Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Industrial Park over 4194.32 acre (1697.38 Ha) at Guttapadu Village, Orvakal Mandal, Kurnool District, Andhra Pradesh by M/s. Andhra Pradesh Industrial Infrastructure Corporation (APIIC
(b)Name of the Company / Organisation ANDRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED
(c)Registered Address APIIC Towers, 9, 10, 11 Floors, CFC-1, IT Park, Auto Nagar Mangalagiri,,Guntur,Andhra Pradesh-522503
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Chenchaiah R
(b)Designation (Owner/ Partner/ CEO) CE
(c)Address APIIC Towers, 9,10,11 Floors, CFC-1, IT Park, Auto Nagar, Mangalagiri,,Mangalagiri,Guntur,Andhra Pradesh-522503
(d)Pin code 522503
(e)E-mail bvsivareddy.apiic@nic.in
(f)STD Code. 40(f)Telephone No. 23237622
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/AP/NCP/99167/2019
(d)Master Proposal Number(Single Window) SW/153211/2020
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Land documents attached as annexure in EIA report
(b)Pincode 518010
(c)Bounded Latitudes (North)
From
Degree 15.616954
Minutes
Second
From
Degree 15.673398
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.103357
Minutes
Second
From
Degree 78.163336
Minutes
Second
(e)Survey of India Topo Sheet No. D44A01, D44A02. D44A06
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 405
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshKurnoolOrvakal
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-74/2018-IA.III
(c)Date of Apply of TOR 17 Apr 2019
(d)Date of Issue of TOR / Standard ToR 16 May 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :0
At Proposed Project Site
State :Andhra Pradesh
District :Kurnool
Tehsil :Orvakal
Village :Guttapadu
200Some of the major issues raised during Public Hearing include - employment related, compensation for land, grazing land for livestock,expected pollution from industries,objection for chemical industDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Project area1697.38 HaDevelopment of Industrial Park
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Development of Industrial Park1697.38HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 495
(b) Funds Allocated for Environment Management (Capital) (in Crores) 160
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.9
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 16
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANilRoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube36.623.336.660
(2.)OthersO3Micro Gram per Meter Cube22.113.222.1100
(3.)PM10Micro Gram per Meter Cube56.542.356.5100
(4.)SO2Micro Gram per Meter Cube16.67.216.680
(5.)NOxMicro Gram per Meter Cube24.516.124.580
    14.2.     No. of Ground Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l8.27.16.58.5
(2.)TDSmg/l23461075002000
(3.)Chloridesmg/l664242501000
(4.)Fluoridemg/l20.511.5
(5.)Heavy MetalsIronmg/l0.280.20.30.3
(6.)TSSmg/l581400
(7.)Total Hardnessmg/l91072200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l12098D
(2.)BODmg/l3226D
(3.)DOmg/l5.44.8D
(4.)pHmg/l7.97.2D
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.350.855/65
(2.)Leq(Night)A-weighted decibels(dB(A))43.640.845/55
    14.5.     No. of Soil Sample Monitored locations : 11
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare273188
(2.)pHMilligram per Litre8.57.4
(3.)P(Phosphorus)Kilogram per hectare36.315.9
(4.)K(Potassium)Kilogram per hectare674289
(5.)Electric ConductivityOthersMicrosiemens per centimeter32084
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 03 To 13
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1900036Copy of Permission LetterPipelineIntake WellCE(P)/KNL/DEE.1/AEE.3/IWS/154 Govt01 Jun 201642475270
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater10481100Common Sewage Treatment PlantGreen Belt Renewal Plant1048
(2.)Industrial wastewater68927000Common Effluent Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant6892
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7940
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7940
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid wasteMunicipal Solid Waste2326Tons30RoadOthersDisposed to local municipalities
(2.)Solid wasteFly Ash12.5Tons100RoadOthersCement industries
(3.)Liquid wasteOthersWaste oil51Tons300RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Solid wasteBottom Ash49.5Tons300RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Solid wasteIndustrial Waste1542Tons300RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube16.602036.6180
(2.)NOxMicrogram per Meter Cube24.5025.149.6180
(3.)PM2.5Microgram per Meter Cube36.503.940.4160
(4.)PM10Microgram per Meter Cube56.503.960.41100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal300.3PM100.507
(2.)BoilerCoal300.3SO23.19
(3.)BoilerCoal300.3NOx2.09
(4.)DG setHSD100.2PM100.066
(5.)DG setHSD100.2SO20.054
(6.)DG setHSD100.2NOx1.32
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 115000
(b)Source Nearest substations of Orvakal/Nannur/Kalvabugga
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 27250 kVA (250 kVA *8 = 2000 kVA, 500 kVA*25 = 125
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 264.16
(c)Government Land (ha.) 1433.22
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1697.38
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 243.41
(b)Waste/Barren Land (ha.) 1425.12
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 28.85
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 1697.3799999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1080.72Industrial plot area
(2.)Green belt277.4Greenbelt within common areas
(3.)Water Reservoir28.85Water bodies
(4.)OthersRoads, common facilities & logistic hub, etc310.41
Total (ha.) 1697.38
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Available0Not Applicable
(2.)CorridorsNot Available0Not Applicable
(3.)WLSGIB Rollapadu WLS19.7Great Indian Bustard (GIB)
(4.)NPANot Available0Not Applicable
(5.)ESZsNot Available0Not Applicable
(6.)Wildlife CorridorsNot Available0Not Applicable
(7.)Critically Polluted AreaNot Available0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestGani Reserve Forest6Southeast direction
(2.)Defence InstallationsNot Available0Not Applicable
(3.)Archaeological SitesNot Available0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1433.22
(b)Land yet to be acquired(Ha) 264.16
(c)Status of Land acquisition if not acquired Initial stage
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Seasonal natural streams are passing through the site which will not be diverted. Sufficient greenbelt and development zone will be provided all along the natural streams.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rock Garden Lake
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20000
(c)Temporary Employment- During Construction 2500
(d)Temporary Employment- During Operation 5500
(e)No. of working days 365
(f)Total Manpower 28000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 560
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 840000
(d)Funds Allocated for Plantation 550000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalConsolidated treatment of wastewater in CETP, common infrastructure like roads, storm water drains, pipelines etc. will be developed
(2.)SocialThe project will increase the employment opportunities and social status of nearby villages
(3.)FinancialCollection of revenue in the form of taxes to the government
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 169738
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 5
(b)Capacity 170
(c)No. of Recharge Pits 5
(d)Capacity 350
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 49760
5.
Energy Saving Measures:
(a)Source/Mode Solar street lighting, LED bulbs etc.
(b)Percentage 3
(c)Quantity 3450
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Suitable measures will be followed
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)White Category20B
(2.)Green Category03B
(3.)Red Category02A
(4.)Orange Category23B
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Andhra Pradesh
(d)Case No. WP. No. 659 of 2019, WP No. 663 of 2019
(e)Orders/Directions of the court ,if any and its relevance with the proposed project The Wirt Petitions not filed against the project
(f)Case Details Orders to pay the compensation towards DKT lands
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0140
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad – 500 032
(iv)Mobile No. 9949991029
(v)Landline No. 0402301536
(vi)Email Id vvijaykumar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 21 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReplies to 'ADS' issued by MOEFCC 07 Aug 2020
2.NA

The EAC, after detailed deliberation in 237th EAC meeting held on 29th June, 2020, observed the following:

     (i)        Proponent is required to submit an undertaking:

a)    that no construction has been undertaken for this project and there is no violation of EIA Notification, 2006 as amended from time to time.

b)    that no groundwater will be extracted and used for this project.

    (ii)        No integrated iron and steel plants shall be permitted, and only secondary steel-based industries shall be establishedalong with other industrial units proposed in this industrial park. Textile and apparel industries will be limited to stitching of cloths only and there shall be no manufacturing of the cloths.  Proponent should avoid establishing more water intensive industries within the proposed industries. The proponent is required to revise the layout accordingly.

   (iii)        The wastewater generated from the proposed industrial park will be treated and reused within the industrial park.  No wastewater shall be allowed to contaminate the downstream water bodies.

   (iv)        The proposed site is on rocky surface having undulating terrain and streams passing through the proposed project site.  The water bodies and drainage system in and around proposed site should not be disturbed and necessary measures for its protection are required to be taken. Proponent has to prepare a detailed hydrological report indicating the runoff that is generated through the drainage systems passing through the project site. In order to protect streams and natural drainage, proponent is required to develop green belt up to 9 m on either side of streams and water bodies.

    (v)        Water quality issues for the villages Konthalapadu and Guttapadu need special attention as these are located in the downstream of the project site. What measures are proposed for protection of water quality in the downstream villages.

   (vi)        As per the water balance chart presented before EAC, the industrial water requirement is to the tune of 9,800 KLD. As per the type of industrial units proposed, the water demand will be on higher side and need to be revised. Therefore, PP is required to prepare a detailed water budget and its management.

  (vii)        Why the project proponent is mixing the CSTP and CETP water for recycling/ reuse? Water balance chart is to be revised with proper explanation.

 (viii)        As per the drainage map, huge runoff is generated from the catchment at SW about 5 KM of the project boundary and the same is passing through the project site at the SE notch. No land use development is to be permitted and the drainage is to be protected in this part.

   (ix)        It was observed that a good number of deer population in the area. A detailed wildlife management plan be prepared in consultation with the State Wildlife division.

    (x)        It appears that the total land for the project has not been acquired. A clarification along with land acquisition details be submitted.

   (xi)        The project area is primarily inhabited by economically weaker community in 35 villages with a population of around 111908 and with a density of 144 persons per km2.  It was informed that no evacuation/shifting of people has been planned for this project, hence, there will not be any rehabilitation of communities /villages. However, EAC felt that there should be at least 500 m buffer between habitation and industries of the proposed industrial park.

  (xii)        CER activities do not address the issues raised during public hearing.  It is also observed that Rs. One crore has been provisioned for any other requirements of the community.  Proponent is required to allocate this fund to specific activities under CER for issues raised during public hearing.

 (xiii)        The water required for this project will be drawn from Srisailam foreshore (HNSS lift station) at Muchumarri village or HNSS canal. The required water will be drawn only after obtaining approval from the competent authority. Proponent is required to submit letter showing permission of competent authority to use water from this source.

(xiv)        Proponent has informed that total requirement for electricity is 115 MW.  It is not mentioned that how much of this (out of 115 MW) will be obtained from Solar panels to be proposed for installing under this project.

 (xv)        Air quality prediction modelling is done using DG sets only. It is required to do AQIP considering all sources of air pollution for this project.

(xvi)         The information presented before EAC does not capture the issue mentioned in public consultation proceedings. All the issues should be categorically complied and elaborated before EAC.

(xvii)        It was informed that the Environmental Management Cell was headed by the Chief Engineer of M/s APIIC. However, some of the EAC members recalled that M/s APIIC never had any structured and functional Environmental Cell to oversee day to day environmental issues. Details of Environmental Cell comprising suitably qualified persons to be submitted.

(xviii)        Public hearing issues raised along with commitment made by PP with time bound action plan and budget provision to be submitted.

In view of this, EAC deferred the proposal for want of additional information.

09 Jul 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChenchaiah R
DesignationCE
Name of Company (Applicant Name should not be given here)ANDRA PRADESH INDUSTRIAL INFRASTRUCTURE CORPORATION LIMITED
AddressAPIIC Towers, 9, 10, 11 Floors, CFC-1, IT Park, Auto Nagar Mangalagiri