Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Enhancement of Anandavadi Limestone Mines
(b)Name of the Company / Organisation TANCEM
(c)Registered Address Ariyalur,,Ariyalur,Tamil Nadu-621729
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant T Ravichandran
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address Ariyalur,,Perambur Purasaivakkam,Chennai,Tamil Nadu-621729
(d)Pin code 621729
(e)E-mail limetancem2018@gmail.com
(f)STD Code. 4329(f)Telephone No. 228531
(g)Fax No. 228776
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/MIN/153373/2018
(d)Master Proposal Number(Single Window) SW/153331/2020
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S.F No. 349, 350, 351 etc.
(b)Pincode 621729
(c)Bounded Latitudes (North)
From
Degree 11.18667
Minutes
Second
From
Degree 11.19083
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.1867
Minutes
Second
From
Degree 79.19889
Minutes
Second
(e)Survey of India Topo Sheet No. 58M/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 102
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/173/2018-IA.II(M)
(b)Date of Apply of TOR 06 Oct 2018
(c)Date of Issue of TOR / Standard ToR 26 Feb 2019
(d)Date of Apply of EC
(e)Date of Issue of EC
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :24 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :0
At project site
State :Tamil Nadu
District :Ariyalur
Tehsil :Sendurai
Village :Anandavadi
168Related to the employmentDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. 1136
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 7 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1.5MTPA/110.6850.261.241.5OthersMTARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Cement Plant----
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 28 Aug 2020
(iv)Valid Upto 31 Mar 2022
(v)File No. F.0323ARY/RS/DEE/TNPCB/ARY/W/2020
(vi)Application No. 2008132669783
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.33
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.01
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.0593
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA its a mining Project0Tons per Annum0Road0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube887087.08100
(2.)PM2.5Micro Gram per Meter Cube523651.5460
(3.)SO2Micro Gram per Meter Cube15714.5480
(4.)NOxMicro Gram per Meter Cube26152680
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.727.146.58.5
(2.)TDSmg/l623338200600
(3.)Fluoridemg/l0.760.4811.5
(4.)Heavy MetalsArsenicmg/l0.010.010.010.05
(5.)Othersleadmg/l0.010.010.010.05
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l3411475002000
(8.)Chloridesmg/l1665225001000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.747.51D
(2.)BODmg/l126D
(3.)OthersTotal Hardnessmg/l246168D
(4.)DOmg/l7.15.4D
(5.)CODmg/l3020D
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.348.355
(2.)Leq(Night)A-weighted decibels(dB(A))43.438.145
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.466.92
(2.)P(Phosphorus)Othersmg/100gm0.920.78
(3.)K(Potassium)Othersmg/100gm2.11.9
(4.)N(Nitrogen)Othersmg/100gm22.418.4
(5.)Electric ConductivityOthersmicro mhos/cm362293
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.1 To 8.55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.1 To 6.8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine reservoir and water tanker20.715 Not Appliacble modeOtherswater tankerOthersPumpnone28 Oct 20200
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)000Use for Green BeltGreen Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteMunicipal Solid Waste5.42Tons0RoadOthersMuncipal body will collect on daily basis.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube0000.10
(2.)PM2.5Microgram per Meter Cube0000.10
(3.)NOxMicrogram per Meter Cube2601.727.7480
(4.)PM10Microgram per Meter Cube8803.8691.87100
(5.)SO2Microgram per Meter Cube1801.5319.5480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNone0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 18.22
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 92.465
    Total Land (ha.) 110.685
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4.895
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Virgin land 100.795
    Total (ha.) 110.6900
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Safety Zone2.50
Total (ha.) 2.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0None
(2.)Wildlife CorridorsNone0None
(3.)Critically Polluted AreaNone0None
(4.)WLSNone0None
(5.)ESAsNone0None
(6.)CorridorsNone0None
(7.)NPANone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None
(2.)Defence InstallationsNone0None within 10 Km area
(3.)OthersNoneNone0None
(4.)ForestVannankurichi RF0NOC from the DFO has been obtained
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Patta Land has been acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavocristatus(Indian Peafowl)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 5
(iii)Period of Implementation As per direction of DFO
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Seasonal nallah flowing from NNE to SW
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area PeriyaEri
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 7
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 34
(e)No. of working days 300
(f)Total Manpower 41
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt036.536.5
(2.)Percentage of Total Project Area03333
(3.)No. of Plants05475054750
(4.)Funds Allocated032.8532.85
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalHigh purity limestone is essential for soda ash manufacturing.
(2.)SocialLocal Villagers are getting direct and indirect benefit by employment due to the proposed project.
(3.)FinancialRoyalty will be submitted to state government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMinor
2.
Mine Capacity in ROM (Run of Mine) 413030
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. TN/ALR/MP/LST/2050.MDS
(b)Date of Approval 24 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 110.685
(f)Approved Capacity 15
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 21.70
(b)Mineable Reserves (Million Ton) 18.49
(c)Extractable Reserves(Million Ton) 3.210
(d)Percent(%) of Extraction 59
(e)Grade of Coal /Ore /Mineral Limestone
(f)Stripping Ratio 1 : 0.52
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Not applicable
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 13
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 110.685
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Goverment Order has been alloted
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 110.685
(iii)Validity of the lease deed From : 23 Sep 1998 To : 15 Mar 2050
(iv)Date of Execution of Mining Lese 16 Mar 2000
(v)Reference Number 00DD687496
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof • As per the section 8 A (5) of new MMDR amendment
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 6.72
(iii)Height (in meter) 18
(iv)Quantity (in Million Cubic meter) 8.85
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 15.045
(b)Depth (in meter) 15
(c)Volume (in Million Cubic meter) 3.503
12.
Details of Quarry:
(a)Final Void of 15.045 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 15.045
13.
Details of Transportation:
(a)In Pit/Underground to Surface Manpower
(b)Surface to Siding/Loading Manpower
(c)Transportation / Conveyor Details By trolley/trusks
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)OTHERS(Specify)Area under mining,Top soil storage, dump storage4.89504.895
(3.)SURFACE WATER BODIES000
(4.)SETTLEMENTS000
(5.)AGRICULTURE LAND505
(6.)WASTE LAND100.7900100.79
(7.)GRAZING LAND000
TOTAL110.6850110.685
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)ROADS000.50.5
(3.)BUILT UP AREA (COLONY/OFFICE)0011
(4.)VIRGIN AREA0000
(5.)TOP SOIL STORAGE0000
(6.)EXTERNAL OB DUMPS0000
(7.)GREEN BELT48.50048.5
(8.)OtherNone0000
(9.)EXCAVATION/QUARRY0060.68560.685
TOTAL48.5062.1850110.685
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 88.51
(c)Quarry(in hectare) 60.685
(d)Safety Zone(in hectare) 2.50
(e)Final Void of 5.99 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 4.895
(h)Total afforestation plant (in hectare) 36.5
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan None
Total Area Excavated (in hectare) 60.685
Total Area Backfilled after Excavation (in hectare) 5.99
Total Area Reclaimed (in hectare) 5.99
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20050.260.260.260.010000
(2.)20020.260.260.2600
(3.)20000.260.260.2600
(4.)20010.260.260.260.5000200
(5.)20030.260.260.2600
(6.)20150.260.260.2600
(7.)20070.260.260.260.0548936700
(8.)20080.260.260.260.0550579000
(9.)20040.260.260.260.010000
(10.)20060.260.260.260.69959990
(11.)20160.260.260.2600
(12.)20200.260.260.260.1754632400
(13.)20090.260.260.260.0599949000
(14.)20100.260.260.260.0397018700
(15.)20110.260.260.2600
(16.)20180.260.260.260.025990
(17.)20120.260.260.2600
(18.)20130.260.260.2600
(19.)20140.260.260.2600
(20.)20170.260.260.260.0585145600
(21.)20190.260.260.260.0640483000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA083 Rev 01
(ii)Name of the EIA Consultant Mantec Consultants PVt. Ltd.
(iii)Address D- 36, Sector – 6, Noida – 201301
(iv)Mobile No. 9871095806
(v)Landline No. 0120421500
(vi)Email Id envmantec@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 20 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAOn scrutiny of the proposals, the following observations were made: ) Copy of advertisement for PH is not clear w.r.t. Newspaper it was published. 2) Attendance Sheet is not enclosed with PH proceedings 3) PP has not uploaded CTO copies for the period from 2015 to 2019 4) Conservation plan for Schedule-I Species is not approved by competent authority 5) Copy uploaded w.r.t. Eco-sensitive Zone is in native language. Translated copy not provided. 6) Copy of lease deed not illegiable 7) Certificate of Accreditation certified by QCI/NABET expired on 18.04.2020 8) EIA Report is incomplete (Does not have 12 chapter format) Further, it has observed that the proposal was considered in EAC meeting held on 15.11.2018 for grant of ToR and Committee deferred the proposal for want of requisite information. Please submit the details of EAC meeting wherein tor was recommended and lToR letter issued by the Ministry. You are requested to get the ToR first issued by the ministry and the cab be made application for EC as per the ToRs issued by the ministry but not with Standard ToR as per the provisions of EIA Notification, 2006. 05 Jun 2020
2.NAThe correction have been made as per the instruction received 11 Jul 2020
3.NAIt has observed that EDS raised previously is not complied fully. Point wise reply to EDS was not provided. SL No 18 of Form-II is not filled correctly, authenticated list of Schedule-1 Species needs to be submitted. Based on the authenticated list conservation plan needs to be prepared and proof of its submission to CWLW needs to be submitted, conservation plan approved by DFO is not acceptable. Annexure to EIA Report is not uploaded. Further, it has observed that the proposal was considered in EAC meeting held on 15.11.2018 for grant of ToR and Committee deferred the proposal for want of requisite information. Please submit the details of EAC meeting wherein tor was recommended and ToR letter issued by the Ministry. You are requested to get the ToR first issued by the ministry and then made application for EC as per the ToRs issued by the ministry but not with Standard ToR as per the provisions of EIA Notification, 2006. 16 Jul 2020
4.NAThe correction have been made as per the instruction received 28 Oct 2020
5.NAReply of EDS letter not found enclosed. 09 Nov 2020
6.NAThe correction have been made as per the instruction received 10 Nov 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantT Ravichandran
DesignationDGM
Name of Company (Applicant Name should not be given here)TANCEM
AddressAriyalur