Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Pesticide Technical, Pesticide Intermediates(1600 MT/Month) Manufacturing Plant of M/s. Sandhya Organic Chemical Pvt Ltd,(Unit-2)
(b)Name of the Company / Organisation SANDHYA ORGANIC CHEMICALS PVT LTD
(c)Registered Address Plot no. 1249 & 1250, GIDC Sarigam- 396155, Taluka- Umbergaon, District- Valsad, State- Gujarat,,Valsad,Gujarat-396155
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajendra J Shah
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Plot no. 1249 and 1250, GIDC Sarigam- 396155, Taluka- Umbergaon, District- Valsad, State- Gujarat,,Umbergaon,Valsad,Gujarat-396155
(d)Pin code 396155
(e)E-mail adminwork@sandhya-group.com
(f)STD Code. 260(f)Telephone No. 2432805
(g)Fax No. 2420502
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/125353/2019
(d)Master Proposal Number(Single Window) SW/153214/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. plot no: 1249 & 1250 G.I.D.C. Sarigam
(b)Pincode 396155
(c)Bounded Latitudes (North)
From
Degree 20.305053
Minutes
Second
From
Degree 20.305690
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.852429
Minutes
Second
From
Degree 72.852985
Minutes
Second
(e)Survey of India Topo Sheet No. Sarigam-Vapi
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 34
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratValsadUmbergaon
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/342/2019-IA-II(I)
(b)Date of Apply of TOR 14 Nov 2019
(c)Date of Issue of TOR / Standard ToR 20 Dec 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Premises is located within the GIDC industrial Estate.
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Centrifuge5 Nos of 36/ 48 “--
(2.)Glass lined Reactor10 Nos of 6 and 3 KL, 5 Nos of 8 KL,5 Nos of 10 KL--
(3.)Vacuum Pump10 Nos of 3 HP--
(4.)Agitated Nutsch Filter6 nos of 5,8 and 10 capacity--
(5.)Receivers10 Nos--
(6.)Condensers Or Heat Exchangers20 Nos of MSGL or Graphite or SS or MS--
(7.)Steam Boiler1 Nos of 6000 Kg/hr--
(8.)Thermic Fluid Heater1 nos of 10.0 Lakh Kcal perHour
(9.)D.G Set2 nos of 500 KVA--
(10.)Water Scrubber and Caustic Scrubbers4 Nos--
(11.)S.S. Reactor6 Nos of 6 KL, 8 Nos of 20 to 25 KL,6 Nos of 10 KL--
(12.)Filter Press3 Nos--
(13.)Air Compressor2 Nos of 300 CFM--
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cypermethric Acid Chloride (CMAC)2400Tons per AnnumRoad
(2.)Meta Phenoxy Benzaldehyde (MPBAD)2400Tons per AnnumRoad
(3.)Cypermethrin (T) & Beta, Zeta, etc. Isomèrs (T) or ThetaCypermethrin (T) or Permethrin (T) or Alpha Cypermethrin (T) or Lambda Cyhalothrin (T) 84% & 98% or Deltamethrin (T) or Fenvalerate ( T)6000Tons per AnnumRoad
(4.)Temephose ( T) or Imidacloprid(T) or Acetamiprid ( T) or Thiamethoxam(T)3600Tons per AnnumRoad
(5.)4-4’ Thio Di Phenol (TDP) or 2-Chloro 5-Chloromethyl Pyridine ( CCMP) or 2-Chloro-5-Chloromethyl Thiazole (CCMT) or 3- Methyl 4- Nitroimino 1,3,5 Oxidiazine (MNIO) or N- Nitro Imino Imidazolidine (NII) or Bromo Benzene4800Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Dec 2019
(iv)Valid Upto 19 Dec 2020
(v)File No. No.IA-J-11011/342/2019-IA-II(I)
(vi)Application No. 342
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 900
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.50
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 59772
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 59772
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)DMF28219Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(2.)Phenol10872Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(3.)Benzene12000Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(4.)Mono Ethylene Glycol1848Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(5.)MDC18960Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(6.)HCI [ 30%]12065Tons per AnnumLocal marketRoad200 Open MarketCopy of Linkage
(7.)N-Hexane55124Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(8.)Iso propyl alcohol15860Tons per AnnumLocal marketRoad200 Open MarketCopy of Linkage
(9.)Acetonitrile9550Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(10.)Carbon Tetra Chloride4716Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(11.)Tri-Ethyle-Amine4537Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(12.)Ethylene Dichloride14328Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(13.)Toluene31878Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(14.)Methanol8823Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(15.)Thionyl chloride4572Tons per AnnumLocal marketRoad300 Open MarketCopy of Linkage
(16.)Cypermethric Acid Chloride (CMAC)3668Tons per AnnumLocal marketRoad250 Open MarketCopy of Linkage
(17.)Caustic Soda lye7494Tons per AnnumLocal marketRoad200 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2019 To 31 Dec 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube82.1570.6382100
(2.)NOxMicro Gram per Meter Cube17.7113.381780
(3.)PM2.5Micro Gram per Meter Cube44.3840.274460
(4.)SO2Micro Gram per Meter Cube15.1211.151580
(5.)OthersOzoneMicro Gram per Meter Cube12.479.5212180
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.427.0378.5
(2.)Heavy MetalsZnmg/l0.220.22515
(3.)OthersZnmg/l0.220.22515
(4.)TDSmg/l2025002000
(5.)Chloridesmg/l453.274.822501000
(6.)Total Hardnessmg/l37080300600
(7.)TSSmg/l206211250100
(8.)Fluoridemg/l0.050.0511.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.066.74A
(2.)DOmg/l3.21.8B
(3.)BODmg/l8.92.9B
(4.)CODmg/l302.66B
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.745.355
(2.)Leq(Night)A-weighted decibels(dB(A))44.138.150
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram48.6531.31
(2.)K(Potassium)Milligram per Kilogram376.99.2
(3.)N(Nitrogen)Milligram per Kilogram355109.2
(4.)pH7.286.71
(5.)Electric ConductivityMillisiemens per Centimetre1.270.03
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 22 To 24
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply41310Copy of Permission LetterPipelineOthersGIDC Water Supply2006305 Aug 2019413
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial217.2217.2fenton Treatment,MEE,ETP,SBTOthersCETP-Sarigam clean Initiative00217.2
(2.)Domestic1010Septic tank or soak pitOthersSeptic tank or soak pit0010
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 227.2
(b)Total Discharged Water (Kilolitre per Day) 227.2
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sodium Sulphite-20 percent SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)25560Tons100RoadOthersSend to end users.
(2.)Discarded Containers/LinersIndustrial Waste120Tons50RoadAuthorized Recyclers
(3.)Used or spent oilIndustrial Waste200Tons25RoadAuthorized Recyclers
(4.)ETP Sludge and MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7400Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Spent SolventIndustrial Waste138903Tons0RoadOthersInhouse distillation and reuse within premises.
(6.)HCl-30 percent solutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10714Tons50RoadOthersReuse and excess qty will be sold to end users.
(7.)Spent Sulfuric acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7915Tons60RoadOthersSend to end users.
(8.)Phosphoric acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12465Tons100RoadOthersSend to end users.
(9.)Benzoyl chlorideHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4059Tons110RoadOthersSend to end users
(10.)Sodium Sulphate soltionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)23812Tons90RoadOthersSend to end users
(11.)aluminium chloride-28 to 30 percent solutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10884Tons100RoadOthersSend to end users
(12.)Distillation Residue andSpent catalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4677Tons130RoadOthersCo-processing or Incineration
(13.)KCI-Inorganic SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)93934Tons80RoadOthersSend to end users.
(14.)NaCl SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1508.5Tons50RoadOthersSend to end users
(15.)Cypermethrin IsomerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2405Tons75RoadOthersSend to end users.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.142.020.0182.16100
(2.)SO2Microgram per Meter Cube15.122.020.0215.1480
(3.)NOxMicrogram per Meter Cube17.752.020.0117.7780
(4.)PM2.5Microgram per Meter Cube44.372.020.0144.3960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermo pack-1000 UNatural gas110.35OthersSPM SO2 NOx150 262 94 mg/Nm3
(2.)Reaction Vessel-1--130.2OthersHCl20
(3.)Reaction Vessel-3-120.15OthersSO2 HCL40 20
(4.)Reaction vessel-4--120.15OthersHCl Cl220 15
(5.)Steam Boiler-6 MT per hrNatural gas180.35OthersSPM SO2 NOx150 262 94 mg/Nm3
(6.)DG set-2 Nos-2x500 KVAHSD110.35OthersSPM SO2 NOx150 262 94 mg/Nm3
(7.)Reaction Vessel-2--130.2OthersHBr30
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source DGVCl
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG SET-2 Nos.-2x500 KVA-emergency back up
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.8640
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.8640
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 202.36
(b)Waste/Barren Land (ha.) 6.67
(c)Grazing/ Community Land (ha.) 13.54
(d)Surface Water Bodies (ha.) 1.62
(e)Settlements (ha.) 21.55
(f)Industrial (ha.) 7.80
(g)Forest (ha.) 14.97
(h)Mangroves (ha.) 9.91
(i)Marine Area (ha.) 21.17
(j)Others (ha.) : other 15.41
    Total (ha.) 315.00000000000006
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.2850
(2.)Built Up Area0.4640RM,FG
(3.)OthersRoad and open space0.1150road and open space
Total (ha.) 0.864
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0-
(2.)ESZsNA0--
(3.)CorridorsNA0--
(4.)ESAsNA0--
(5.)Wildlife CorridorsNA0--
(6.)Critically Polluted AreaVapi10--
(7.)WLSNA0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0--
(2.)ForestNA0--
(3.)Archaeological SitesNA0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Unit have budget for 2 Species.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 305000
(iii)Period of Implementation 1 Year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 80
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 20
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.28
(b)Percentage of Total Project Area 32.41
(c)No. of Plants to be Planted 570
(d)Funds Allocated for Plantation 1425000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCompany will provide employment to local villagers.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET application Applied
(ii)Name of the EIA Consultant Aqua Air Environmental Pvt. Ltd
(iii)Address 403,Center point,Near Kadivala School,Ring Road,Surat-395002(Gujarat)
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAdditional detail of Sr. No. 20.12 (16.06.2020) of Sandhya organic chemical Pvt. ltd.(Unit-2) as per the MINUTES OF THE 20th MEETING OF THE EXPERT APPRAISAL COMMITTEE (INDUSTRY-2 SECTOR-CHEMICAL BASED) HELD DURING JUNE 15-17, 2020 is attached herewith. 31 Aug 2020
2.NA

The EAC, after detailed deliberations decided to defer the proposal for want of requisite information as under and have asked the PP to revise the Report alongwith following clarification/information: -

 

(i)           Submit revised water balance by reducing fresh water requirement and Effluent treatment mechanism with plan for Zero Liquid Discharge.

(ii)          Solvent recovery plan needs to be submitted.

(iii)        PP needs to submit the following details on the Risk associated with the hazardous chemicals proposed to be used as a raw material;

·         Risk need to be carried out for medium and Catastrophic ruptures/leak even for Methanol, Bromine including Hydrochloric acid, Sulphuric acid and Benzoyl Chloride etc.

·         Frequency/Probability of leak per year as done for any risk analysis.

·         Individual risk contours and societal risk F-N curves to assess against risk acceptance criteria  using advanced 3D modeling.

·         Disaster management plan

 

(i)           Status of TSDF membership needs to be submitted.

 

The EAC therefore deferred the proposal.

26 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajendra J Shah
DesignationGM
Name of Company (Applicant Name should not be given here)SANDHYA ORGANIC CHEMICALS PVT LTD
AddressPlot no. 1249 & 1250, GIDC Sarigam- 396155, Taluka- Umbergaon, District- Valsad, State- Gujarat