1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Siddapur Distilleries Limited (SDL) | (b)Name of the Company / Organisation | SIDDAPUR DISTILLERIESLIMITED | (c)Registered Address | M/S. Siddapur Distilleries Limited., (SDL),,Siddapur Village, Jamkhandi Taluk & Bagalkot District, Karnataka.,Bagalkot,Karnataka-587302 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Haragapure C D | (b)Designation (Owner/ Partner/ CEO) | Cheif Executive Officer | (c)Address | M/s. Siddapur Distilleries Limited(SDL).,,Siddapur Village, Jamkhandi Taluk & Bagalkot District, Karnataka.,,Bagalkot,Karnataka-587302 | (d)Pin code | 587302 | (e)E-mail | sdlsiddapur@gmail.com | (f)STD Code. | 8353(f)Telephone No. | 238073 | (g)Fax No. | 08353238063 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/KA/IND2/153620/2020 | (d)Master Proposal Number(Single Window) | SW/153619/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 49/2B/1 & 2, 57/2D & 2E, 58/1B, 58/1A/3, 66/4D, 85 | (b)Pincode | 587302 | (c)Bounded Latitudes (North) | | From | | Degree | 16.2612 | Minutes | | Second | | From | | Degree | 16.2628 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.1615 | Minutes | | Second | | From | | Degree | 75.1619 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47P7, 47P2, 47P3, 47P6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 618 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/194/KAR/772 | (iv)Status of Compliance | Non Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 13 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Modification of scope ,18 TPH boiler | 0 | 18 | 18 | Others | TPH | Others | Pipeline | (2.) | MEE for treatment of spent wash | 0 | 0 | 0 | Kilo Litre per Day(KLD) | | Others | Pipeline | (3.) | Bio gas power plant | 0 | 2 | 2 | Mega Watt(MW) | | Others | Pipeline | (4.) | Captive power plant | 0 | 1.5 | 1.5 | Mega Watt(MW) | | Others | Pipeline | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Molasses based distillery | 70 KLPD | 0 | 70 KLPD | There is no increase in the production capacity | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Mar 2019 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-311317 | (vi)Application No. | 10039 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 14.42 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 16.98 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.23 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.84 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7806.4 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 7806.4 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Molasses as raw material for distillery | 7800 | Others | MT/month | Adjacent sugar mill | Pipe Conveyor | | 0 | MoU | | Copy of Linkage | (2.) | DAP | 378 | Tons per Annum | | Locally procured | Road | | 50 | Open Market | | Copy of Linkage | (3.) | Bagasse | 2430 | Tons per Annum | | Adjacent sugar mill | Conveyor Belt | | 0 | Others | Adjacent sugar mill | Copy of Linkage | (4.) | De foamer | 945 | Tons per Annum | | Locally procured | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Urea | 405 | Tons per Annum | | Locally procured | Road | | 50 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.42 To 14.55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.36 To 11.30 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 600 | 22 | Copy of Permission Letter | Pipeline | | Intake Well | | IN-KA0766492978647M | 31 Jan 2014 | 959 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | 70 KLD distillery with boiler and MEE | 638.2 | 1000 | Biomethanization, MEE, physicochemical treatment and bio composting | Others | cooling tower make up, greenbelt and ash quenching | 638.2 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 638.2 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 638.2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Yeast sludge | Industrial Waste | | 6210 | Tons | 0 | Pipe Conveyor | | Others | Mixed with Press Mud & made to organic manure | (2.) | Boiler ash | Industrial Waste | | 1458 | Tons | 0 | Others | Trolley | Others | Brick manufacturing & Bio composting | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 76 | 1 | 6.4 | 83.3 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 4.9 | 0.5 | 0.8 | 5.8 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 34 | 0.5 | 3.8 | 38.13 | 60 | (4.) | NOx | | Microgram per Meter Cube | 10.2 | 0.5 | 1.2 | 11.4 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler-18 TPH | Bagasse,biomass | 49 | 3 | PM10 | | 100 | (2.) | DG Set-1000 kVA | Diesel | 31 | 1 | SO2 | | 80 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2600 | (b)Source | At present co gen plant, captive power plant and b | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 x 100 kVA | (e)Stack Height (in m) | 31 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 12.14 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 12.14 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Industrial land | 12.14 | Total (ha.) | 12.1400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Industrial land | 12.14 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None | (2.) | NPA | None | 0 | None | (3.) | ESZs | None | 0 | None | (4.) | Critically Polluted Area | None | 0 | None | (5.) | Corridors | None | 0 | None | (6.) | ESAs | None | 0 | None | (7.) | Wildlife Corridors | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None | 0 | None | (2.) | Archaeological Sites | | None | 0 | None | (3.) | Others | Reserve Forest | Hulyal RF | 3 | Reserve forest | (4.) | Forest | | Siddapur Reserve forest | 1 | Reserve forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 12.14 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Jamkhandi lake and Katti lake | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 2 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 3 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 270 | (f)Total Manpower | 25 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 50000 | 0 | 50000 | (2.) | Funds Allocated | 50 | 0 | 50 | (3.) | Percentage of Total Project Area | 82 | 0 | 82 | (4.) | Total Area of Green Belt | 10 | 0 | 10 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment oppurtunities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/IA0051 | (ii)Name of the EIA Consultant | Samrakshan | (iii)Address | F-4, 1st Floor,S.C. Road, Sheshadripuram,(Opp. Sheshadripuram Police Station), Bangalore- 560 020, INDIA Phone : 080-23460102 | (iv)Mobile No. | 9845381819 | (v)Landline No. | 0802346010 | (vi)Email Id | samrakshanblr@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 24 Jul 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) This is Category B Project so kindly apply to SEIAA
(ii) PP has got EC from 60 KLPD to 70 KLPD on 9th July 2018 from Ministry of Environment, Forest & Climate Change, however compliance report from RO MoEFCC is fully non-complied.
(iii) Details of all ECs needs to be uploaded. Prima-facia it appears that the main EC is under provisions of EIA Notification, 1994, then taken 2nd EC in 2018 under 7(ii) clause. Please provide all the details so that the same may be examined.
(iv) All old CTOs not uploaded to verify the violation, if any done by PP.
(v) Details of earlier production capacity needs to be authenticated and uploaded to check the violation, if any.
(vi) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(vii) Details of approval of conservation plan for schedule I species needs to be uploaded.
(viii) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful | 27 May 2020 | 2. | NA | The correction have been made as per the instruction received | 30 May 2020 | 3. | NA | . Please read the earlier EDS sought by the Ministry in May 2020. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information on Parivesh Portal.
2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action.
3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. | 26 Jun 2020 | 4. | NA | The correction have been made as per the instruction received | 01 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Haragapure C D | Designation | Cheif Executive Officer | Name of Company (Applicant Name should not be given here) | SIDDAPUR DISTILLERIESLIMITED | Address | M/S. Siddapur Distilleries Limited., (SDL), |
|