Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Siddapur Distilleries Limited (SDL)
(b)Name of the Company / Organisation SIDDAPUR DISTILLERIESLIMITED
(c)Registered Address M/S. Siddapur Distilleries Limited., (SDL),,Siddapur Village, Jamkhandi Taluk & Bagalkot District, Karnataka.,Bagalkot,Karnataka-587302
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Haragapure C D
(b)Designation (Owner/ Partner/ CEO) Cheif Executive Officer
(c)Address M/s. Siddapur Distilleries Limited(SDL).,,Siddapur Village, Jamkhandi Taluk & Bagalkot District, Karnataka.,,Bagalkot,Karnataka-587302
(d)Pin code 587302
(e)E-mail sdlsiddapur@gmail.com
(f)STD Code. 8353(f)Telephone No. 238073
(g)Fax No. 08353238063
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/KA/IND2/153620/2020
(d)Master Proposal Number(Single Window) SW/153619/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 49/2B/1 & 2, 57/2D & 2E, 58/1B, 58/1A/3, 66/4D, 85
(b)Pincode 587302
(c)Bounded Latitudes (North)
From
Degree 16.2612
Minutes
Second
From
Degree 16.2628
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.1615
Minutes
Second
From
Degree 75.1619
Minutes
Second
(e)Survey of India Topo Sheet No. 47P7, 47P2, 47P3, 47P6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 618
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/194/KAR/772
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 13 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Modification of scope ,18 TPH boiler01818OthersTPHOthersPipeline
(2.)MEE for treatment of spent wash000Kilo Litre per Day(KLD)OthersPipeline
(3.)Bio gas power plant022Mega Watt(MW)OthersPipeline
(4.)Captive power plant01.51.5Mega Watt(MW)OthersPipeline
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Molasses based distillery70 KLPD070 KLPDThere is no increase in the production capacity
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Mar 2019
(iv)Valid Upto 30 Jun 2021
(v)File No. AW-311317
(vi)Application No. 10039
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 14.42
(b) Funds Allocated for Environment Management (Capital) (in Crores) 16.98
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.23
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7806.4
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7806.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses as raw material for distillery7800OthersMT/monthAdjacent sugar millPipe Conveyor0 MoUCopy of Linkage
(2.)DAP378Tons per AnnumLocally procuredRoad50 Open MarketCopy of Linkage
(3.)Bagasse2430Tons per AnnumAdjacent sugar millConveyor Belt0 OthersAdjacent sugar millCopy of Linkage
(4.)De foamer945Tons per AnnumLocally procuredRoad50 Open MarketCopy of Linkage
(5.)Urea405Tons per AnnumLocally procuredRoad50 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.42 To 14.55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.36 To 11.30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface60022Copy of Permission LetterPipelineIntake WellIN-KA0766492978647M31 Jan 2014959
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)70 KLD distillery with boiler and MEE638.21000Biomethanization, MEE, physicochemical treatment and bio compostingOtherscooling tower make up, greenbelt and ash quenching638.20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 638.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 638.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Yeast sludgeIndustrial Waste6210Tons0Pipe ConveyorOthersMixed with Press Mud & made to organic manure
(2.)Boiler ashIndustrial Waste1458Tons0OthersTrolleyOthersBrick manufacturing & Bio composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube7616.483.3100
(2.)SO2Microgram per Meter Cube4.90.50.85.880
(3.)PM2.5Microgram per Meter Cube340.53.838.1360
(4.)NOxMicrogram per Meter Cube10.20.51.211.480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler-18 TPHBagasse,biomass493PM10100
(2.)DG Set-1000 kVADiesel311SO280
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2600
(b)Source At present co gen plant, captive power plant and b
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 x 100 kVA
(e)Stack Height (in m) 31
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 12.14
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 12.14
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial land 12.14
    Total (ha.) 12.1400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersIndustrial land12.14
Total (ha.) 12.14
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None
(2.)NPANone0None
(3.)ESZsNone0None
(4.)Critically Polluted AreaNone0None
(5.)CorridorsNone0None
(6.)ESAsNone0None
(7.)Wildlife CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0None
(2.)Archaeological SitesNone0None
(3.)OthersReserve ForestHulyal RF3Reserve forest
(4.)ForestSiddapur Reserve forest1Reserve forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 12.14
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jamkhandi lake and Katti lake
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 3
(d)Temporary Employment- During Operation 5
(e)No. of working days 270
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants50000050000
(2.)Funds Allocated50050
(3.)Percentage of Total Project Area82082
(4.)Total Area of Green Belt10010
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment oppurtunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0051
(ii)Name of the EIA Consultant Samrakshan
(iii)Address F-4, 1st Floor,S.C. Road, Sheshadripuram,(Opp. Sheshadripuram Police Station),      Bangalore- 560 020, INDIA Phone : 080-23460102
(iv)Mobile No. 9845381819
(v)Landline No. 0802346010
(vi)Email Id samrakshanblr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Jul 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) This is Category B Project so kindly apply to SEIAA (ii) PP has got EC from 60 KLPD to 70 KLPD on 9th July 2018 from Ministry of Environment, Forest & Climate Change, however compliance report from RO MoEFCC is fully non-complied. (iii) Details of all ECs needs to be uploaded. Prima-facia it appears that the main EC is under provisions of EIA Notification, 1994, then taken 2nd EC in 2018 under 7(ii) clause. Please provide all the details so that the same may be examined. (iv) All old CTOs not uploaded to verify the violation, if any done by PP. (v) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any. (vi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2) (vii) Details of approval of conservation plan for schedule I species needs to be uploaded. (viii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful 27 May 2020
2.NAThe correction have been made as per the instruction received 30 May 2020
3.NA. Please read the earlier EDS sought by the Ministry in May 2020. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal. 2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. 3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. 26 Jun 2020
4.NAThe correction have been made as per the instruction received 01 Jul 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHaragapure C D
DesignationCheif Executive Officer
Name of Company (Applicant Name should not be given here)SIDDAPUR DISTILLERIESLIMITED
AddressM/S. Siddapur Distilleries Limited., (SDL),