1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Dyes and Dye Intermediates Manufacturing Unit - Universal Dyes and Intermediates | (b)Name of the Company / Organisation | UNIVERSAL DYES AND INTERMEDIATES | (c)Registered Address | Plot No. 136, GIDC Estate, Nandesari, Dist: Vadodara - 391 340,,Vadodara,Gujarat-391340 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Archit S Shah | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. 136, GIDC Estate, Nandesari, Dist- Vadodara - 391340,,Vadodara,Vadodara,Gujarat-391340 | (d)Pin code | 391340 | (e)E-mail | dsptraders@yahoo.com | (f)STD Code. | 261(f)Telephone No. | 2461241 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/131290/2019 | (d)Master Proposal Number(Single Window) | SW/153467/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 136 | (b)Pincode | 391340 | (c)Bounded Latitudes (North) | | From | | Degree | 22.407214 | Minutes | | Second | | From | | Degree | 22.407736 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.097058 | Minutes | | Second | | From | | Degree | 73.097625 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 35 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 12 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Vadodara | Vadodara | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/423/2019-IA-II(I) | (b)Date of Apply of TOR | 19 Dec 2019 | (c)Date of Issue of TOR / Standard ToR | 10 Mar 2020 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Located in Notified Industrial area of GIDC Nandes | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SS Reactor | 3000 LTR | 3 | (2.) | SS Reactor | 2000 LTR | 2 | (3.) | MS Reactor | 3000 LTR | 5 | (4.) | Filter Press | 36” Inch | 5 | (5.) | Tray Dryer | 100 Trays | 2 | (6.) | MS Rubber Line Tank | 10000 Litre | 2 | (7.) | SS Reactor | 5000 LTR | 3 | (8.) | MS Reactor | 12000 LTR | 3 | (9.) | MS Reactor | 5000 LTR | 2 | (10.) | Centrifuge | 36” Inch | 3 | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Group-A (Vat Golden Yellow GK or Vat Magenta B or Vat Pink R or Vat Orange RF or Vat Yellow 5G) and/or | 7.5 | Others | MT/Month | Road | | (2.) | Group-B (Vat Violet 2R or Vat Olive T or Vat Olive Green B or Vat Blue RSN or Vat Navy Blue BR or Vat Brown BR or Ortho Benzoyl Benzoic Acid or Benzanthrone or Anthraquinone or 1- Nitro Anthraquinone or 1- Amino Anthraquinone or 1- Acetyl Napthalene or BromoBenzanthrone or DibromoBenzanthrone or Vat Blue 20 or Indigo Sols) | 35 | Others | MT/Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.04 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.70 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10644 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 10644 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Acetic acid | 216 | Tons per Annum | | GNFC | Road | | 110 | Open Market | | Copy of Linkage | (2.) | Acetyl Chloride | 268.8 | Tons per Annum | | Gujarat Halogens | Road | | 25 | Open Market | | Copy of Linkage | (3.) | Aluminum chloride | 1868.16 | Tons per Annum | | Prarthana Chemicals | Road | | 19 | Open Market | | Copy of Linkage | (4.) | Hydrochloric Acid | 1779.6 | Tons per Annum | | GACL | Road | | 18 | Open Market | | Copy of Linkage | (5.) | Chlorine | 36.36 | Tons per Annum | | GACL | Road | | 18 | Open Market | | Copy of Linkage | (6.) | Methanol | 560.04 | Tons per Annum | | Sudarshan Chemicals | Road | | 50 | Open Market | | Copy of Linkage | (7.) | Sulfuric Acid | 3780 | Tons per Annum | | GSFC | Road | | 25 | Open Market | | Copy of Linkage | (8.) | Sulfuryl Chloride | 1041.36 | Tons per Annum | | Vinayak Chemicals | Road | | 19 | Open Market | | Copy of Linkage | (9.) | 1-Amino Anthroquinone | 1249.08 | Tons per Annum | | Local | Road | | 20 | Open Market | | Copy of Linkage | (10.) | Soda ash | 963.24 | Tons per Annum | | TATA | Road | | 12 | Open Market | | Copy of Linkage | (11.) | Iodine | 5.64 | Tons per Annum | | Local | Road | | 15 | Open Market | | Copy of Linkage | (12.) | Nitric acid | 1050 | Tons per Annum | | GSFC | Road | | 25 | Open Market | | Copy of Linkage | (13.) | Toluene | 2100 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (14.) | Calcium Carbonate | 70.92 | Tons per Annum | | Local | Road | | 8 | Open Market | | Copy of Linkage | (15.) | Sodium Nitrite | 142.32 | Tons per Annum | | Deepak Nitrite | Road | | 17 | Open Market | | Copy of Linkage | (16.) | Bromine | 509.04 | Tons per Annum | | Patel Pesticides | Road | | 15 | Open Market | | Copy of Linkage | (17.) | 1 – Chloro Anthraquinone | 427.08 | Tons per Annum | | Local | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 47.49 | 42.30 | 46.79 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 76.01 | 72.38 | 75.30 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 22.19 | 13.11 | 20.15 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 19.15 | 11.07 | 17.65 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 908.04 | 34.13 | 300 | 600 | (2.) | Chlorides | | | mg/l | | 673.23 | 32.53 | 250 | 1000 | (3.) | pH | | | NA | | 7.99 | 6.96 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 62 | 4 | 50 | 100 | (5.) | TDS | | | mg/l | | 1902 | 156 | 500 | 2000 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | Heavy Metals | | Iron | mg/l | | 9.72 | 0 | 0.3 | 1 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.24 | 7.45 | A | (2.) | DO | | mg/l | | 6.90 | 6.72 | A | (3.) | BOD | | mg/l | | 3.98 | 2.78 | A | (4.) | COD | | mg/l | | 12.08 | 8.45 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.9 | 61.7 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.2 | 58.7 | 65 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 13.82 | 9.69 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.75 | 0.45 | (3.) | pH | | | 8.58 | 7.15 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 4.35 | 2.51 | (5.) | K(Potassium) | Milligram per Kilogram | | 40 | 18.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 35 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply | 112 | 5 | Copy of Permission Letter | Pipeline | | Others | GIDC Water Supply | NA | 23 Apr 2020 | 112 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 99 | 99 | ETP | Others | Discharge into CETP of NIA | 0 | 99 | (2.) | Domestic | 2.7 | 2.7 | Septic tank/ soak pit | Others | Septic tank/ soak pit | 0 | 2.7 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 101.7 | (b)Total Discharged Water (Kilolitre per Day) | 101.7 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3000 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Sodium Chloride solution | Industrial Waste | | 208 | Tons | 8 | Road | | Others | Sent to ETP or sold to end user | (3.) | Used Oil | Industrial Waste | | 0.02 | Kilolitre | 12 | Road | | Authorized Recyclers | | (4.) | Discarded Plastic Bag/ Liners/ Drums | Industrial Waste | | 10 | Tons | 15 | Road | | Authorized Recyclers | | (5.) | HBr (5%) | Industrial Waste | | 460 | Tons | 12 | Road | | Others | Sent to ETP or sold to end user | (6.) | Sodium Bromide solution | Industrial Waste | | 420 | Tons | 12 | Road | | Others | Sent to ETP or sold to end user | (7.) | Potassium Sulphate solution | Industrial Waste | | 852 | Tons | 12 | Road | | Others | Sent to ETP or sold to end user | (8.) | Copper Sulphate | Industrial Waste | | 408 | Tons | 15 | Road | | Others | Sent to ETP or sold to end user | (9.) | Aluminium Chloride solution | Industrial Waste | | 6300 | Tons | 15 | Road | | Others | Sent to ETP or sold to end user | (10.) | Nitric Acid 30% | Industrial Waste | | 3504 | Tons | 10 | Road | | Others | Sent to ETP or sold to end user | (11.) | Spent Solvent | Industrial Waste | | 1656 | Tons | 0 | Road | | Others | Re-process and reuse within premises | (12.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 10 | Road | | Others | Co-processing or common incineration site | (13.) | Iron Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 126 | Tons | 10 | Road | | Others | Co-processing or common incineration site | (14.) | Hydrochloric Acid Solution (3%) | Industrial Waste | | 280 | Tons | 8 | Road | | Others | Sent to ETP or sold to end user | (15.) | Zinc Sulphate | Industrial Waste | | 828 | Tons | 10 | Road | | Others | Sent to ETP or sold to end user | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 75.78 | 2.94 | 0.22 | 76.01 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.52 | 2.94 | 0.07 | 44.60 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 18.46 | 2.94 | 0.03 | 18.50 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.49 | 2.94 | 0.06 | 15.56 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set (20 KVA) | HSD | 12 | 0.1 | Others | SPM, SO2, NOx | 150, 262, 94 | (2.) | Process Vent-2 | -- | 12 | 0.1 | SO2 | | 40 | (3.) | Process Vent-3 | -- | 12 | 0.1 | Others | NH3 | 175 | (4.) | Hot Air Dryer | Briquettes of Bio-Coal | 15 | 0.12 | Others | SPM, SO2, NOx | 150, 262, 94 | (5.) | Process Vent-4 | -- | 12 | 0.1 | NOx | | 25 | (6.) | Boiler (1 TPH) | Briquettes of Bio-Coal | 30 | 0.15 | Others | SPM SO2 NOx | 150, 262, 94 | (7.) | Process Vent-5 | -- | 12 | 0.1 | Others | Br2 | 30 | (8.) | TFH (4 Lac KCal) | Briquettes of Bio-Coal | 15 | 0.12 | Others | SPM, SO2, NOx | 150, 262, 94 | (9.) | Process Vent-1 | -- | 12 | 0.1 | Others | HCl, Cl2 | 20, 9 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 125 | (b)Source | MGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 20 KVA * 1 Nos. | (e)Stack Height (in m) | 12 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.165 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.165 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 80.32 | (b)Waste/Barren Land (ha.) | 135.48 | (c)Grazing/ Community Land (ha.) | 20 | (d)Surface Water Bodies (ha.) | 3.1 | (e)Settlements (ha.) | 11.34 | (f)Industrial (ha.) | 10.37 | (g)Forest (ha.) | 10 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0.74 | (j)Others (ha.) : Open land, Marshy land, miscelleanous | 42.88 | Total (ha.) | 314.22999999999996 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.086 | | (2.) | Area for Solid Waste Management | | 0.028 | ETP area | (3.) | Green belt | | 0.016 | | (4.) | Others | Rm FG tank area security building | 0.035 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nandesari | 0.70 | Located within 10 kms of critically polluted area | (2.) | WLS | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | ESZs | NA | 0 | NA | (6.) | Corridors | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | (4.) | Others | NA | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.16 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Presence of 8 Schedule-I species. Funds for 2 species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 405000 | (iii)Period of Implementation | 2 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 17 | (c)Temporary Employment- During Construction | 3 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 330 | (f)Total Manpower | 30 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.01 | (b)Percentage of Total Project Area | 6.06 | (c)No. of Plants to be Planted | 32 | (d)Funds Allocated for Plantation | 64000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Development of Green belt in and around the premises | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order against QCI NABET | (ii)Name of the EIA Consultant | Aqua Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Center Point, Nr. Kadiwala School, Ring Road, Surat-395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional details have been uploaded. | 30 Jun 2020 | 2. | NA | The EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and have asked the PP to revise the Report alongwith following clarification/information: -
(i) Revised water balance with details of total water and fresh water requirement and details of water recycling and reuse.
(ii) Effluent treatment mechanism with plan for Zero Liquid Discharge.
(iii) Revised layout plan with 40% greenbelt area.
(iv) Revised the EMP cost as the same is not adequate for the same.
The EAC therefore deferred the proposal. | 26 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Archit S Shah | Designation | Partner | Name of Company (Applicant Name should not be given here) | UNIVERSAL DYES AND INTERMEDIATES | Address | Plot No. 136, GIDC Estate, Nandesari, Dist: Vadodara - 391 340 |
|