1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Makardhokra I OC mine (Phase-I) for increase in cap. from 2.0 MTY to 3.5 MTY in ML area of 614.69 ha located in Umred teh, Nagpur Dist, MH | (b)Name of the Company / Organisation | Western Coalfields Limited | (c)Registered Address | Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kaushik Chakraborty | (b)Designation (Owner/ Partner/ CEO) | G.M (MINING)/ ENVIRONMENT. | (c)Address | NIL | (d)Pin code | 440001 | (e)E-mail | gmenvironment.wcl@coalindia.in | (f)STD Code. | 712(f)Telephone No. | 2510151 | (g)Fax No. | 2510151 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/MH/CMIN/154498/2018 | (d)Master Proposal Number(Single Window) | SW/154481/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Near Shirpur Village Umred tehsil Nagpur Dist boun | (b)Pincode | 441203 | (c)Bounded Latitudes (North) | | From | | Degree | 20.84250000 | Minutes | | Second | | From | | Degree | 79.23555556 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 20.87055556 | Minutes | | Second | | From | | Degree | 79.27333333 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 55 P/1 & 55 P/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 295 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/54/2006-IA-II (M) | (c)Date of Issue of TOR | 07 Nov 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 31 May 2020 | (c)Date of Issue of EC | 20 May 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Jan 2020 | Distance of Public Hearing Venue from the Proposed Project : | 4 |
| Community Hall WCL Colony | State : | Maharashtra | District : | Nagpur | Tehsil : | Umred | Village : | near Waygaon- Ghoturli |
| 400 | land compensation, Employment, roads, Plantation, CSR etc. | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-1031/RON/2019-NGP/5783 dated 01.10.2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 31 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Production Capacity | 2.0 | 1.5 | 3.5 | Others | MTPA | Road,Rail | | (2.) | Land area | 614.69 | 0 | 614.69 | Hectares(ha) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Opencast Coal Mining | Shovel Dumper Combination | Shovel Dumper Combination | Shovel Dumper Combination | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Jan 2019 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | UAN No 24388/ CC-1901000356 | (vi)Application No. | MPCB-CONSENT-0000024388 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 266.2308 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.9709 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1.5 | (b)Existing quantity of raw material/fuel | 2.0 | (c)Total quantity of raw material/fuel | 3.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 4637 | Others | tonnes per annum | CIL approved vendors | Road | | 0 | Linkage | | Copy of Linkage | (2.) | High Speed Diesel | 10830 | Others | KL per annum | From OMCs | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Oct 2019 To 15 Jan 2020 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 13 | 11 | 13 | 80 | (2.) | Others | SPM | Micro Gram per Meter Cube | 130 | 116 | 130 | 200 | (3.) | NOx | | Micro Gram per Meter Cube | 16 | 14 | 16 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 78 | 70 | 78 | 100 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 29 | 26 | 29 | 60 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | NA | 8.4 | 7.9 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 484 | 168 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 0.62 | 0.47 | 1.0 | 1.0 | (4.) | TDS | | | mg/l | | 776 | 296 | 500 | 2000 | (5.) | TSS | | | Others | Turbidity in NTU | 2 | 1 | 1 | 5 | (6.) | Chlorides | | | mg/l | | 130 | 20 | 250 | 1000 | (7.) | Others | NA | | Others | NA | 0 | 0 | 0 | 0 | (8.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | Nitrate | mg/l | | 9.14 | 7.02 | C | (2.) | COD | | mg/l | | 16 | 14 | C | (3.) | BOD | | mg/l | | 2.4 | 1 | C | (4.) | DO | | mg/l | | 4.7 | 4.4 | C | (5.) | pH | | NA | | 7.5 | 7.3 | C | |
14.4. No. of Ambient Noise monitoring locations : 2 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.6 | 44.3 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 56.2 | 48.6 | 75 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | m mhos per cm at 20 degree | 0.63 | 0.36 | (2.) | N(Nitrogen) | Kilogram per hectare | | 285.47 | 236.87 | (3.) | P(Phosphorus) | Kilogram per hectare | | 26.56 | 20.56 | (4.) | pH | | | 6.6 | 6.17 | (5.) | K(Potassium) | Kilogram per hectare | | 146.12 | 116.59 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.80 To 12.15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.20 To 7.50 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/685/MH/MIN/2017 (Application under process) | (f)Date of Issue | 09 Jan 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine Water Discharge | 2268 | 0 | Copy of Permission Letter | Pipeline | | Others | Mine Discharge | 21-4/685/MH/MIN/2017 (Application under process) | 09 Jan 2017 | 2268 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine Dischrage | 2268 | 480 | Sedimentation Tank | Discharge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 480 | 1788 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2268 | (b)Total Discharged Water (Kilolitre per Day) | 1788 | (c)Total Reused Water (Kilolitre per Day) | 480 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | OverBurden | Others | Over burden | 56.10 | Tons | 1.50 | Others | Internal Haul Road | Others | Dumping on adjacent mine void | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 29 | 0.28 | 1.64 | 31 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 13 | 0.28 | 0.58 | 14 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 78 | 0.28 | 9.87 | 88 | 100 | (4.) | NOx | | Microgram per Meter Cube | 16 | 0.28 | 26.46 | 43 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | Not Applicable | 0 | 0 | PM10 | | Not Applicable | (2.) | Not Applicable | Not Applicable | 0 | 0 | Others | NA | Not Applicable | (3.) | Not Applicable | Not Applicable | 0 | 0 | SO2 | | Not Applicable | (4.) | Not Applicable | Not Applicable | 0 | 0 | NOx | | Not Applicable | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2209 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 589.97 | (c)Government Land (ha.) | 24.72 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 614.69 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 589.97 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Government land | 24.72 | Total (ha.) | 614.6900 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | | (2.) | Township | | 0 | | (3.) | Ash Pond | | 0 | | (4.) | Tailing Pond | | 0 | | (5.) | LandFill | | 0 | | (6.) | Water Reservoir | | 0 | | (7.) | Desalination Plant | | 0 | | (8.) | OB Dump Area | | 137.81 | External OB dump | (9.) | Built Up Area | | 15.0 | Infrastruture and road | (10.) | Green belt | | 8.0 | | (11.) | Safety Zone | | 56.24 | | (12.) | Others | Undisturbed Area | 144.68 | | (13.) | Quarry Area | | 252.96 | Total Excavation Area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Not Applicable | 0 | Not Applicable | (2.) | Critically Polluted Area | Not Applicable | 0 | Not Applicable | (3.) | WLS | Not Applicable | 0 | Not Applicable | (4.) | Wildlife Corridors | Not Applicable | 0 | Not Applicable | (5.) | ESAs | Not Applicable | 0 | Not Applicable | (6.) | Corridors | Not Applicable | 0 | Not Applicable | (7.) | ESZs | Not Applicable | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not Applicable | 0 | Nil | (2.) | Archaeological Sites | | Not Applicable | 0 | Not Applicable | (3.) | Defence Installations | | Not Applicable | 0 | Not Applicable | (4.) | Others | Not Applicable | Not Applicable | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 614.69 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | land acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Shirpur Nallah | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | Shirpur Nallah | (ii)Details of Study Conducted | Yet to be conducted | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Amb river (tributary of Wainganga River) | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 275 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 275 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 12.50 | 149.76 | 162.26 | (2.) | Percentage of Total Project Area | 2.03 | 24.36 | 26.39 | (3.) | No. of Plants | 30000 | 375650 | 405650 | (4.) | Funds Allocated | 6000000 | 75130000 | 81130000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Increase in Green Belt area | (2.) | Social | Direct employment to eligible persons preferable local persons besides creating indirect employment opportunites. Various CSR activities in adjoing villages will help in improving social status. | (3.) | Financial | The project will contribute to the Government through various taxes. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.50 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | WCL/BD/SECTT/BM-313/2019/712 | (b)Date of Approval | 06 Aug 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | WCL Board | (e)Approved Mining Lease Area | 614.69 | (f)Approved Capacity | 3.50 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 52.863 | (b)Mineable Reserves (Million Ton) | 17.16 | (c)Extractable Reserves(Million Ton) | 16.30 | (d)Percent(%) of Extraction | 95 | (e)Grade of Coal /Ore /Mineral | G-8 (GCV-4997 kCal/Kg) | (f)Stripping Ratio | 1 : 7.35 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Not applicable | (h)Average Gradient(Degree) | 1 in 9 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 5 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 6 | (c)Thickness of seams to be worked on | 4.69 | (d)Maximum Thickness of Seams (metres) | 8.85 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 614.69 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 2 | (ii)Total Area (in Hectare) | 137.81 | (iii)Height (in meter) | 90 | (iv)Quantity (in Million Cubic meter) | 68.02 | (v)No. of year back fill up | 1 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 96.90 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 15.90 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 6.08 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 6.08 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 156.06 | (b)Depth (in meter) | 140 | (c)Volume (in Million Cubic meter) | 160.0 | |
|
12. | Details of Quarry: | (a)Final Void of 156.06 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 252.96 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper | (b)Surface to Siding/Loading | trucks / tipper | (c)Transportation / Conveyor Details | Road transportation, Rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 589.97 | 0 | 589.97 | (2.) | OTHERS(Specify) | Government land | 24.72 | 0 | 24.72 | (3.) | FOREST LAND | | 0 | 0 | 0 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | WASTE LAND | | 0 | 0 | 0 | (7.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 614.69 | 0 | 614.69 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | VIRGIN AREA | | 31.76 | 0 | 112.92 | | 144.68 | (3.) | EXTERNAL OB DUMPS | | 120 | 0 | 17.81 | | 137.81 | (4.) | GREEN BELT | | 8 | 0 | 0 | | 8 | (5.) | INTERNAL OB DUMPS | | 0 | 0 | 96.9 | | 96.9 | (6.) | ROADS | | 0.5 | 0 | 1.5 | | 2 | (7.) | Other | Safety Zone | 0 | 0 | 56.24 | | 56.24 | (8.) | BUILT UP AREA (COLONY/OFFICE) | | 2 | 0 | 11 | | 13 | (9.) | EXCAVATION/QUARRY | | 0 | 156.06 | 00 | | 156.06 | |
TOTAL | 162.26 | 156.06 | 296.37 | 0 | 614.69 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 137.81 | (b)Internal Dump(in hectare) | 96.90 | (c)Quarry(in hectare) | 252.96 | (d)Safety Zone(in hectare) | 56.24 | (e)Final Void of 156.06 (hectare) at a Depth of 140 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 144.68 | (h)Total afforestation plant (in hectare) | 162.26 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2019 | 2.0 | 2.0 | 2.0 | 2.0 | 0 | (2.) | 2020 | 2.0 | 2.0 | 2.0 | 1.99 | 0 | (3.) | 2015 | 1.0 | 1.0 | 1.0 | 0.07 | 0 | (4.) | 2016 | 1.0 | 1.0 | 1.0 | 0.96 | 0 | (5.) | 2018 | 2.0 | 2.0 | 2.0 | 1.60 | 0 | (6.) | 2017 | 2.0 | 2.0 | 2.0 | 1.81 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0092 | (ii)Name of the EIA Consultant | CMPDIL | (iii)Address | Gondwana Place, Kanke road, Ranchi 834031 | (iv)Mobile No. | 6512231850 | (v)Landline No. | 0651223185 | (vi)Email Id | Gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Pointwise Action taken report / Detailed Compliance has been prepared and same enclosed for herewith for your kind perusal | 03 Apr 2021 | 2. | NA |
The EAC after detailed deliberations observed that there are various issues which required further deliberations and inputs from PP. Further one of non-compliances has been highlighted by Ministry’s Regional Office about Amb River which has been diverted, while as per EC condition the river bank was required to be strengthened through embankment. Also CSR provision, ETP augmentation, GW contamination, cost of conservation plan has not been addressed properly for the proposed project. In view of the non-compliances of earlier EC, the Committee recommends to sought clarification from Project Proponent. Further Committee proposed to issue the SCN to Consultant for submitting incomplete details. EAC desired further compliance on below mentioned observations.
(i) PP to submit the Action Taken Report on the non-compliances/partial compliances of existing EC conditions and clarification on diversion of Amb River.
(ii) PP should submit the details of Environment Management Plan regarding the commitments made during the Public Hearing. PP shall provide CSR provision with adequate effectiveness of EMP
(iii) PP to provide the clarification for ETP expansion in view of additional load due vehicle washing/servicing and justification on ETP capacity with wastewater load from all sources. Accordingly, Water Balance diagram with zero liquid discharge considering no untreated mine water discharged in river
(iv) PP needs to recheck Quality of ground water in view of public concern raised near flood area due to embankment.
(v) Detailed plan to submit for trees plantation along both the sides of the Butibori-Kanwa PWD road which is passing in between proposed dip side quarry surface and external dump with broad leaves in three years to prevent the effect of air pollution.
(vi) PP shall revise the cost of Conservation plan of schedule I species.
(vii) PP shall increase the fleet size for transportation of coal along with proper road networks to avoid dust emission and include it as EMP.
The proposal is deferred in above lines
| 12 Mar 2021 | 3. | ADS Reply Letter | As directed, the ATR/Compliance against the observations of EAC has been prepared and enclosed herewith.
It is most earnestly solicited that, our above submission may kindly be considered grant of EC to Makardhokra - I OC (Phase-I) with increase in production capacity from 2.00 MTPA to 3.50 MTPA in Land Area of 614.69 ha, located in Umrer Tehsil, Nagpur District, Maharashtra. | 17 Feb 2021 | 4. | NA | 56.3.4 The EAC after deliberation observed various deficiency in filling of Form #2 on PARIVESH Portal and further sought compliance on below mentioned details:
· Letter of Member Secretary to MoEF regarding Public Hearing proceedings is not provided or enclosed.
· PP shall justify the baseline monitoring conducted during October, 2019 to 15th January, 2020 and then PH was conducted on 16th January, 2020.
· Permission of CGWA for ground water extraction is still pending since 2017.
· PP shall correct details submitted in Form # 2 @ Sr. No.27 regarding R & R, PP states there are 0 villages for R&R however at the end it mentions that R & R yet to start. And @Sr. No.35 (4) Approved Mine lease area is stated as 614.69 ha however approval document enclosed states that total land area is 660.02.
· Study the impact of diversion of Shirpur Nallah and accordingly necessary permission from concerned State Water Resource Department shall be submitted.
· Fresh/Separate baseline data for Flora & Fauna should be generated instead of using of Dinesh OC (nearby Makardhokra-I).
· PP shall clarify why CER is not applicable though the proposal is for expansion from 2 MTPA to 3.5 MTPA there must be additional capital investment for the project
· Permission for diversion is required from concerned authority for Butibori-Kanwa PWD road which is passing in between proposed dip side quarry surface and external dump.
· PP shall carry out hydro-geological investigations as regards the quality and quantity of water. Impact of mining activity on aquifers and water table considering the project is located near the Makardhokra Reservoir shall also be studied.
· PP shall implement separate ETP for the proposed project for HEMM deployed though their maintenance will be contractor’s responsibilities.
· PP shall provide necessary mitigation measures as maximum Air quality data of PM10 and PM2.5 is almost close to 100 and 60 respectively at almost all the sites
· Mitigation measures to protect residence of Shirpur village should be proposed by PP as rehabilitation of Shirpur village is proposed in Phase – II.
· Clarification from District Forest Officer that project does not falls under Umred Karhandla Wildlife Sanctuary, Tadoba Andhari Tiger Reserve, Pench Tiger Reserve, Navegaon Nagzira Tiger Reserve, Melghat Tiger Reserve, Bor Wildlife Sanctuary, and Tipeshwar Wildlife Sanctuary and there is no wildlife corridor (Tiger/Elephant).
· Site visit may be conducted as early as possible by sub-committee of EAC
Keeping in view above points the proposal was deferred for compliance of the above points | 31 Jul 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kaushik Chakraborty | Designation | G.M (MINING)/ ENVIRONMENT. | Name of Company (Applicant Name should not be given here) | Western Coalfields Limited | Address | Coal Estate Civil lines, Nagpur-440001 |
|