1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of distillery unit from 60 KLPD to 150 KLPD & sugar unit from 7500 TCD to 12000 TCD by Shiri Ambalika Sugar Pvt. Ltd. at Ambika nagar , A/P Jagdamba Factory, Taluka Karjat, District Ahmednag | (b)Name of the Company / Organisation | M/s. Shri Ambalika Sugar Pvt. Ltd. | (c)Registered Address | A/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar,A/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar,Ludhiana,Dadra and Nagar Haveli-414403 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Jungle Nivruti Wagh | (b)Designation (Owner/ Partner/ CEO) | Executive Director | (c)Address | NIL | (d)Pin code | 414403 | (e)E-mail | mmambalika0101@gmail.com | (f)STD Code. | 0(f)Telephone No. | 255401 | (g)Fax No. | 255400 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/153652/2020 | (d)Master Proposal Number(Single Window) | SW/153582/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Gat No. 231, 392 | (b)Pincode | 414403 | (c)Bounded Latitudes (North) | | From | | Degree | 182730.21 | Minutes | | Second | | From | | Degree | 182827.78 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 744750.56 | Minutes | | Second | | From | | Degree | 744815.44 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47J/10, 47J/11, 47J/14 and 47J/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 566 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6.6 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | File No. EC-1085/RON/2019-NCP/6091 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 11 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Absolute Alcohol "OR" | 54.29 | 81.40 | 135.69 | Kilo Litre per Day(KLD) | | Road | | (2.) | Sugar | 7500 | 4500 | 12000 | Tons Crushed per Day(TCD) | | Road | | (3.) | Rectified Spirit "OR" | 60 | 90 | 150 | Kilo Litre per Day(KLD) | | Road | | (4.) | Ethanol | 54.29 | 81.40 | 135.69 | Kilo Litre per Day(KLD) | | Road | | (5.) | Extra Neutral Alcohol "OR" | 56.4 | 84.60 | 141 | Kilo Litre per Day(KLD) | | Road | | (6.) | Power | 38 | 00 | 38 | Mega Watt(MW) | | Others | Connected to MESB Grid | (7.) | Fusel Oil "OR" | 50 | 70 | 120 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Distillery Unit | 60 KLPD | 90 KLPD | 150 KLPD | Expansion cum modernization | (2.) | Sugar Unit | 7500 TCD | 4500 TCD | 12000 TCD | Expansion of sugar unit | (3.) | Co-generation power plant | 38 MW | 00 | 38 MW | Existing Unit | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 04 Jan 2020 | (iv)Valid Upto | 31 Aug 2020 | (v)File No. | Format1.0/UAN No.MPCB-Consent-0000078072/CR-200100 | (vi)Application No. | MPCB-CONSENT-0000078072 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 540.7241 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 50.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.35 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 9.98 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3430291 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 3430291 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Yeast | 9000 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (2.) | Molasses as raw material for distillery | 167910 | Tons per Annum | | C Grade molasses from own & sister sugar industry | Road | | 10 | MoU | | Copy of Linkage | (3.) | Molasses as raw material for distillery | 146100 | Tons per Annum | | B heavy molasses from own unit | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (4.) | DAP | 7500 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (5.) | Lime | 3240 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (6.) | Sulphur Di Oxide | 972 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (7.) | Phosphoric Acid | 43.2 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (8.) | Concentrated Spent Wash | 59976 | Tons per Annum | | Captive | Pipe Conveyor | | 00 | Captive | | Copy of Linkage | (9.) | Sugar cane | 642850 | Tons per Annum | | Sugar cane for juice production for distillery | Road | | 10 | Others | Farmers | Copy of Linkage | (10.) | Turkey red oil | 200000 | Tons per Annum | | Availble from district market | Road | | 10 | Open Market | | Copy of Linkage | (11.) | Sugar cane | 2160000 | Tons per Annum | | For sugar production available within district | Road | | 10 | Others | Farmers | Copy of Linkage | (12.) | Coal | 25200 | Tons per Annum | | Coal as fuel for incineration boiler | Road | | 10 | Open Market | Farmers | Copy of Linkage | (13.) | Urea | 7500 | Tons per Annum | | available from district market | Road | | 10 | Open Market | Farmers | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1227 | 0.3 | Copy of Permission Letter | Pipeline | | Jack Well | | Ja. Kr.udhwyvi/Bi.Sin./3010/san 2014 | 29 Sep 2014 | 504.11 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sugar unit Stream A B moderate effluent and sewage | 1684 | 1700 | Extended aeration followed by tertiary treatment | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 1684 | | (2.) | Sewage from colony | 60 | 60 | Equilization cum anerobic tank followed by aerobic followed by settling and holding tank followed by filtration | Green Belt Renewal Plant | | 60 | | (3.) | Spent wash max value | 980 | 980 | Evaporation in MEE and CSW sent to incineration | Others | Potash Rich Ash, Sold to Farmers as Manure | 980 | 00 | (4.) | Max distillery sober moderate and process cond | 1064 | 1700 | CPU unit | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 1064 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3788 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3788 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP sludge | Industrial Waste | | 19.84 | Tons | 00 | Road | | Others | Used as soil conditioner after drying | (2.) | Canteen waste | Municipal Solid Waste | | 1.3 | Tons | 00 | Road | | Others | After composting used as manure in own garden | (3.) | Domestic waste from colony | Municipal Solid Waste | | 2 | Tons | 00 | Road | | Others | After composting used as manure in own garden | (4.) | Office waste | Others | Office dry waste | 0.80 | Tons | 2 | Road | | Others | Sold to recycler | (5.) | Bagasse ash from sugar and cogen unit | Industrial Waste | | 12960 | Tons | 2 | Road | | Others | composting and brick manufacturer | (6.) | Spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 16500 | Kilolitre | 0 | Pipe Conveyor | | Others | Burn in own boiler as fuel | (7.) | Incineration boiler ash | Industrial Waste | | 48600 | Tons | 2 | Road | | Others | Sold to farmers and brick manufacturer | (8.) | Yeast sludge | Industrial Waste | | 1125 | Tons | 00 | Road | | Others | After composting used as manure in own garden | (9.) | Press mud | Industrial Waste | | 86400 | Tons | 2 | Road | | Others | Sold to farmers | (10.) | Packing section | Plastic Waste | | 0.33 | Tons | 2 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 36 | 1.5 | 1 | 37.1 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 82 | 1.5 | 2.8 | 85 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 28 | 1.5 | 1.59 | 29.60 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 38 | 1.5 | 0.1 | 38.2 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 40 TPH boiler for proposed sugar expansion | Baggase | 72 | 3 | PM10 | | 0.56 | (2.) | Existing upgraded boiler 30 TPH | CSW and Coal | 73 | 3 | PM10 | | 2.43 | (3.) | Existing sugar and cogen unit 110 TPH boiler | Bagasse | 78 | 3 | PM10 | | 1.56 | (4.) | Existing Sugar and cogen unit 90 TPH boiler | Bagasse | 72 | 3 | PM10 | | 1.27 | (5.) | Existing upgraded boiler 30 TPH | CSW and Coal | 73 | 3 | SO2 | | 21.16 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 18905 | (b)Source | captive cogeneration unit | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Existing 1 No of 1010 kVA and 2 No 750 kVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 127.532633 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 127.53263 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 7412.4 | (b)Waste/Barren Land (ha.) | 2892.6 | (c)Grazing/ Community Land (ha.) | 5020.5 | (d)Surface Water Bodies (ha.) | 824.3 | (e)Settlements (ha.) | 292.0 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : Open land and Fallow land | 14973.9 | Total (ha.) | 31415.7000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 23.164038 | sugar cogen and distllery unit | (2.) | Green belt | | 50.37 | Existing and proposed | (3.) | Others | Roads parking storage and open space | 54.004536 | Roads parking storage and open space | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 00 | There is no presence of CPA in 10 Km radius of project | (2.) | WLS | NA | 00 | There is no presence of WLSin 10 Km radius of project | (3.) | ESAs | NA | 00 | There is no presence of ESAs in 10 Km radius of project | (4.) | ESZs | NA | 00 | There is no presence of ECZs in 10 Km radius of project | (5.) | NPA | NA | 00 | There is no presence of NPA in 10 Km radius of project | (6.) | Wildlife Corridors | NA | 00 | There is no presence of wildlife corridors in 10 Km radius of project | (7.) | Corridors | NA | 00 | There is no presence of corridors in 10 Km radius of project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | There are no archealogical sites within 10 km from project site | (2.) | Forest | | NA | 0 | There is no forest land within 10 km from project site | (3.) | Defence Installations | | NA | 0 | There are no any defence installations within 10 km from project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 127.53 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | NA | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | own rain Water storage bandhara | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bhima River about 6.6 km from site | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 6.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 552 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 300 | (f)Total Manpower | 652 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 109.70 | 14.70 | 124.4 | (2.) | Percentage of Total Project Area | 36 | 3 | 39 | (3.) | No. of Plants | 27464 | 23000 | 50464 | (4.) | Funds Allocated | 43000000 | 9000000 | 52000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Industry support the Ethanol Blending Programme of Government | (2.) | Environmental | Zero Liquid discharge principle have been adopted & plantation of 23000 trees | (3.) | Social | Employment Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/ RA 0094 | (ii)Name of the EIA Consultant | ULTRA-TECH Environment Consultancy and Laboratory | (iii)Address | Unit Nos. 224, 225 & 226 Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane 400 601, Maharashtra, India. | (iv)Mobile No. | 9820626017 | (v)Landline No. | 0222534277 | (vi)Email Id | shekhartamhane@ultratech.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 30 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Copy of addended to EIA has not uploaded. However in S.No. 39 of Form 2 (Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan) only one page of layout uploaded. PP needs to check before uploading the documents on Parivesh Portal.
(ii) As per Form 2 (S.No. 20) Land Ownership Pattern reported is 127.53263 ha, however Present Land Use Breakup of the Study Area is reported 127.53263 Ha, how it is possible. Kindly check the data and revise the form 2 accordingly
(iii) All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2).
(iv) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any.
(v) Details of plant facility as per Form-2 of S. No. 8.1 needs to be submitted.
(vi) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero.
(vii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(viii) Details of Non compliances of RO MoEFCC needs to be submitted.
(ix) Details (S.No. 18.1 at Form 2) w.r.t. Air Quality Impact Prediction needs to checked. How incremental GLC for Sox will be 8.8. Please check again.
(x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 26 Jun 2020 | 2. | NA | The correction have been made as per the instruction received | 11 Jul 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | In detailed Point wise compliance for additional details sought by MS & reply to point raised in 22nd EAC meeting mentioned in uploaded document | 08 Sep 2020 | 2. | NA |
The EAC during deliberations noted that the utilization of the fresh water is at very higher level, in spite the fact that better technologies are available to reduce the same. It is suggested that the treated industrial effluent shall not be send outside the premises/not to be used for greenbelt inside the premises. PP can use treated domestic water for greenbelt development.
The Committee, after detailed deliberations desired for following additional information/inputs in respect of the following:
(i) Details of products.
(ii) Detailed Plan for achieving complete Zero Liquid Discharge System.
(iii) Revised water balance with reduction in freshwater consumption (@2KL/KL of alcohol).
(iv) Details of power utilization from solar sources.
(v) CER allocation and plan as per Ministry’s OM dated 01.05.2018.
(vi) Compliance status of the existing EC conditions.
(vii) PP uploaded the water approval in Regional language. The Committee also noted that PP/Consultant needs to be uploaded the legible document and in case of document issued in regional language then English translation copy needs to be uploaded.
(viii) The EAC during deliberations noted that the consultant has not prepared adequate report. The Committee also suggested that the Consultant shall do proper study and then submit the report so that proposal is not delayed.
The proposal was accordingly DEFERRED for the needful.
| 01 Sep 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Jungle Nivruti Wagh | Designation | Executive Director | Name of Company (Applicant Name should not be given here) | M/s. Shri Ambalika Sugar Pvt. Ltd. | Address | A/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar |
|