Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Dell Laminate
(b)Name of the Company / Organisation M/S. DELL LAMINATE
(c)Registered Address Survey no. 22 , plot no.1,B/h. Pentagon Forgings,National Highway 27 (8B), Tal. Gondal,Dist. Rajkot,,Rajkot,Gujarat-360311
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhavinkumar Gandubhai Manvar
(b)Designation (Owner/ Partner/ CEO) Finance
(c)Address Survey Mo.22, plot no 1 B/H pentagon forgings, National Highway 27 , Tal. Gondal , Dist. Rajkot.,,Kotda Sangani,Rajkot,Gujarat-360311
(d)Pin code 360311
(e)E-mail delllaminate2019@gmail.com
(f)STD Code. 281(f)Telephone No. 2233
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/92387/2019
(d)Master Proposal Number(Single Window) SW/153800/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no. 22 , plot no.1
(b)Pincode 360311
(c)Bounded Latitudes (North)
From
Degree 22.066950
Minutes
Second
From
Degree 22.067472
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.773703
Minutes
Second
From
Degree 70.774258
Minutes
Second
(e)Survey of India Topo Sheet No. F42K16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 132
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratRajkotKotda Sangani
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/38/2019-IA-II(I)
(b)Date of Apply of TOR 28 Jan 2019
(c)Date of Issue of TOR / Standard ToR 05 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :1.5
Hadamtala Industrial Association Hall Hadamtala Industrial Association Survey No 177 P18 Plot No 01 Rajkot Gondal NH 8B Bharudi Chowkdi Near Toll Plaza Opp 66 KV Power Station Ta Gondal Dist Rajkot 36
State :Gujarat
District :Rajkot
Tehsil :Gondal
Village :Bharudi
40Issues raised were related to Wastewater generation and its management, educational support and scholarships, contribution of unit to the development of nearby villagesOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Storage Tanks3 Tonne4
(2.)Hydraulic Press1 Tonne1
(3.)DryerNA3
(4.)Reactors3 Tonne1
(5.)Reactors1 Tonne1
(6.)Reaction Vessels10 Tonne3
(7.)Hydraulic Press1 Tonne1
(8.)Boiler3 Tonne1
(9.)Reactors5 Tonnes1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea Formaldehyde Resin2100Tons per AnnumRoad
(2.)Cardanol Phenol Formaldehyde Resin900Tons per AnnumRoad
(3.)Melamine Formaldehyde Resin360Tons per AnnumRoad
(4.)Phenol Formaldehyde Resin900Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 May 2020
(iv)Valid Upto 30 May 2020
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.9547
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.065
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0238
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.048
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4351.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4351.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cardanol87Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
(2.)Phenol783Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
(3.)Caustic Soda22.5Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
(4.)Formaldehyde (37%)2464.5Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
(5.)Acetic acid10.5Tons per AnnumLocal /Open MarketRoad30 Open MarketCopy of Linkage
(6.)Urea840Tons per AnnumLocal /Open MarketRoad30 Open MarketCopy of Linkage
(7.)Melamine144Tons per AnnumOpen MarketRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.522.1639.860
(2.)NOxMicro Gram per Meter Cube19.810.0019.480
(3.)SO2Micro Gram per Meter Cube10.45.7910.280
(4.)PM10Micro Gram per Meter Cube94.151.4992.6100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.397.147.08.5
(2.)TSSmg/l10.11010
(3.)TDSmg/l10457605002000
(4.)Total Hardnessmg/l446157100600
(5.)Fluoridemg/l0.470.1311.5
(6.)Chloridesmg/l3472152501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l4016D
(2.)DOmg/l75D
(3.)pHNA7.957.19D
(4.)BODmg/l105D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.346.1Industrial zone 75, silence zone 50
(2.)Leq(Night)A-weighted decibels(dB(A))64.237.9Industrial zone 70, silence zone 40
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram130105
(2.)Electric ConductivityMillisiemens per Centimetre0.840.48
(3.)pH7.807.36
(4.)P(Phosphorus)Milligram per Kilogram6.82.5
(5.)K(Potassium)Milligram per Kilogram67.148.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater200.00Copy of Permission LetterPipelineOthersSubmersible Pump21-4/5501/GJ/IND/201923 Nov 201925
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial5.8010ETP followed by MEEReuse within the Plant & Recycling,OthersReused for gardening2.53.30
(2.)Domestic2.504Septic tank followed by Soak pitOthersSeptic tank followed by Soak pit02.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8.3
(b)Total Discharged Water (Kilolitre per Day) 5.8
(c)Total Reused Water (Kilolitre per Day) 2.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP Sludge/ Evaporation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Kilolitre100RoadCo-Processing
(3.)Discarded Containers/ BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons100RoadAuthorized Recyclers
(4.)Edge Cutting wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube8.703.300.258.9680
(2.)NOxMicrogram per Meter Cube16.703.300.4217.1380
(3.)PM10Microgram per Meter Cube79.903.301.0480.95100
(4.)PM2.5Microgram per Meter Cube40.53.301.0441.5560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerWhite coal, Briqquetes, Agro waste300.5OthersPM , SO2, NOxPM<150mg/Nm3, SO2<100ppm, NOx <50 ppm
(2.)DG setHSD, LDO60.2OthersPM , SO2, NOxPM<150 mg/Nm3, SO2<100 ppm, NOx<50 ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source PGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 Nos of DG Set with capacity of 62.5 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.108403
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.10840
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22293.11
(b)Waste/Barren Land (ha.) 3143.1
(c)Grazing/ Community Land (ha.) 3948.83
(d)Surface Water Bodies (ha.) 526.34
(e)Settlements (ha.) 594.37
(f)Industrial (ha.) 906.92
(g)Forest (ha.) 0.00
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31412.6700
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.023672
(2.)Green belt0.0358
(3.)Built Up Area0.003875
(4.)OthersParking area, Open area0.045056
Total (ha.) 0.108403
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVatva251Not within 10 km radius from project site
(2.)Wildlife CorridorsNA0NA
(3.)ESZsRampara Wildlife Sanctuary80Not within 10 km radius from project site
(4.)WLSRampara Wildlife Sanctuary80Not within 10 km radius from project site
(5.)CorridorsNA0NA
(6.)ESAsHingolgadh Sanctuary80Not within 10 km radius from project site
(7.)NPAHingolgadh Sanctuary80Not within 10 km radius from project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestHingolgadh80Not within 10 km radius from project site
(2.)Archaeological SitesNaulakha Palace14Not within 10 km radius from project site
(3.)Defence InstallationsNA0.00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.10
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Near Lunivav
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 4
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 9
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.03
(b)Percentage of Total Project Area 27.68
(c)No. of Plants to be Planted 59
(d)Funds Allocated for Plantation 30000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFrom Proposed Project there will be Improvement in Physical & Social Infrastructure. Trade and Employment Potential will also increase. The CSR activities by the company can be considerably beneficial for the health, education, upliftment of poor people, welfare of women & labors, assistance to the disabled people etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc.
(iii)Address Green Empire (Anupushpam), Beside Canara Bank, Nr. Yash Complex, Above Axis Bank, Gotri Main Road, VADODARA – 390 021, (Gujarat), India
(iv)Mobile No. 9725701594
(v)Landline No. 0265237126
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhavinkumar Gandubhai Manvar
DesignationFinance
Name of Company (Applicant Name should not be given here)M/S. DELL LAMINATE
AddressSurvey no. 22 , plot no.1,B/h. Pentagon Forgings,National Highway 27 (8B), Tal. Gondal,Dist. Rajkot
Print