1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Creative Carbon Pvt. Ltd. | (b)Name of the Company / Organisation | CREATIVE CARBON P LTD | (c)Registered Address | S. No. 688,689,691,698,,Village : Kanera,,Ahmedabad,Gujarat-387540 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajan Shah | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | 208, Gagandeep Tower,,Nr. Paldi Char RAsta, Paldi,,Ahmedabad City,Ahmedabad,Gujarat-380006 | (d)Pin code | 380006 | (e)E-mail | creativekanera@gmail.com | (f)STD Code. | 79(f)Telephone No. | 26585065 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/108760/2019 | (d)Master Proposal Number(Single Window) | SW/153981/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No.: 688, 689, 691 & 698. | (b)Pincode | 387540 | (c)Bounded Latitudes (North) | | From | | Degree | 22.810081 | Minutes | | Second | | From | | Degree | 22.811819 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.610667 | Minutes | | Second | | From | | Degree | 72.610706 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43G9 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 21 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 25 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | Anantapur | Kanekal | | (2.) | Gujarat | Kheda | Kheda | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/211/2019-IA-II(I) | (b)Date of Apply of TOR | 26 Jun 2019 | (c)Date of Issue of TOR / Standard ToR | 01 Aug 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 10 Jan 2020 | Distance of Public Hearing Venue from the Proposed Project : | 0.0 |
| Project site, survey no 688,689,691 and 698, Village Kanera,Tehsil and Taluka Kheda, Gujarat | State : | Gujarat | District : | Kheda | Tehsil : | Kheda | Village : | Kanera |
| 42 | 1) About Employment of village People
2) About Development of surrounding villages | Others | Additional Collector and Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 5 Zone Phenolic Impregnation Line | 2 nos | | (2.) | DG Set | 500 kVA | | (3.) | Laminate Cutting M/C,Rotary Cutter (Panel Saw) | 1 nos | | (4.) | Bag Filter For 4 Ton Steam Boiler | 1 nos | | (5.) | Hydraulic Press 100mt Capacity | 8 nos | | (6.) | Hydraulic Press 250mt Capacity | 4 nos | | (7.) | Hydraulic Press 350mt Capacity | 2 nos | | (8.) | Hydraulic Press 500mt Capacity | 1 nos | | (9.) | Single Girder Eot Crane | 3 Ton | | (10.) | Air Compressor -Model:2545-D-10 | Capacity:30.09 CFM @ 150psig Pressure | | (11.) | I R Refrigerated Air Dryer -Model:D144in | Capacity:85 CFM (Suitable up to 65 CFM) | | (12.) | Bag Filter Type Dust Collector | 3 Nos | | (13.) | Solar System | 190 Kw | | (14.) | Hydraulic Press 65mt Capacity | 1 nos | | (15.) | Hydraulic Press 150mt Capacity | 2 nos | | (16.) | Leathe 4.5" Ft Anil Make | 1 nos | | (17.) | Lathe 6" | 1 nos | | (18.) | Redial Drill - 1.25"& Workshop Machinery | 1 nos | | (19.) | Drill Machine- 25mm | 1 nos | | (20.) | D.G.Set- | 125kvs- Kirloskar Green | | (21.) | Reaction Vessels : 5 Kl Capacity | 7 nos | | (22.) | Reaction Vessels : 12 Kl Capacity | 7 nos | | (23.) | Vaccum Pump | 5 Hp, 1 nos | | (24.) | Tray Drier- 128 Tray | 1 nos | | (25.) | Bag Filter For 4 Kcl Thermic Boiler | 1 nos | | (26.) | Hydraulic Press 40mt Capacity | 2 nos | | (27.) | Ribbon Blender | 1 nos | | (28.) | Air Compressor - | 2 Hp , 2 nos | | (29.) | Cooling Tower | 3 nos | | (30.) | Over Head Crane | 3m.T Capacity, 1 nos | | (31.) | Circular Saw | 2 nos | | (32.) | Hydraulic Hacksaw 18" | 1 nos | | (33.) | Amry Machine | 3 nos | | (34.) | Belt 6 Disc Grinder | 2 NOS | | (35.) | Buffing Machine | 2 NOS | | (36.) | Notch Cutter | 1 nos | | (37.) | Izod Impact Tester | 1 nos | | (38.) | Ovan For Lab | 1 nos | | (39.) | Hot Plate | 1 nos | | (40.) | Pump & Pipe Line | . | | (41.) | Storage Tank | 6 nos | | (42.) | Steam Boiler With Chimney And Accessories | 6 Mt Capacity | | (43.) | R.O Water Plant | Output Of 2000lPH Based on 1500ppm TDS | | (44.) | Warping Machine (Film Applicator) | 2 nos | | (45.) | Double Head Sander Machine. | 8/4 Ft. 1Nos | | (46.) | Resin Plants Process Equipment | 1 nos | | (47.) | Welding Machine | 400amp, 1nos | | (48.) | Palveriser | 1 NOS | | (49.) | Lathe 4.5" | 1 nos | | (50.) | Cizer Lift | 1nos | | (51.) | Ball Mill | 2 NOS | | (52.) | Muffle Furnace | 1 nos | | (53.) | Dust Collector- Small 1 and Big 1 | 2 nos | | (54.) | Universal Testing Machine | 1 nos | | (55.) | Viscocity Cup | 1 nos | | (56.) | R.O Water Plant Having Output Of 4000lPH | 1 nos | | (57.) | Bag Filter Type Dust Collector | 3nos | | (58.) | Thermic Fluid Heater | 1 nos | Briquette/Coal Fired Manual 15 Lac Kcl /Hr | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Melamine Formaldehyde Resin | 7020 | Tons per Annum | | Road | | (2.) | Phenol Formaldehyde Moulded Articles | 2400 | Tons per Annum | | Road | | (3.) | Epoxy Resin | 360 | Tons per Annum | | Road | | (4.) | Polyester Resin | 840 | Tons per Annum | | Road | | (5.) | Urea Formaldehyde Resin | 3600 | Tons per Annum | | Road | | (6.) | Phenol Formaldehyde Moulding Powder | 2400 | Tons per Annum | | Road | | (7.) | Phenol Formaldehyde Resin | 22464 | Tons per Annum | | Road | | (8.) | Phenol Urea Formaldehyde Resin | 3600 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.38 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.26 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 61448 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 61448 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Bis-phenol A | 182.4 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (2.) | Caustic lye | 16295 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (3.) | coconut shell powder | 60 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (4.) | Diethylene Glycol (DEG) | 124.32 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (5.) | Lime | 12 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (6.) | Magnesium oxide | 12 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (7.) | Marble Chips | 24 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (8.) | Methanol | 1347 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (9.) | Naphthalene | 12 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (10.) | Phenol | 17747 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (11.) | Phenol Formaldehyde Moulding Powder, Coated Fabric or Coated Pulp Paper | 2400 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (12.) | Phenol Formaldehyde Resin | 1944 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (13.) | Pigment | 12 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (14.) | Styrene Monomer | 207.6 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (15.) | Wood Flour / Fibrous / Cotton Fabric Chips / NEC Chips / Graphite Powder | 240 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (16.) | Epichlorohydrin | 160.8 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (17.) | Formaldehyde | 38301 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (18.) | Maleic anhydride | 109.2 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (19.) | Melamine | 4282 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (20.) | Mica | 30 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (21.) | Mineral Powder | 18 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (22.) | Mono Ethylene Glycol | 115.2 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (23.) | Phthalic Anhydride | 305 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (24.) | Urea | 3441 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | (25.) | Zinc Powder | 12 | Tons per Annum | | 25 | Road | | 25 | Open Market | | Copy of Linkage | (26.) | Hexamine | 24 | Tons per Annum | | LOCAL SUPPLIER | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 85.56 | 52.41 | 85.31 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 34.64 | 19.37 | 34.55 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 12.68 | 5.12 | 12.55 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 20.1 | 8.3 | 20.05 | 80 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.02 | 7.3 | 7 | 8.5 | (2.) | TSS | | | mg/l | | 2 | 0 | 0 | 10 | (3.) | TDS | | | mg/l | | 1486 | 1054 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 675 | 125 | 250 | 1000 | (5.) | Total Hardness | | | mg/l | | 362 | 220 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 0.81 | 0.51 | 1 | 1.5 | (7.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 24 | 4 | D | (2.) | DO | | mg/l | | 4.2 | 3.6 | D | (3.) | pH | | NA | | 8.06 | 7.48 | D | (4.) | COD | | mg/l | | 56 | 16 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.8 | 47.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.3 | 38.2 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 703 | 412 | (2.) | P(Phosphorus) | Percent | | 0.08 | 0.02 | (3.) | K(Potassium) | Milligram per Kilogram | | 957.11 | 104.4 | (4.) | pH | | | 7.68 | 6.41 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 1260 | 196 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 30.7 | 0.0 | Copy of Permission Letter | Pipeline | | Others | Borewell | Transaction Ref.No. 2603190006996 | 26 Mar 2019 | 30.7 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 34.81 | 48 | ETP followed By MEE | Others | ZLD | 0 | 34.81 | (2.) | Doemstic | 2.7 | 0 | Soak pit | Others | disposal through soak pit | 0 | 2.7 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 37.51 | (b)Total Discharged Water (Kilolitre per Day) | 37.51 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP sludge and evaporation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 25 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 25 | Road | | Authorized Recyclers | | (3.) | Process residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 25 | Road | | Co-Processing | | (4.) | Discarded Containers / Bags/ liners | Plastic Waste | | 100 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 80.75 | 2.97 | 0.90 | 81.66 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 10.62 | 8.2 | 0.21 | 10.84 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 30.42 | 2.97 | 0.9 | 31.33 | 60 | (4.) | NOx | | Microgram per Meter Cube | 16.95 | 8.2 | 0.43 | 17.39 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set(500kVA) | HSD | 5 | 0.1 | Others | PM,SOx,NOx | PM<150mg/Nm3,SOx<100ppm,NOx<50ppm | (2.) | BOILER(6 T) | COAL/LIGNITE | 30 | 1.22 | Others | PM,SOx,NOx | PM<150mg/Nm3, SOx<100ppm,NOx<50ppm | (3.) | Thermic Fluid Heater | Coal/ Lignite | 30 | 1.22 | Others | PM,SOx,NOx | PM<150mg/Nm3,SOx<100ppm,NOx<50ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | Uttar Gujarat Vij Company Ltd | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 kva | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.8903 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.8903 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 24395.32 | (b)Waste/Barren Land (ha.) | 801.75 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1478.74 | (e)Settlements (ha.) | 855.14 | (f)Industrial (ha.) | 1261.02 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : land with Shrubs | 2623.54 | Total (ha.) | 31415.5100 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.2927 | | (2.) | Green belt | | 0.3202 | | (3.) | Built Up Area | | 0.1212 | Utilities, Raw Material and Finished Goods Storage | (4.) | Others | Other | 0.1562 | Road and Open area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | Thol Bird Sanctuary | 29 | NONE WITHIN 10 KM | (2.) | Wildlife Corridors | none | 0.0 | NONE WITHIN 10 KM | (3.) | WLS | Thol Bird Sanctuary | 29 | NONE WITHIN 10 KM | (4.) | NPA | Jambughoda | 155 | NONE WITHIN 10 KM | (5.) | ESAs | Thol Bird Sanctuary | 29 | NONE WITHIN 10 KM | (6.) | Corridors | National expressway-1 | 17 | NONE WITHIN 10 KM | (7.) | Critically Polluted Area | GIDC, Vatva | 18 | NONE WITHIN 10 KM | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Polo forest | 150 | None within 10 km | (2.) | Archaeological Sites | | Adalaj ni vav | 48 | None within 10 km | (3.) | Defence Installations | | Ahmedabad Cantonment | 20 | None within 10 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.89 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Goblaj Lake | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1.31 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 30 | (c)Temporary Employment- During Construction | 10 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 312 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.32 | (b)Percentage of Total Project Area | 35.94 | (c)No. of Plants to be Planted | 480 | (d)Funds Allocated for Plantation | 500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Company will develop greenbelt in 3202 sq.m. | (2.) | Social | Project benefits focus on those points which become beneficial to the surrounding area or community in terms of infrastructural development, Social development, employment and other tangible benefits due to project. Proposed project has a potential for employment of skilled, semi-skilled and unskilled employees during construction phase as well as operational phase. | (3.) | Financial | The demand for products intended to be manufacture is increasing in the country. By setting up this unit M/s. Creative Carbon will be able to meet the demand of various products locally. The project will save forex as certain products import will be reduced. This will also generate direct and indirect employment opportunity for various levels of people. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0029 | (ii)Name of the EIA Consultant | Green Circle Inc | (iii)Address | Green Empire Anupushpam,Above Axis Bank,Near Yash Complex,Gotri Main Road, Vadodara, Gujarat | (iv)Mobile No. | 9426721681 | (v)Landline No. | 9824272844 | (vi)Email Id | info@greencircleinc.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 04 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rajan Shah | Designation | Director | Name of Company (Applicant Name should not be given here) | CREATIVE CARBON P LTD | Address | S. No. 688,689,691,698, |
|