of the above points

31 Jul 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKaushik Chakraborty
DesignationG.M (MINING)/ ENVIRONMENT.
Name of Company (Applicant Name should not be given here)Western Coalfields Limited
AddressCoal Estate Civil lines, Nagpur-440001
Print