Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Dyes and Dye Intermediates Manufacturing Unit - Universal Dyes and Intermediates
(b)Name of the Company / Organisation UNIVERSAL DYES AND INTERMEDIATES
(c)Registered Address Plot No. 136, GIDC Estate, Nandesari, Dist: Vadodara - 391 340,,Vadodara,Gujarat-391340
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Archit S Shah
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. 136, GIDC Estate, Nandesari, Dist- Vadodara - 391340,,Vadodara,Vadodara,Gujarat-391340
(d)Pin code 391340
(e)E-mail dsptraders@yahoo.com
(f)STD Code. 261(f)Telephone No. 2461241
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/131290/2019
(d)Master Proposal Number(Single Window) SW/153467/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 136
(b)Pincode 391340
(c)Bounded Latitudes (North)
From
Degree 22.407214
Minutes
Second
From
Degree 22.407736
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.097058
Minutes
Second
From
Degree 73.097625
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratVadodaraVadodara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/423/2019-IA-II(I)
(b)Date of Apply of TOR 19 Dec 2019
(c)Date of Issue of TOR / Standard ToR 10 Mar 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located in Notified Industrial area of GIDC Nandes
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SS Reactor3000 LTR3
(2.)SS Reactor2000 LTR2
(3.)MS Reactor3000 LTR5
(4.)Filter Press36” Inch5
(5.)Tray Dryer100 Trays2
(6.)MS Rubber Line Tank10000 Litre2
(7.)SS Reactor5000 LTR3
(8.)MS Reactor12000 LTR3
(9.)MS Reactor5000 LTR2
(10.)Centrifuge36” Inch3
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Group-A (Vat Golden Yellow GK or Vat Magenta B or Vat Pink R or Vat Orange RF or Vat Yellow 5G) and/or7.5OthersMT/MonthRoad
(2.)Group-B (Vat Violet 2R or Vat Olive T or Vat Olive Green B or Vat Blue RSN or Vat Navy Blue BR or Vat Brown BR or Ortho Benzoyl Benzoic Acid or Benzanthrone or Anthraquinone or 1- Nitro Anthraquinone or 1- Amino Anthraquinone or 1- Acetyl Napthalene or BromoBenzanthrone or DibromoBenzanthrone or Vat Blue 20 or Indigo Sols)35OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.04
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.70
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10644
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 10644
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acetic acid216Tons per AnnumGNFCRoad110 Open MarketCopy of Linkage
(2.)Acetyl Chloride268.8Tons per AnnumGujarat HalogensRoad25 Open MarketCopy of Linkage
(3.)Aluminum chloride1868.16Tons per AnnumPrarthana ChemicalsRoad19 Open MarketCopy of Linkage
(4.)Hydrochloric Acid1779.6Tons per AnnumGACLRoad18 Open MarketCopy of Linkage
(5.)Chlorine36.36Tons per AnnumGACLRoad18 Open MarketCopy of Linkage
(6.)Methanol560.04Tons per AnnumSudarshan ChemicalsRoad50 Open MarketCopy of Linkage
(7.)Sulfuric Acid3780Tons per AnnumGSFCRoad25 Open MarketCopy of Linkage
(8.)Sulfuryl Chloride1041.36Tons per AnnumVinayak ChemicalsRoad19 Open MarketCopy of Linkage
(9.)1-Amino Anthroquinone1249.08Tons per AnnumLocalRoad20 Open MarketCopy of Linkage
(10.)Soda ash963.24Tons per AnnumTATARoad12 Open MarketCopy of Linkage
(11.)Iodine5.64Tons per AnnumLocalRoad15 Open MarketCopy of Linkage
(12.)Nitric acid1050Tons per AnnumGSFCRoad25 Open MarketCopy of Linkage
(13.)Toluene2100Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(14.)Calcium Carbonate70.92Tons per AnnumLocalRoad8 Open MarketCopy of Linkage
(15.)Sodium Nitrite142.32Tons per AnnumDeepak NitriteRoad17 Open MarketCopy of Linkage
(16.)Bromine509.04Tons per AnnumPatel PesticidesRoad15 Open MarketCopy of Linkage
(17.)1 – Chloro Anthraquinone427.08Tons per AnnumLocalRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube47.4942.3046.7960
(2.)PM10Micro Gram per Meter Cube76.0172.3875.30100
(3.)SO2Micro Gram per Meter Cube22.1913.1120.1580
(4.)NOxMicro Gram per Meter Cube19.1511.0717.6580
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l908.0434.13300600
(2.)Chloridesmg/l673.2332.532501000
(3.)pHNA7.996.966.58.5
(4.)TSSmg/l62450100
(5.)TDSmg/l19021565002000
(6.)Fluoridemg/l0011.5
(7.)Heavy MetalsIronmg/l9.7200.31
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.247.45A
(2.)DOmg/l6.906.72A
(3.)BODmg/l3.982.78A
(4.)CODmg/l12.088.45A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.961.775
(2.)Leq(Night)A-weighted decibels(dB(A))60.258.765
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram13.829.69
(2.)Electric ConductivityMillisiemens per Centimetre0.750.45
(3.)pH8.587.15
(4.)N(Nitrogen)Milligram per Kilogram4.352.51
(5.)K(Potassium)Milligram per Kilogram4018.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply1125Copy of Permission LetterPipelineOthersGIDC Water SupplyNA23 Apr 2020112
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial9999ETPOthersDischarge into CETP of NIA099
(2.)Domestic2.72.7Septic tank/ soak pitOthersSeptic tank/ soak pit02.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 101.7
(b)Total Discharged Water (Kilolitre per Day) 101.7
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3000Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Sodium Chloride solutionIndustrial Waste208Tons8RoadOthersSent to ETP or sold to end user
(3.)Used OilIndustrial Waste0.02Kilolitre12RoadAuthorized Recyclers
(4.)Discarded Plastic Bag/ Liners/ DrumsIndustrial Waste10Tons15RoadAuthorized Recyclers
(5.)HBr (5%)Industrial Waste460Tons12RoadOthersSent to ETP or sold to end user
(6.)Sodium Bromide solutionIndustrial Waste420Tons12RoadOthersSent to ETP or sold to end user
(7.)Potassium Sulphate solutionIndustrial Waste852Tons12RoadOthersSent to ETP or sold to end user
(8.)Copper SulphateIndustrial Waste408Tons15RoadOthersSent to ETP or sold to end user
(9.)Aluminium Chloride solutionIndustrial Waste6300Tons15RoadOthersSent to ETP or sold to end user
(10.)Nitric Acid 30%Industrial Waste3504Tons10RoadOthersSent to ETP or sold to end user
(11.)Spent SolventIndustrial Waste1656Tons0RoadOthersRe-process and reuse within premises
(12.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons10RoadOthersCo-processing or common incineration site
(13.)Iron SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)126Tons10RoadOthersCo-processing or common incineration site
(14.)Hydrochloric Acid Solution (3%)Industrial Waste280Tons8RoadOthersSent to ETP or sold to end user
(15.)Zinc SulphateIndustrial Waste828Tons10RoadOthersSent to ETP or sold to end user
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube75.782.940.2276.01100
(2.)PM2.5Microgram per Meter Cube44.522.940.0744.6060
(3.)SO2Microgram per Meter Cube18.462.940.0318.5080
(4.)NOxMicrogram per Meter Cube15.492.940.0615.5680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (20 KVA)HSD120.1OthersSPM, SO2, NOx150, 262, 94
(2.)Process Vent-2--120.1SO240
(3.)Process Vent-3--120.1OthersNH3175
(4.)Hot Air DryerBriquettes of Bio-Coal150.12OthersSPM, SO2, NOx150, 262, 94
(5.)Process Vent-4--120.1NOx25
(6.)Boiler (1 TPH)Briquettes of Bio-Coal300.15OthersSPM SO2 NOx150, 262, 94
(7.)Process Vent-5--120.1OthersBr230
(8.)TFH (4 Lac KCal)Briquettes of Bio-Coal150.12OthersSPM, SO2, NOx150, 262, 94
(9.)Process Vent-1--120.1OthersHCl, Cl220, 9
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 20 KVA * 1 Nos.
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.165
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.165
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 80.32
(b)Waste/Barren Land (ha.) 135.48
(c)Grazing/ Community Land (ha.) 20
(d)Surface Water Bodies (ha.) 3.1
(e)Settlements (ha.) 11.34
(f)Industrial (ha.) 10.37
(g)Forest (ha.) 10
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0.74
(j)Others (ha.) : Open land, Marshy land, miscelleanous 42.88
    Total (ha.) 314.22999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.086
(2.)Area for Solid Waste Management0.028ETP area
(3.)Green belt0.016
(4.)OthersRm FG tank area security building0.035
Total (ha.) 0.165
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNandesari0.70Located within 10 kms of critically polluted area
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)ESZsNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.16
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Presence of 8 Schedule-I species. Funds for 2 species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 405000
(iii)Period of Implementation 2 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 17
(c)Temporary Employment- During Construction 3
(d)Temporary Employment- During Operation 5
(e)No. of working days 330
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.01
(b)Percentage of Total Project Area 6.06
(c)No. of Plants to be Planted 32
(d)Funds Allocated for Plantation 64000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalDevelopment of Green belt in and around the premises
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order against QCI NABET
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Center Point, Nr. Kadiwala School, Ring Road, Surat-395002
(iv)Mobile No. 9904433995
(v)Landline No. 0261246124
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Apr 2016
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAdditional details have been uploaded. 30 Jun 2020
2.NA

The EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and have asked the PP to revise the Report alongwith following clarification/information: -

                                             

(i)           Revised water balance with details of total water and fresh water requirement and details of water recycling and reuse.

(ii)         Effluent treatment mechanism with plan for Zero Liquid Discharge.

(iii)        Revised layout plan with 40% greenbelt area.

(iv)        Revised the EMP cost as the same is not adequate for the same.

 

The EAC therefore deferred the proposal.

26 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantArchit S Shah
DesignationPartner
Name of Company (Applicant Name should not be given here)UNIVERSAL DYES AND INTERMEDIATES
AddressPlot No. 136, GIDC Estate, Nandesari, Dist: Vadodara - 391 340
Print