Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Creative Carbon Pvt. Ltd.
(b)Name of the Company / Organisation CREATIVE CARBON P LTD
(c)Registered Address S. No. 688,689,691,698,,Village : Kanera,,Ahmedabad,Gujarat-387540
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajan Shah
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 208, Gagandeep Tower,,Nr. Paldi Char RAsta, Paldi,,Ahmedabad City,Ahmedabad,Gujarat-380006
(d)Pin code 380006
(e)E-mail creativekanera@gmail.com
(f)STD Code. 79(f)Telephone No. 26585065
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/108760/2019
(d)Master Proposal Number(Single Window) SW/153981/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No.: 688, 689, 691 & 698.
(b)Pincode 387540
(c)Bounded Latitudes (North)
From
Degree 22.810081
Minutes
Second
From
Degree 22.811819
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.610667
Minutes
Second
From
Degree 72.610706
Minutes
Second
(e)Survey of India Topo Sheet No. F43G9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 21
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshAnantapurKanekal
(2.)GujaratKhedaKheda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/211/2019-IA-II(I)
(b)Date of Apply of TOR 26 Jun 2019
(c)Date of Issue of TOR / Standard ToR 01 Aug 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Dec 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :0.0
Project site, survey no 688,689,691 and 698, Village Kanera,Tehsil and Taluka Kheda, Gujarat
State :Gujarat
District :Kheda
Tehsil :Kheda
Village :Kanera
421) About Employment of village People 2) About Development of surrounding villagesOthersAdditional Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)5 Zone Phenolic Impregnation Line2 nos
(2.)DG Set500 kVA
(3.)Laminate Cutting M/C,Rotary Cutter (Panel Saw)1 nos
(4.)Bag Filter For 4 Ton Steam Boiler1 nos
(5.)Hydraulic Press 100mt Capacity8 nos
(6.)Hydraulic Press 250mt Capacity4 nos
(7.)Hydraulic Press 350mt Capacity2 nos
(8.)Hydraulic Press 500mt Capacity1 nos
(9.)Single Girder Eot Crane3 Ton
(10.)Air Compressor -Model:2545-D-10Capacity:30.09 CFM @ 150psig Pressure
(11.)I R Refrigerated Air Dryer -Model:D144inCapacity:85 CFM (Suitable up to 65 CFM)
(12.)Bag Filter Type Dust Collector3 Nos
(13.)Solar System190 Kw
(14.)Hydraulic Press 65mt Capacity1 nos
(15.)Hydraulic Press 150mt Capacity2 nos
(16.)Leathe 4.5" Ft Anil Make1 nos
(17.)Lathe 6"1 nos
(18.)Redial Drill - 1.25"& Workshop Machinery1 nos
(19.)Drill Machine- 25mm1 nos
(20.)D.G.Set-125kvs- Kirloskar Green
(21.)Reaction Vessels : 5 Kl Capacity7 nos
(22.)Reaction Vessels : 12 Kl Capacity7 nos
(23.)Vaccum Pump5 Hp, 1 nos
(24.)Tray Drier- 128 Tray1 nos
(25.)Bag Filter For 4 Kcl Thermic Boiler1 nos
(26.)Hydraulic Press 40mt Capacity2 nos
(27.)Ribbon Blender1 nos
(28.)Air Compressor -2 Hp , 2 nos
(29.)Cooling Tower3 nos
(30.)Over Head Crane3m.T Capacity, 1 nos
(31.)Circular Saw2 nos
(32.)Hydraulic Hacksaw 18"1 nos
(33.)Amry Machine3 nos
(34.)Belt 6 Disc Grinder2 NOS
(35.)Buffing Machine2 NOS
(36.)Notch Cutter1 nos
(37.)Izod Impact Tester1 nos
(38.)Ovan For Lab1 nos
(39.)Hot Plate1 nos
(40.)Pump & Pipe Line.
(41.)Storage Tank6 nos
(42.)Steam Boiler With Chimney And Accessories6 Mt Capacity
(43.)R.O Water PlantOutput Of 2000lPH Based on 1500ppm TDS
(44.)Warping Machine (Film Applicator)2 nos
(45.)Double Head Sander Machine.8/4 Ft. 1Nos
(46.)Resin Plants Process Equipment1 nos
(47.)Welding Machine400amp, 1nos
(48.)Palveriser1 NOS
(49.)Lathe 4.5"1 nos
(50.)Cizer Lift1nos
(51.)Ball Mill2 NOS
(52.)Muffle Furnace1 nos
(53.)Dust Collector- Small 1 and Big 12 nos
(54.)Universal Testing Machine1 nos
(55.)Viscocity Cup1 nos
(56.)R.O Water Plant Having Output Of 4000lPH1 nos
(57.)Bag Filter Type Dust Collector3nos
(58.)Thermic Fluid Heater1 nosBriquette/Coal Fired Manual 15 Lac Kcl /Hr
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Melamine Formaldehyde Resin7020Tons per AnnumRoad
(2.)Phenol Formaldehyde Moulded Articles2400Tons per AnnumRoad
(3.)Epoxy Resin360Tons per AnnumRoad
(4.)Polyester Resin840Tons per AnnumRoad
(5.)Urea Formaldehyde Resin3600Tons per AnnumRoad
(6.)Phenol Formaldehyde Moulding Powder2400Tons per AnnumRoad
(7.)Phenol Formaldehyde Resin22464Tons per AnnumRoad
(8.)Phenol Urea Formaldehyde Resin3600Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.38
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.26
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 61448
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 61448
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bis-phenol A182.4Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(2.)Caustic lye16295Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(3.)coconut shell powder60Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(4.)Diethylene Glycol (DEG)124.32Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(5.)Lime12Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(6.)Magnesium oxide12Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(7.)Marble Chips24Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(8.)Methanol1347Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(9.)Naphthalene12Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(10.)Phenol17747Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(11.)Phenol Formaldehyde Moulding Powder, Coated Fabric or Coated Pulp Paper2400Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(12.)Phenol Formaldehyde Resin1944Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(13.)Pigment12Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(14.)Styrene Monomer207.6Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(15.)Wood Flour / Fibrous / Cotton Fabric Chips / NEC Chips / Graphite Powder240Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(16.)Epichlorohydrin160.8Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(17.)Formaldehyde38301Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(18.)Maleic anhydride109.2Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(19.)Melamine4282Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(20.)Mica30Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(21.)Mineral Powder18Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(22.)Mono Ethylene Glycol115.2Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(23.)Phthalic Anhydride305Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(24.)Urea3441Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
(25.)Zinc Powder12Tons per Annum25Road25 Open MarketCopy of Linkage
(26.)Hexamine24Tons per AnnumLOCAL SUPPLIERRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube85.5652.4185.31100
(2.)PM2.5Micro Gram per Meter Cube34.6419.3734.5560
(3.)SO2Micro Gram per Meter Cube12.685.1212.5580
(4.)NOxMicro Gram per Meter Cube20.18.320.0580
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.027.378.5
(2.)TSSmg/l20010
(3.)TDSmg/l148610545002000
(4.)Chloridesmg/l6751252501000
(5.)Total Hardnessmg/l362220200600
(6.)Fluoridemg/l0.810.5111.5
(7.)Heavy MetalsLeadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l244D
(2.)DOmg/l4.23.6D
(3.)pHNA8.067.48D
(4.)CODmg/l5616D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.847.175
(2.)Leq(Night)A-weighted decibels(dB(A))54.338.270
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre703412
(2.)P(Phosphorus)Percent0.080.02
(3.)K(Potassium)Milligram per Kilogram957.11104.4
(4.)pH7.686.41
(5.)N(Nitrogen)Milligram per Kilogram1260196
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater30.70.0Copy of Permission LetterPipelineOthersBorewellTransaction Ref.No. 260319000699626 Mar 201930.7
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial34.8148ETP followed By MEEOthersZLD034.81
(2.)Doemstic2.70Soak pitOthersdisposal through soak pit02.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 37.51
(b)Total Discharged Water (Kilolitre per Day) 37.51
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludge and evaporation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons25RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons25RoadAuthorized Recyclers
(3.)Process residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons25RoadCo-Processing
(4.)Discarded Containers / Bags/ linersPlastic Waste100Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.752.970.9081.66100
(2.)SO2Microgram per Meter Cube10.628.20.2110.8480
(3.)PM2.5Microgram per Meter Cube30.422.970.931.3360
(4.)NOxMicrogram per Meter Cube16.958.20.4317.3980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set(500kVA)HSD50.1OthersPM,SOx,NOxPM<150mg/Nm3,SOx<100ppm,NOx<50ppm
(2.)BOILER(6 T)COAL/LIGNITE301.22OthersPM,SOx,NOxPM<150mg/Nm3, SOx<100ppm,NOx<50ppm
(3.)Thermic Fluid HeaterCoal/ Lignite301.22OthersPM,SOx,NOxPM<150mg/Nm3,SOx<100ppm,NOx<50ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Uttar Gujarat Vij Company Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 kva
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.8903
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.8903
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 24395.32
(b)Waste/Barren Land (ha.) 801.75
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1478.74
(e)Settlements (ha.) 855.14
(f)Industrial (ha.) 1261.02
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : land with Shrubs 2623.54
    Total (ha.) 31415.5100
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.2927
(2.)Green belt0.3202
(3.)Built Up Area0.1212Utilities, Raw Material and Finished Goods Storage
(4.)OthersOther0.1562Road and Open area
Total (ha.) 0.8903
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsThol Bird Sanctuary29NONE WITHIN 10 KM
(2.)Wildlife Corridorsnone0.0NONE WITHIN 10 KM
(3.)WLSThol Bird Sanctuary29NONE WITHIN 10 KM
(4.)NPAJambughoda155NONE WITHIN 10 KM
(5.)ESAsThol Bird Sanctuary29NONE WITHIN 10 KM
(6.)CorridorsNational expressway-117NONE WITHIN 10 KM
(7.)Critically Polluted AreaGIDC, Vatva18NONE WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPolo forest150None within 10 km
(2.)Archaeological SitesAdalaj ni vav48None within 10 km
(3.)Defence InstallationsAhmedabad Cantonment20None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.89
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Goblaj Lake
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.31
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 20
(e)No. of working days 312
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.32
(b)Percentage of Total Project Area 35.94
(c)No. of Plants to be Planted 480
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalCompany will develop greenbelt in 3202 sq.m.
(2.)SocialProject benefits focus on those points which become beneficial to the surrounding area or community in terms of infrastructural development, Social development, employment and other tangible benefits due to project. Proposed project has a potential for employment of skilled, semi-skilled and unskilled employees during construction phase as well as operational phase.
(3.)FinancialThe demand for products intended to be manufacture is increasing in the country. By setting up this unit M/s. Creative Carbon will be able to meet the demand of various products locally. The project will save forex as certain products import will be reduced. This will also generate direct and indirect employment opportunity for various levels of people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc
(iii)Address Green Empire Anupushpam,Above Axis Bank,Near Yash Complex,Gotri Main Road, Vadodara, Gujarat
(iv)Mobile No. 9426721681
(v)Landline No. 9824272844
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajan Shah
DesignationDirector
Name of Company (Applicant Name should not be given here)CREATIVE CARBON P LTD
AddressS. No. 688,689,691,698,