Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mobile Bauxite Beneficiation project in Kujam II Bauxite mine within lease hold area of Hindalco Industries Limited (HIL). Chirodih & Bishunpur, Gumla, Jharkhand
(b)Name of the Company / Organisation HINDALCO INDUSTRIES LTD JHARKHAND
(c)Registered Address MINES DIVISION, COURT ROAD,,LOHARDAGA, JHARKHAND,Lohardaga,Jharkhand-835302
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BASUDEV GANGOPADHYAY
(b)Designation (Owner/ Partner/ CEO) GENERALMANAGER
(c)Address MINES DIVISION, COURT ROAD,LOHARDAGA, JHARKHAND,Lohardaga,Lohardaga,Jharkhand-835302
(d)Pin code 835302
(e)E-mail basudev1965@gmail.com
(f)STD Code. 6526(f)Telephone No. 224112
(g)Fax No. 224015
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
2(b) Mineral beneficiation
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/JH/MIN/153859/2020
(d)Master Proposal Number(Single Window) SW/153858/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 231,233,234,235,236,237,239,240 etc of Kujam Villa
(b)Pincode 835302
(c)Bounded Latitudes (North)
From
Degree 231758.26
Minutes
Second
From
Degree 231911.21
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 841718.834
Minutes
Second
From
Degree 841814.47
Minutes
Second
(e)Survey of India Topo Sheet No. 73A/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1064
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. HIL/LHD/ENV/MOEF&CC/KUJAM-II/564
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 11 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bauxite/Mining(0.3 MTPA/157.38))3000000300000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Mining3 Lakh TPA200 TPH Mobile Bauxite Beneficiation project3 Lakh TPA with Mobile BeneficiationModernization project within Kujam II Bauxite mine lease hold area
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 22 Jan 2016
(iv)Valid Upto 30 Dec 2020
(v)File No. Ref B-244
(vi)Application No. 08.09.2015
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.3239
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.599
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bauxite Ore300000Tons per AnnumMine for captive consumptionRoad,Rail0 OthersCaptive MineCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 37.98 To 38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 37 To 39
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersRainwater Harvesting1901Copy of Permission LetterPipelineOthersPipelineCGWMER/CGWA/NOC/2019-6810 Jan 20209.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process00NilOthersNo Wastewater is generated00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bauxite ResidueOthersProcess waste79500Tons0RoadOthersWillbe backfilled within the lease area
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube95.91.40.6697.0100
(2.)PM2.5Microgram per Meter Cube47.31.40.0947.460
(3.)SO2Microgram per Meter Cube8.21.40.18.380
(4.)NOxMicrogram per Meter Cube8.11.40.28.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NilNil00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source Solar Power
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000 KVA
(e)Stack Height (in m) 14
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 157.38
    Total Land (ha.) 157.38
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 140.10
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Within ML Area 17.28
    Total (ha.) 157.3800
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant5New Mobile Beneficiation Unit within the ML Area
Total (ha.) 5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0Not Applicable
(2.)ESAsNil0Not Applicable
(3.)ESZsNil0Not Applicable
(4.)Wildlife CorridorsNil0Not Applicable
(5.)Critically Polluted AreaNil0Not Applicable
(6.)CorridorsNil0Not Applicable
(7.)NPANil0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDeoragani PF0.2Not Applicable
(2.)Archaeological SitesNil0Not Applicable
(3.)Defence InstallationsNil0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land required for this Mobile Beneficiation Unit i
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Rainwater Harvesting Ponds
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dhardhari Nadi/River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 7
(b)Permanent Employment-During Operation 8
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 15
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants38163825046413
(2.)Total Area of Green Belt10.973.3014.27
(3.)Funds Allocated13.53.016.5
(4.)Percentage of Total Project Area423880
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)BauxiteMajor
2.
Mine Capacity in ROM (Run of Mine) 300000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. RAN/GML/BX/MP-24/2018-19
(b)Date of Approval 18 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 157.38
(f)Approved Capacity 300000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1.74
(b)Mineable Reserves (Million Ton) 1.43
(c)Extractable Reserves(Million Ton) 1.0
(d)Percent(%) of Extraction 70
(e)Grade of Coal /Ore /Mineral Al2O3-41.6 %
(f)Stripping Ratio 2.33 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Beneficiation Plant
(c)Capacity 200
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1200 Crusher within within the Beneficiation unit
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 157.38
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 19 Aug 2005
(iii)Validity of LOI 1
(iv)Reference No. of LOI 3BMII-2/97/589/M/Ranchi Dated 19.08.2005
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 157.38
(iii)Validity of the lease deed From : 23 Mar 2005 To : 24 Mar 2056
(iv)Date of Execution of Mining Lese 23 Mar 2005
(v)Reference Number IN-JH05089578126626P
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Amendment Done as per MMDR Act
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.144
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.144
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 2.37 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface In-pit truck transporation
(b)Surface to Siding/Loading Truck
(c)Transportation / Conveyor Details Truck Transportation
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES000
(2.)SETTLEMENTS000
(3.)AGRICULTURE LAND140.100140.1
(4.)FOREST LAND000
(5.)WASTE LAND17.28017.28
(6.)GRAZING LAND000
TOTAL157.380157.38
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)BUILT UP AREA (COLONY/OFFICE)000.10.1
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS0000
(4.)VIRGIN AREA0000
(5.)ROADS001.581.58
(6.)EXTERNAL OB DUMPS0000
(7.)OtherUnused0027.4227.42
(8.)EXCAVATION/QUARRY7.882.37111.64121.89
(9.)GREEN BELT6.39006.39
TOTAL14.272.37140.740157.38
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 121.89
(d)Safety Zone(in hectare) 6.39
(e)Final Void of 0 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 1.68
(h)Total afforestation plant (in hectare) 14.27
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201015000015000087104772530
(2.)20111500001500001038961499880
(3.)20131500001500002143431495420
(4.)20141500001500003020161497900
(5.)20151500001500002939271496850
(6.)20163000003000002930992330250
(7.)20183000003000002988042914580
(8.)20121500001500001116481490800
(9.)20173000003000002956342948300
(10.)20193000003000002994462609950
(11.)2020300000300000299293803950
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 088
(ii)Name of the EIA Consultant Vimta Labs Limited
(iii)Address 142, IDA, Cherlapally, Hyderabad -
(iv)Mobile No. 9000711309
(v)Landline No. 4027264141
(vi)Email Id janardhan@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 19 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

ADS

02 Aug 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBASUDEV GANGOPADHYAY
DesignationGENERALMANAGER
Name of Company (Applicant Name should not be given here)HINDALCO INDUSTRIES LTD JHARKHAND
AddressMINES DIVISION, COURT ROAD,