Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed integrated office complex’ for Central Board of Secondary Education at Sector 23 Dwarka, New Delhi -110075
(b)Name of the Company / Organisation CENTRAL BOARD OF SECONDARY EDUCATION
(c)Registered Address Sector 23, Dwarka,,South West,Delhi-110075
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant VPattabhi Raman
(b)Designation (Owner/ Partner/ CEO) Executive Engineer
(c)Address Central board of Secondary Education, Shiksha Kendra - 2, Community Centre, Preet Vihar,,Preet Vihar,East,Delhi-110092
(d)Pin code 110092
(e)E-mail rahultyagicbse@gmail.com
(f)STD Code. 11(f)Telephone No. 22509256
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/NCP/153857/2020
(d)Master Proposal Number(Single Window) SW/153846/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Integrated office complex at Phase-1, Sector 23, D
(b)Pincode 110075
(c)Bounded Latitudes (North)
From
Degree 77.056030
Minutes
Second
From
Degree 77.057127
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 28.564334
Minutes
Second
From
Degree 28.564885
Minutes
Second
(e)Survey of India Topo Sheet No. H43X2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 213.5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.7
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project falls under 8(a) category of Building & Co
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)N/AN/A
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)N/A0OthersN/AOthersN/A
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 220
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.18
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.3
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)AAC blocks8500Otherscubic meterLocal MarketRoad50 Open MarketCopy of Linkage
(2.)Concrete30700Otherscubic meterLocal MarketRoad50 Open MarketCopy of Linkage
(3.)Steel1734016OthersKGLocal MarketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 24 Feb 2020 To 25 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube34.82832.880
(2.)SO2Micro Gram per Meter Cube8.67.78.480
(3.)PM10Micro Gram per Meter Cube291132268100
(4.)PM2.5Micro Gram per Meter Cube1986118760
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersN/A7.87.878.5
(2.)TDSmg/l478247825002000
(3.)Heavy MetalsChromiummg/l0.010.010.050.05
(4.)TSSmg/l0011
(5.)Fluoridemg/l0.10.111.5
(6.)Chloridesmg/l174317432501000
(7.)Heavy MetalsLeadmg/l0.010.010.050.05
(8.)Heavy MetalsCadmiummg/l000.010.01
(9.)Total Hardnessmg/l21522152300600
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l3.83.8E
(2.)CODmg/l542542E
(3.)pHNA8.28.2E
(4.)BODmg/l257257E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.560.465
(2.)Leq(Night)A-weighted decibels(dB(A))56.84855
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµmhos/cm187187
(2.)pHOthersN/A7.77.7
(3.)P(Phosphorus)Milligram per Kilogram12.212.2
(4.)N(Nitrogen)Percent0.030.03
(5.)K(Potassium)Milligram per Kilogram8484
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 21.68 To 23.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20.48 To 21.4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board10.50.5Copy of Permission LetterPipelineOthersPiped012345601 May 202020
(2.)OthersOnsite STP recycled water18.80.5Copy of Permission LetterPipelineOthersPiped012345601 May 202029
(3.)OthersArea Common STP9.55Copy of Permission LettermodeOtherspipedOthersDelivery truckN/A01 May 202020
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Sewage19.830Sewage Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant19.8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 19.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 19.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BiodegradabaleMunicipal Solid Waste25.4Tons0.1OthersTrolleysOthersOrganic Waste Converter
(2.)E-WasteE Waste0.26Tons0.1RoadAuthorized Recyclers
(3.)STP SludgeOthersSTP Sludge0.4Tons0.1OthersTrolleysOthersSite used
(4.)DG waste oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre0.1RoadAuthorized Recyclers
(5.)Municipal Solid WasteOthersRecyclable12.5Tons0.1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube2090.95214.1100
(2.)PM2.5Microgram per Meter Cube104.30.93107.560
(3.)SO2Microgram per Meter Cube8.270.90.28.580
(4.)NOxMicrogram per Meter Cube31.20.90.531.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2*1010HSD480.3NOx0.2
(2.)1*750HSD460.2NOx0.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2600
(b)Source BSES
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 nos. X 1010KVA & 1 no. X 750KVA
(e)Stack Height (in m) 46
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 1.2
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Land use for offices 1.2
    Total (ha.) 1.2000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot Area1.2
Total (ha.) 1.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSCentral Ridge Reserve Forest11.2North East Direction
(2.)NPAIndira Gandhi International Airport2.1North East Direction
(3.)Critically Polluted AreaN/A0-
(4.)ESAsN/A0-
(5.)ESZsPusa Hill forest11.2North East Direction
(6.)CorridorsN/A0-
(7.)Wildlife CorridorsN/A0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAravalli Bio diversity Park7.2South East Direction
(2.)Defence InstallationsDelhi Cantonment7.2North East Direction
(3.)Archaeological SitesQutub Minar13.5South East Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 7
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 260
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.29
(b)Percentage of Total Project Area 24.17
(c)No. of Plants to be Planted 162
(d)Funds Allocated for Plantation 3000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCBSE develop individuals through co-scholastic school based evaluation. New office building will be helpful in making innovations in teaching-learning methodologies by devising students friendly and students centered paradigms. It will create reforms in examinations and evaluation practices. It will make policies for quality knowledge for the students to ensure overall physical and mental growth. New office will provide students with the skills to compete in increasingly global workplaces. CBSE
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 41.2
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 12000
(e)Total built up area (sqm) 56396.72
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 4
(d)Capacity 150
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 688
5.
Energy Saving Measures:
(a)Source/Mode Solar Heater, Solar Panel, Solar Lights, LED, VFD,
(b)Percentage 15
(c)Quantity 320
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area N/A
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0991
(ii)Name of the EIA Consultant Ambiental Global Private Limited
(iii)Address Plot no.16, 2nd Floor, Sector -4, Vaishali, Ghaziabad, Uttar Pradesh-201010
(iv)Mobile No. 9871210921
(v)Landline No. 22509256
(vi)Email Id cbse.dwarkaoffice@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 17 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease address following deficiencies found in your application No. IA/DL/NCP/153857/2020, Dated 26th May, 2020: I. Copy of Form1-A is not available. II. Form-1 uploaded on the portal is not signed. III. Inconsistencies in data given in FORM 1/1A & Conceptual Plan and the data provided in FORM-2 e.g. percentage of green area, unit of Distance of Nearest HFL from the project boundary within the study area; unit of Maximum Elevation Above Means Sea Level (AMSL), incomplete Raw Material / Fuel Profile, etc. You may like to submit the revised Application after addressing the above deficiencies. 05 Jun 2020
2.NAThe correction have been made as per the instruction received 12 Jun 2020
3.NAThis has reference to your reply dated 12.06.2020 to the MoEFCC’ s EDS dated 05.06.2020 regarding your proposal/application No. IA/DL/NCP/153857/2020, Dated 26th May, 2020. Your reply dated 12.06.2020 has since been examined. It is observed that discrepancies highlighted in the EDS dated 05.06.2020 by the Ministry have not been addressed in their totality. The details are as under: I. The PP was requested to provide signed copy of Application-FORM-1. However, signed Application- Form-1 has not been submitted along with your reply dated 12.06.2020. Please provide the same. II. PP was also requested to remove inconsistencies in data given in FORM-1 & Conceptual Plan and the data provided in FORM-2 e.g. percentage of green area, unit of Distance of Nearest HFL from the project boundary within the study area; unit of Maximum Elevation Above Means Sea Level (AMSL), incomplete Raw Material / Fuel Profile, etc. It is once again requested to edit relevant fields of Application- Form 2 filled by you in the portal. III. It was requested to submit Application- FORM-1A. The same has been received along with reply dated 12.06.2020. On perusal of the FORM-1A, it is noted that at SI No 10 of Form-1A, provides, “Environment Management Plan” is separately attached”. However, no attachment pertaining to Environment Management Plan could be found along with reply dated 12.06.2020. Please upload/provide copy of EMP. You may like to submit the revised Application after addressing the above deficiencies. 12 Jun 2020
4.NAThe correction have been made as per the instruction received 14 Jun 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVPattabhi Raman
DesignationExecutive Engineer
Name of Company (Applicant Name should not be given here)CENTRAL BOARD OF SECONDARY EDUCATION
AddressSector 23, Dwarka