Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of distillery unit from 60 KLPD to 150 KLPD & sugar unit from 7500 TCD to 12000 TCD by Shiri Ambalika Sugar Pvt. Ltd. at Ambika nagar , A/P Jagdamba Factory, Taluka Karjat, District Ahmednag
(b)Name of the Company / Organisation M/s. Shri Ambalika Sugar Pvt. Ltd.
(c)Registered Address A/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar,A/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar,Ludhiana,Dadra and Nagar Haveli-414403
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jungle Nivruti Wagh
(b)Designation (Owner/ Partner/ CEO) Executive Director
(c)Address NIL
(d)Pin code 414403
(e)E-mail mmambalika0101@gmail.com
(f)STD Code. 0(f)Telephone No. 255401
(g)Fax No. 255400
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/153652/2020
(d)Master Proposal Number(Single Window) SW/153582/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gat No. 231, 392
(b)Pincode 414403
(c)Bounded Latitudes (North)
From
Degree 182730.21
Minutes
Second
From
Degree 182827.78
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 744750.56
Minutes
Second
From
Degree 744815.44
Minutes
Second
(e)Survey of India Topo Sheet No. 47J/10, 47J/11, 47J/14 and 47J/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 566
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.6
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. File No. EC-1085/RON/2019-NCP/6091
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 11 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Absolute Alcohol "OR"54.2981.40135.69Kilo Litre per Day(KLD)Road
(2.)Sugar7500450012000Tons Crushed per Day(TCD)Road
(3.)Rectified Spirit "OR"6090150Kilo Litre per Day(KLD)Road
(4.)Ethanol54.2981.40135.69Kilo Litre per Day(KLD)Road
(5.)Extra Neutral Alcohol "OR"56.484.60141Kilo Litre per Day(KLD)Road
(6.)Power380038Mega Watt(MW)OthersConnected to MESB Grid
(7.)Fusel Oil "OR"5070120Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery Unit60 KLPD90 KLPD150 KLPDExpansion cum modernization
(2.)Sugar Unit7500 TCD4500 TCD12000 TCDExpansion of sugar unit
(3.)Co-generation power plant38 MW0038 MWExisting Unit
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Jan 2020
(iv)Valid Upto 31 Aug 2020
(v)File No. Format1.0/UAN No.MPCB-Consent-0000078072/CR-200100
(vi)Application No. MPCB-CONSENT-0000078072
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 540.7241
(b) Funds Allocated for Environment Management (Capital) (in Crores) 50.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.35
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 9.98
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3430291
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3430291
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Yeast9000Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(2.)Molasses as raw material for distillery167910Tons per AnnumC Grade molasses from own & sister sugar industryRoad10 MoUCopy of Linkage
(3.)Molasses as raw material for distillery146100Tons per AnnumB heavy molasses from own unitConveyor Belt0 CaptiveCopy of Linkage
(4.)DAP7500Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(5.)Lime3240Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(6.)Sulphur Di Oxide972Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(7.)Phosphoric Acid43.2Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(8.)Concentrated Spent Wash59976Tons per AnnumCaptivePipe Conveyor00 CaptiveCopy of Linkage
(9.)Sugar cane642850Tons per AnnumSugar cane for juice production for distilleryRoad10 OthersFarmersCopy of Linkage
(10.)Turkey red oil200000Tons per AnnumAvailble from district marketRoad10 Open MarketCopy of Linkage
(11.)Sugar cane2160000Tons per AnnumFor sugar production available within districtRoad10 OthersFarmersCopy of Linkage
(12.)Coal25200Tons per AnnumCoal as fuel for incineration boilerRoad10 Open MarketFarmersCopy of Linkage
(13.)Urea7500Tons per Annumavailable from district marketRoad10 Open MarketFarmersCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface12270.3Copy of Permission LetterPipelineJack WellJa. Kr.udhwyvi/Bi.Sin./3010/san 201429 Sep 2014504.11
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sugar unit Stream A B moderate effluent and sewage16841700Extended aeration followed by tertiary treatmentReuse within the Plant & Recycling,Green Belt Renewal Plant1684
(2.)Sewage from colony6060Equilization cum anerobic tank followed by aerobic followed by settling and holding tank followed by filtrationGreen Belt Renewal Plant60
(3.)Spent wash max value980980Evaporation in MEE and CSW sent to incinerationOthersPotash Rich Ash, Sold to Farmers as Manure98000
(4.)Max distillery sober moderate and process cond10641700CPU unitReuse within the Plant & Recycling,Green Belt Renewal Plant1064
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3788
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3788
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeIndustrial Waste19.84Tons00RoadOthersUsed as soil conditioner after drying
(2.)Canteen wasteMunicipal Solid Waste1.3Tons00RoadOthersAfter composting used as manure in own garden
(3.)Domestic waste from colonyMunicipal Solid Waste2Tons00RoadOthersAfter composting used as manure in own garden
(4.)Office wasteOthersOffice dry waste0.80Tons2RoadOthersSold to recycler
(5.)Bagasse ash from sugar and cogen unitIndustrial Waste12960Tons2RoadOtherscomposting and brick manufacturer
(6.)Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16500Kilolitre0Pipe ConveyorOthersBurn in own boiler as fuel
(7.)Incineration boiler ashIndustrial Waste48600Tons2RoadOthersSold to farmers and brick manufacturer
(8.)Yeast sludgeIndustrial Waste1125Tons00RoadOthersAfter composting used as manure in own garden
(9.)Press mudIndustrial Waste86400Tons2RoadOthersSold to farmers
(10.)Packing sectionPlastic Waste0.33Tons2RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube361.5137.180
(2.)PM10Microgram per Meter Cube821.52.885100
(3.)SO2Microgram per Meter Cube281.51.5929.6080
(4.)PM2.5Microgram per Meter Cube381.50.138.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)40 TPH boiler for proposed sugar expansionBaggase723PM100.56
(2.)Existing upgraded boiler 30 TPHCSW and Coal733PM102.43
(3.)Existing sugar and cogen unit 110 TPH boilerBagasse783PM101.56
(4.)Existing Sugar and cogen unit 90 TPH boilerBagasse723PM101.27
(5.)Existing upgraded boiler 30 TPHCSW and Coal733SO221.16
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 18905
(b)Source captive cogeneration unit
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing 1 No of 1010 kVA and 2 No 750 kVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 127.532633
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 127.53263
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 7412.4
(b)Waste/Barren Land (ha.) 2892.6
(c)Grazing/ Community Land (ha.) 5020.5
(d)Surface Water Bodies (ha.) 824.3
(e)Settlements (ha.) 292.0
(f)Industrial (ha.) 00
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : Open land and Fallow land 14973.9
    Total (ha.) 31415.7000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant23.164038sugar cogen and distllery unit
(2.)Green belt50.37Existing and proposed
(3.)OthersRoads parking storage and open space54.004536Roads parking storage and open space
Total (ha.) 127.538574
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00There is no presence of CPA in 10 Km radius of project
(2.)WLSNA00There is no presence of WLSin 10 Km radius of project
(3.)ESAsNA00There is no presence of ESAs in 10 Km radius of project
(4.)ESZsNA00There is no presence of ECZs in 10 Km radius of project
(5.)NPANA00There is no presence of NPA in 10 Km radius of project
(6.)Wildlife CorridorsNA00There is no presence of wildlife corridors in 10 Km radius of project
(7.)CorridorsNA00There is no presence of corridors in 10 Km radius of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0There are no archealogical sites within 10 km from project site
(2.)ForestNA0There is no forest land within 10 km from project site
(3.)Defence InstallationsNA0There are no any defence installations within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 127.53
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area own rain Water storage bandhara
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhima River about 6.6 km from site
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 552
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 00
(e)No. of working days 300
(f)Total Manpower 652
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt109.7014.70124.4
(2.)Percentage of Total Project Area36339
(3.)No. of Plants274642300050464
(4.)Funds Allocated43000000900000052000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialIndustry support the Ethanol Blending Programme of Government
(2.)EnvironmentalZero Liquid discharge principle have been adopted & plantation of 23000 trees
(3.)SocialEmployment Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/ RA 0094
(ii)Name of the EIA Consultant ULTRA-TECH Environment Consultancy and Laboratory
(iii)Address Unit Nos. 224, 225 & 226 Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane 400 601, Maharashtra, India.
(iv)Mobile No. 9820626017
(v)Landline No. 0222534277
(vi)Email Id shekhartamhane@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Copy of addended to EIA has not uploaded. However in S.No. 39 of Form 2 (Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan) only one page of layout uploaded. PP needs to check before uploading the documents on Parivesh Portal. (ii) As per Form 2 (S.No. 20) Land Ownership Pattern reported is 127.53263 ha, however Present Land Use Breakup of the Study Area is reported 127.53263 Ha, how it is possible. Kindly check the data and revise the form 2 accordingly (iii) All old CTOs not uploaded to verify the violation, if any done by PP (S No. 9.1 of Form 2). (iv) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. (v) Details of plant facility as per Form-2 of S. No. 8.1 needs to be submitted. (vi) PP in form 2 (S.No. 27) has not adequately mentioned the details of R&R. Everything mentioned zero. (vii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (viii) Details of Non compliances of RO MoEFCC needs to be submitted. (ix) Details (S.No. 18.1 at Form 2) w.r.t. Air Quality Impact Prediction needs to checked. How incremental GLC for Sox will be 8.8. Please check again. (x) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. 26 Jun 2020
2.NAThe correction have been made as per the instruction received 11 Jul 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterIn detailed Point wise compliance for additional details sought by MS & reply to point raised in 22nd EAC meeting mentioned in uploaded document 08 Sep 2020
2.NA

 

The EAC during deliberations noted that the utilization of the fresh water is at very higher level, in spite the fact that better technologies are available to reduce the same. It is suggested that the treated industrial effluent shall not be send outside the premises/not to be used for greenbelt inside the premises. PP can use treated domestic water for greenbelt development.

 

The Committee, after detailed deliberations desired for following additional information/inputs in respect of the following:

 

(i)           Details of products.

(ii)         Detailed Plan for achieving complete Zero Liquid Discharge System.

(iii)        Revised water balance with reduction in freshwater consumption (@2KL/KL of alcohol).

(iv)        Details of power utilization from solar sources.

(v)         CER allocation and plan as per Ministry’s OM dated 01.05.2018.

(vi)        Compliance status of the existing EC conditions.

(vii)      PP uploaded the water approval in Regional language. The Committee also noted that PP/Consultant needs to be uploaded the legible document and in case of document issued in regional language then English translation copy needs to be uploaded.   

(viii)     The EAC during deliberations noted that the consultant has not prepared adequate report.  The Committee also suggested that the Consultant shall do proper study and then submit the report so that proposal is not delayed. 

The proposal was accordingly DEFERRED for the needful.

01 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJungle Nivruti Wagh
DesignationExecutive Director
Name of Company (Applicant Name should not be given here)M/s. Shri Ambalika Sugar Pvt. Ltd.
AddressA/p. Jagdamba Factory, Tal. Karjat, Dist. Ahmednagar