Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Group Housing Nav Sansad Vihar
(b)Name of the Company / Organisation M/S NAV SANSAD VIHAR C.G.H.S. LTD.
(c)Registered Address Plot no 4 sector 22 Dwarkar NewDelhi,,South West,Delhi-110077
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Preeta Dhankhar
(b)Designation (Owner/ Partner/ CEO) Secretary
(c)Address Flat 373 Nav Sansad Vihar CGHS Ltd Plot 4 Sector 22 Dwarka New Delhi,,Najafgarh,South West,Delhi-110077
(d)Pin code 110077
(e)E-mail navsansadvihar04@gmail.com
(f)STD Code. 120(f)Telephone No. 4352889
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity1(a) Mining of minerals
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/153256/2020
(d)Master Proposal Number(Single Window) SW/153253/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No-4 Sector-22 Dwarka New Delhi
(b)Pincode 110077
(c)Bounded Latitudes (North)
From
Degree 150
Minutes
Second
From
Degree 50
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 100
Minutes
Second
From
Degree 250
Minutes
Second
(e)Survey of India Topo Sheet No. 12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 750
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 200
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhHemgirSiarmal,Tumulia
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-39/2020-IA-III
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 08 Jun 2020
(c)Date of Issue of EC 23 Nov 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Building Construction Project
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. 0
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 3 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)21501.0033367.9074053.32137421.228Othersmeter squareRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)10230.373010230.37310230.373Landscape area
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jan 2020
(iv)Valid Upto 07 Jan 2021
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel 1
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)001Tons per AnnumdieselRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2020 To 30 Apr 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube362132247100
(2.)SO2Micro Gram per Meter Cube19.810.21580
(3.)OthersCOMili Gram per Meter Cube1.450.851.1504
(4.)PM2.5Micro Gram per Meter Cube132.448.284.260
(5.)NOxMicro Gram per Meter Cube48.235.84280
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.56.57.690
(2.)TSSmg/l75050010602000
(3.)Total Hardnessmg/l352300200600
(4.)Heavy MetalsIronmg/l0.150.1210
(5.)Fluoridemg/l0.50.211.5
(6.)Chloridesmg/l2262002501000
(7.)TDSmg/l10607505002000
(8.)OthersMnmg/l0.040.020.10.3
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA62A
(2.)pHNA86A
(3.)BODmg/l2015A
(4.)CODmg/l250200A
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.75555
(2.)Leq(Night)A-weighted decibels(dB(A))52.44555
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare215200
(2.)N(Nitrogen)Kilogram per hectare242230
(3.)P(Phosphorus)Kilogram per hectare15.812
(4.)Electric ConductivityMillisiemens per Centimetre415400
(5.)pH86
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 700 To 750
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 650 To 700
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1482Copy of Permission LetterPipelineIntake Well114 May 2020115
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wastewater Generation10080CSTPReuse within the Plant & Recycling67.532.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 100
(b)Total Discharged Water (Kilolitre per Day) 32.5
(c)Total Reused Water (Kilolitre per Day) 67.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal wasteMunicipal Solid Waste717Kilolitre2RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube48.2153.2106.480
(2.)PM2.5Microgram per Meter Cube132.41137.4274.860
(3.)PM10Microgram per Meter Cube3621367734100
(4.)Others(Specify)CONA1.4516.412.8504
(5.)SO2Microgram per Meter Cube19.8124.849.680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel30.80.5PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1625
(b)Source BSES
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 30.8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 2.15
(e)Other Land (ha.) 0
    Total Land (ha.) 2.15
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 2.15
    Total (ha.) 2.1500
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNA0
(2.)Built Up Area4.69
Total (ha.) 4.69
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsPusa Hill Forest13.29None
(2.)Wildlife CorridorsAravali Biodiversity Park9None
(3.)CorridorsDelhi- Haryana4.65None
(4.)Critically Polluted AreaMuhammadpur Village2.65None
(5.)WLSAravali Biodiversity Park9None
(6.)NPACentral Reserve Ridge Forest13.75None
(7.)ESZsMitraon Forest13.40None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestCentral Reserve Ridge Forest13.73none
(2.)Defence InstallationsDelhi Cantonment10.40none
(3.)Archaeological SitesIndian Archaeological Society12.34none
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 10
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 200
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 60
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 30
(e)No. of working days 5
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt010230.3710230.37
(2.)Percentage of Total Project Area047.5847.58
(3.)No. of Plants0270270
(4.)Funds Allocated055
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalCSTP Greenbelt Landscape
(2.)SocialResidential building
(3.)FinancialGroup Housing Project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 24.80
(b)Total No. of Flats to be Build 256
(c)No. of Buildings 9
(d)Total plot area (sqm) 21501.00
(e)Total built up area (sqm) 46967.38
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 4
(b)Capacity 376.36
(c)No. of Recharge Pits 5
(d)Capacity 94.09
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 509 ECS
5.
Energy Saving Measures:
(a)Source/Mode DG Set
(b)Percentage 1
(c)Quantity 285
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 1
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/IA0017
(ii)Name of the EIA Consultant AMALTAS ENVIRO INDUSTRIAL CONSULTANT LLP (AEC) New
(iii)Address Noida
(iv)Mobile No. 9810085736
(v)Landline No. 0120435288
(vi)Email Id mervyn.atmos@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Application has been examined. 2. Please address following deficiencies found in your application No. IA/DL/MIS/153256/2020, Dated 14th May, 2020: I. Details of Environmental Consultant engaged in preparation of EIA and EMP have not been provided in the Application (ref. para 13 of the EIA Notification, 2006 and its subsequent amendments). II. Status of Environmental Clearance obtained, if any under EIA Notification 1994 and as amended vide notification dated 07.07.2004; III. Date of completion of construction for existing building is not available. Submit Building Completion and occupancy certificate; IV. Information supplied in Form-2 w.r.t. Details of Consent to Operate (CTO) are mismatching (See entries for 9.1/ (i) and (iv)); V. Copy of the existing CTO obtained from Delhi Pollution Control Committee has not been provided; VI. In FORM 2; Units for Maximum Elevation Above Means Sea Level (AMSL) and Distance of Nearest HFL within the study area from the project boundary, waste water generation and treatment have not been provided. You may like to submit the revised Application after addressing the above deficiencies. 04 Jun 2020
2.NAThe correction have been made as per the instruction received 06 Jun 2020
3.NAKindly refer to the EDS raised on 4th June, 2020 and your reply dated 6th June, 2020. The following deficiencies in your application No. IA/DL/MIS/153256/2020, are still not addressed: I. Status of Environmental Clearance obtained, if any under EIA Notification 1994 and as amended vide notification dated 07.07.2004; II. Date of completion of construction for existing building is not available. Submit Building Completion and occupancy certificate; III. Information supplied in Form-2 w.r.t. Details of Consent to Operate (CTO) are mismatching (See entries for 9.1/ (i) and (iv)); IV. Copy of the existing CTO obtained from Delhi Pollution Control Committee has not been provided; V. In FORM 2; Units for Maximum Elevation Above Means Sea Level (AMSL) and Distance of Nearest HFL within the study area from the project boundary, waste water generation and treatment have not been provided. You may like to submit the revised Application after addressing the above deficiencies. 08 Jun 2020
4.NAThe correction have been made as per the instruction received 08 Jun 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are submitting ADS Reply 04 Sep 2020
2.NA

Kindly see the minutes of 53rd EAC (Infra-2).

01 Aug 2020
3. ADS Reply LetterWe are submitting ADS Reply 06 Jul 2020
4.NA

Kindly see the minutes of 52nd meeting of the EAC (Infra-2).

26 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPreeta Dhankhar
DesignationSecretary
Name of Company (Applicant Name should not be given here)M/S NAV SANSAD VIHAR C.G.H.S. LTD.
AddressPlot no 4 sector 22 Dwarkar NewDelhi
Print