Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Molasses based Distillery (60 KLPD to 180 KLPD) and co-generation power plant (2.0 MW to 8.0 MW) within the existing plant premises at Village Jangraulipul, Tehsil Pilibhit, District Pili
(b)Name of the Company / Organisation LH SUGAR FACTORIES LIMITED - DISTILLERY DIVISION
(c)Registered Address Civil Lines, Pilibhit (UP),,Pilibhit,Uttar Pradesh-262001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ranjan Mishra
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address LH Sugar Factories Ltd., Distillery Division, Village Jangrauli Pul, Pilibhit,,Pilibhit,Pilibhit,Uttar Pradesh-262001
(d)Pin code 262001
(e)E-mail agm.dist@lhsugar.com
(f)STD Code. 5882(f)Telephone No. 255867
(g)Fax No. 255518
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND/20749/2013
(d)Master Proposal Number(Single Window) SW/153610/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 411 Mi, 60
(b)Pincode 262001
(c)Bounded Latitudes (North)
From
Degree 28.56083333
Minutes
Second
From
Degree 28.56555556
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.81277778
Minutes
Second
From
Degree 79.81722222
Minutes
Second
(e)Survey of India Topo Sheet No. 53P/10, 53P/11, 53P/14, 53P/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 185
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.8
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhHemgirSiarmal,Tumulia
(2.)Uttar PradeshPilibhitPilibhit
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/354/2013-IA-II (I)
(c)Date of Issue of TOR 30 Apr 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Nov 2014
(c)Date of Issue of EC 15 Jul 2015
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0
Plant Premises
State :Uttar Pradesh
District :Pilibhit
Tehsil :Pilibhit
Village :Jangraulipul
57Employment, benefits to villagersOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/Env/UP/Ind-142/400/2015/682
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 17 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power268Mega Watt(MW)OthersThrough cables
(2.)IMFL/CL bottles01000010000Otherscases/dayRoadThrough cables
(3.)Ethanol/ENA/RS60120180Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)IMFL/CL Bottling Plant01000010000cases /day
(2.)Molasses based distillery60120180KLPD
(3.)Co-generation power plant268Mega Watt
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Mar 2020
(iv)Valid Upto 31 Dec 2021
(v)File No. 77942/UPPCB/Bareilly(UPPCBRO)/CTO/air/PIL/2019
(vi)Application No. 81172/UPPCB/Bareilly(UPPCBRO)/CTO/water/PIL/2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 107.10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 210970
(b)Existing quantity of raw material/fuel 104025
(c)Total quantity of raw material/fuel 314995
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Boiler Fuel Biomass - Rice Husk76650Tons per AnnumLocal vendorsRoad500 OthersLocal vendorsCopy of Linkage
(2.)Molasses as raw material for distillery314995Tons per AnnumOwn & Nearby sugar millsRoad100 Othersown and nearby sugar millsCopy of Linkage
(3.)Conc Spent wash as fuel for co generation power plant195640Tons per AnnumOwn distillery plantOthersPipelines0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube94.360.993.43100
(2.)PM2.5Micro Gram per Meter Cube52.330.151.6760
(3.)NOxMicro Gram per Meter Cube35.313.633.2980
(4.)SO2Micro Gram per Meter Cube185.917.1680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3572215002000
(2.)Total Hardnessmg/l288.7163.2200600
(3.)TSSmg/l0000
(4.)Chloridesmg/l32.457.62501000
(5.)Fluoridemg/l0.790.231.01.5
(6.)pHNA7.927.576.58.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.037.32E
(2.)DOmg/l7.84.6E
(3.)BODmg/l16.22.4E
(4.)CODmg/l70.568.98E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.152.1Industrial- 75, Residential -55
(2.)Leq(Night)A-weighted decibels(dB(A))58.443.2Industrial - 70, Residential - 45
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.097.29
(2.)N(Nitrogen)Kilogram per hectare192.47136.59
(3.)P(Phosphorus)Kilogram per hectare49.4932.91
(4.)K(Potassium)Kilogram per hectare284.562.22
(5.)Electric ConductivityMillisiemens per Centimetre0.650.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.05 To 5.36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.42 To 5.52
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater13600Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2016/2349 and renewal 7/11/1828 Feb 20201542
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Process16401750ETP (Aerobic, anaerobic, filters and RO)Reuse within the Plant & Recycling1640
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1640
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1640
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshFly Ash35040Tons200RoadOthersbrick manufacturers, ash granules as manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube47.80.850.1947.9960
(2.)SO2Microgram per Meter Cube15.20.71.5016.7180
(3.)NOxMicrogram per Meter Cube26.90.751.3328.2380
(4.)PM10Microgram per Meter Cube88.210.3688.57100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed 56 TPH boilerConc. spent wash & biomass/coal841.85PM1030
(2.)Existing 23 TPH boilerConc. spent wash & biomass/coal652.15PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8250
(b)Source 8 MW co-generation power plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 320 KVA and 1250 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 11.74
    Total Land (ha.) 11.74
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22302.5
(b)Waste/Barren Land (ha.) 2985.7
(c)Grazing/ Community Land (ha.) 3729.35
(d)Surface Water Bodies (ha.) 968.72
(e)Settlements (ha.) 2761.94
(f)Industrial (ha.) 71.68
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : No other land 0
    Total (ha.) 32819.8900
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.35Main plant & utilities
(2.)Green belt3.9
(3.)Othersstorage, road, office, open area5.49storage, road, office, open area
Total (ha.) 11.74
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot applicable0No ESAs within 10 km radius
(2.)ESZsNot applicable0No ESZs within 10 km radius
(3.)NPANot applicable0No NPA within 10 km radius
(4.)Critically Polluted AreaNot applicable0No CPA within 10 km radius
(5.)Wildlife CorridorsNot applicable0No Wildlife Corridors within 10 km radius
(6.)CorridorsNot applicable0No Corridors within 10 km radius
(7.)WLSNot applicable0No WLS within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot applicable0No Forest within 10 km radius
(2.)Archaeological SitesNot applicable0No archaeological sites in 10 km radius
(3.)Defence InstallationsNot applicable0No defence installations in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.74
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Deoha River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 3
(b)Permanent Employment-During Operation 80
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 85
(e)No. of working days 365
(f)Total Manpower 318
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.903.9
(2.)Percentage of Total Project Area33033
(3.)No. of Plants577515007275
(4.)Funds Allocated500000020000007000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject will contribute in Ethanol Blending Program (EBP) driven by Govt. of India
(2.)FinancialImproved Livelihood with increased business opportunities
(3.)SocialEmployment generation and CER activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 097
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address JM EnviroNet Pvt. Ltd., 202A, ABW Tower, Near Iffco Chowk, Sector 25, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRanjan Mishra
DesignationAGM
Name of Company (Applicant Name should not be given here)LH SUGAR FACTORIES LIMITED - DISTILLERY DIVISION
AddressCivil Lines, Pilibhit (UP)