1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Pesticide Intermediates and Specialty Chemicals in Existing Unit | (b)Name of the Company / Organisation | ACETOCHEM PRIVATE LIMITED | (c)Registered Address | Plot No. 274/3/1, GIDC Estate, Pandesara,,Ta. Chorasi, Dist. Surat, Gujarat,Surat,Gujarat-394221 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Bansibhai D Patel | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot No. 274/3/1, GIDC Estate, Pandesara,,Ta. Chorasi, Dist. Surat, Gujarat,Chorasi,Surat,Gujarat-394221 | (d)Pin code | 394221 | (e)E-mail | info@acetochemindia.com | (f)STD Code. | 261(f)Telephone No. | 2890998 | (g)Fax No. | 2892345 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/91826/2019 | (d)Master Proposal Number(Single Window) | SW/153208/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 274/3/1, GIDC Estate, Pandesara, Dist: Su | (b)Pincode | 394221 | (c)Bounded Latitudes (North) | | From | | Degree | 21.138614 | Minutes | | Second | | From | | Degree | 21.139356 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.831636 | Minutes | | Second | | From | | Degree | 72.832238 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 8 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Surat | Chorasi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/23/2019-IA-II(I) | (b)Date of Apply of TOR | 05 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 06 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is Located Within GIDC | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | HDPE Spiral Tank/storage tank | 10 Nos. | | (2.) | MS Rubber Line Vessel | 10 Nos. | | (3.) | Filter press | 5 Nos. | | (4.) | Thermo Pack | 1 No. | | (5.) | Steam Boiler | 1 No | | (6.) | Compressor | 5 NOS. | | (7.) | Diesel generator set | 1 No | | (8.) | Cooling Tower | 5 No | | (9.) | Chilling Plant | 2 Nos | | (10.) | Chilling Plant | 2 Nos | | (11.) | Pump | 100 Nos | | (12.) | Scrubber | 2 Nos. | | (13.) | Dryer | 20 Nos | | (14.) | Glass line vessel | 10 Nos. | | (15.) | S S Vessel/Reactor | 20 nos. | | (16.) | Condenser | 5 Nos | | (17.) | Centrifuge | 30 Nos | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Alpha Nitro Napthalene | 100 | Others | TPM | Road | | (2.) | Alpha Napthylamine | 165 | Others | TPM | Road | | (3.) | Phenyl Alpha Naphthylamine (PANA) | 90 | Others | TPM | Road | | (4.) | 2,4-Dichloro Acetophenone | 60 | Others | TPM | Road | | (5.) | 3, 5 Dichloro aniline | 50 | Others | TPM | Road | | (6.) | Transfluthrin Acid Chloride | 30 | Others | TPM | Road | | (7.) | 2- Chloro 5- Chloromethyl Pyridine | 30 | Others | TPM | Road | | (8.) | Nytrosyl Sulphuric Acid (from Sulfur) * | 600 | Others | TPM | Road | | (9.) | Epichlorohydrin Based Polyamide resin | 116 | Others | TPM | Road | | (10.) | 3-Methyl 4- Nitro Imino Per hydro1,3,5 Oxidiazine | 20 | Others | TPM | Road | | (11.) | Nytrosyl Sulphuric Acid (from Sodium Thio Sulphate Solution and Spent Acid (H2SO4)) ** | 468 | Others | TPM | Road | | (12.) | Acetophenone | 60 | Others | TPM | Road | | (13.) | Anisole | 100 | Others | TPM | Road | | (14.) | 1,2,4 Triazole | 50 | Others | TPM | Road | | (15.) | 4-Methyl Acetophenone / Acetyl Furan | 60 | Others | TPM | Road | | (16.) | IGBA - 3-(2-methylpropyl) pentanedioic acid / KSM - 3-(2-amino-2-oxoethyl)-5-methylhexanoic acid | 68.26 | Others | TPM | Road | | (17.) | D- Allethrollone | 10 | Others | TPM | Road | | (18.) | Diethyl Ketone | 179 | Others | TPM | Road | | (19.) | Methyl Propyl Ketone /Dipropyl Ketone/Propiophenone | 100 | Others | TPM | Road | | (20.) | 4-Methoxy Acetophenone | 60 | Others | TPM | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jun 2015 | (iv)Valid Upto | 11 Jan 2020 | (v)File No. | AWH - 71094 | (vi)Application No. | 93289 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1.50 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.33 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.03 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.26 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 134970.96 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 134970.96 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Anisole | 2490.84 | Tons per Annum | | Local Market | Road | | 80 | Open Market | | Copy of Linkage | (2.) | Chlorine | 865.56 | Tons per Annum | | Local Market | Road | | 200 | Open Market | | Copy of Linkage | (3.) | Acetic anhydride | 4331.18 | Tons per Annum | | Local Market | Road | | 83 | Open Market | | Copy of Linkage | (4.) | Toluene | 20114.46 | Tons per Annum | | Local Market | Road | | 90 | Open Market | | Copy of Linkage | (5.) | Methanol | 6901.08 | Tons per Annum | | Local Market | Road | | 60 | Open Market | | Copy of Linkage | (6.) | Sulphuric Acid | 10995.84 | Tons per Annum | | Local Market | Road | | 70 | Open Market | | Copy of Linkage | (7.) | Dimethyl carbonate | 1149.48 | Tons per Annum | | Local Market | Road | | 150 | Open Market | | Copy of Linkage | (8.) | Naphthalene | 4671.12 | Tons per Annum | | Local Market | Road | | 90 | Open Market | | Copy of Linkage | (9.) | Propionic Acid | 5409 | Tons per Annum | | Local Market | Road | | 150 | Open Market | | Copy of Linkage | (10.) | Acetic acid | 834.4 | Tons per Annum | | Local Market | Road | | 150 | Open Market | | Copy of Linkage | (11.) | Benzoic acid | 1092.84 | Tons per Annum | | Local Market | Road | | 80 | Open Market | | Copy of Linkage | (12.) | EDC | 8345.88 | Tons per Annum | | Local Market | Road | | 150 | Open Market | | Copy of Linkage | (13.) | Nitric acid | 13756.68 | Tons per Annum | | Local Market | Road | | 65 | Open Market | | Copy of Linkage | (14.) | Hydrogen | 193.2 | Tons per Annum | | Local Market | Road | | 65 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2019 To 29 Feb 2020 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 51.8 | 44.22 | 51 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 84.41 | 77.08 | 84 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 16.30 | 12.89 | 16 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 18.45 | 14.72 | 18 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.99 | 7.38 | 6.5 | 8.5 | (2.) | Chlorides | | | mg/l | | 574.88 | 308.47 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (4.) | Heavy Metals | | Zinc | mg/l | | 0 | 0 | 5 | 15 | (5.) | TSS | | | mg/l | | 14 | 6 | 80 | 120 | (6.) | TDS | | | mg/l | | 1630 | 898 | 500 | 2000 | (7.) | Total Hardness | | | mg/l | | 576.29 | 160.64 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.2 | 5.2 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | pH | | NA | | 7.59 | 7.59 | A | (4.) | COD | | mg/l | | 2 | 2 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55 | 45 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44 | 42 | 45 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 721 | 326.9 | (2.) | pH | | | 8.07 | 7.18 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 343.2 | 198.5 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 3.80 | 1.35 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 2.84 | 1.17 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | SMC Water Supply | 140 | 3 | Copy of Permission Letter | Pipeline | | Others | Pipeline | SMC Water Supply | 17 Jan 2019 | 140 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 10 | 10 | Septic Tank & Soak pit System | Others | Septic Tank & Soak pit System | 0 | 10 | (2.) | Industrial | 60 | 60 | ETP | Others | CETP of M/s. PIL | 0 | 60 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 70 | (b)Total Discharged Water (Kilolitre per Day) | 70 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 40 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Diethyl Ketone | Industrial Waste | | 948 | Tons | 0 | Road | | Authorized Recyclers | | (3.) | Benzene | Industrial Waste | | 84 | Tons | 0 | Road | | Others | Reuse in Process | (4.) | Used Oil | Industrial Waste | | 100 | Kilolitre | 20 | Road | | Authorized Recyclers | | (5.) | Spent Catalyst | Industrial Waste | | 432 | Tons | 60 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | NSA | Industrial Waste | | 528 | Tons | 0 | Road | | Others | Reused in to same process | (7.) | Nitric Acid | Industrial Waste | | 8160 | Tons | 0 | Road | | Others | Reused in to same process | (8.) | Acetic Acid | Industrial Waste | | 1062 | Tons | 60 | Road | | Others | Under Rule - 9 | (9.) | Discarded Containers/ Barrels/Liners/Carboy/Bags | Industrial Waste | | 6.4 | Tons | 25 | Road | | Authorized Recyclers | | (10.) | Sodium Thiosulfate Solution | Industrial Waste | | 6012 | Tons | 0 | Road | | Others | Reuse in Process | (11.) | Spent Acid | Industrial Waste | | 3432 | Tons | 0 | Road | | Others | Reuse in Process | (12.) | Spent H2SO4 | Industrial Waste | | 8340 | Tons | 0 | Road | | Others | Reuse in Process | (13.) | Distillation Residue | Industrial Waste | | 840 | Tons | 40 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (14.) | Aniline/ODCB | Industrial Waste | | 4632 | Tons | 0 | Road | | Others | Reuse in Process | (15.) | MCB | Industrial Waste | | 4080 | Tons | 0 | Road | | Others | Reuse in Process | (16.) | Acetic Anhydride | Industrial Waste | | 1308 | Tons | 0 | Road | | Others | Reuse in Process | (17.) | Methanol | Industrial Waste | | 396 | Tons | 0 | Road | | Authorized Recyclers | Reuse in Process | (18.) | Toluene | Industrial Waste | | 17304 | Tons | 0 | Road | | Others | Reuse in Process | (19.) | 1,3- Dichlorobenzene | Industrial Waste | | 90 | Tons | 0 | Road | | Others | Reused in to same process | (20.) | Thio Layer | Industrial Waste | | 4608 | Tons | 0 | Road | | Others | Reuse in Process | (21.) | IPA/Methanol | Industrial Waste | | 3288 | Tons | 0 | Road | | Others | Reuse in Process | (22.) | Aniline | Industrial Waste | | 684 | Tons | 0 | Road | | Others | Reuse in Process | (23.) | EDC | Industrial Waste | | 2736 | Tons | 0 | Road | | Others | Reuse in Process | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 51.8 | 2.72 | 0.04 | 51.84 | 60 | (2.) | NOx | | Microgram per Meter Cube | 16.30 | 2.72 | 0.01 | 16.32 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 84.41 | 2.72 | 0.02 | 84.43 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 18.45 | 2.72 | 0.04 | 18.5 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler | Natural Gas | 12 | 0.2 | Others | PM-SO2-NOx | 150-100-50 | (2.) | Thermo Pack | Natural gas | 12 | 0.2 | Others | PM-SO2-NOx | 150-100-50 | (3.) | D.G Set | Diesel | 7 | 0.12 | Others | PM-SO2-NOx | 150-100-50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 90 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.27 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.27 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1951.024 | (b)Waste/Barren Land (ha.) | 1877.254 | (c)Grazing/ Community Land (ha.) | 1097.383 | (d)Surface Water Bodies (ha.) | 15552.28 | (e)Settlements (ha.) | 876.09 | (f)Industrial (ha.) | 845.68 | (g)Forest (ha.) | 4120.504 | (h)Mangroves (ha.) | 670.1761 | (i)Marine Area (ha.) | 3160.648 | (j)Others (ha.) : Habitation | 1277.47 | Total (ha.) | 31428.509100000003 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.0432 | | (2.) | Green belt | | 0.0540 | | (3.) | Area for Solid Waste Management | | 0.0212 | | (4.) | Others | ETP, RM Storage, FG Storage, Tank Farm, utility | 0.1516 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | NA | 0 | -- | (2.) | Critically Polluted Area | NA | 0 | -- | (3.) | WLS | NA | 0 | -- | (4.) | ESZs | NA | 0 | -- | (5.) | Corridors | NA | 0 | -- | (6.) | NPA | NA | 0 | -- | (7.) | ESAs | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | -- | (2.) | Archaeological Sites | | NA | 0 | -- | (3.) | Defence Installations | | NA | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.27 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 8 Schedule - I Species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 9.20 Lakh | (iii)Period of Implementation | 2 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 350 | (f)Total Manpower | 40 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.05 | (b)Percentage of Total Project Area | 18.52 | (c)No. of Plants to be Planted | 215 | (d)Funds Allocated for Plantation | 600000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against NABET/QCI | (ii)Name of the EIA Consultant | M/s. Aqua Air Environmental Engineers. Pvt. Ltd. | (iii)Address | 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJ.) INDIA | (iv)Mobile No. | 9904496967 | (v)Landline No. | 0261246085 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 03 Mar 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 01 Jul 2020 | 2. | NA | The project/activities are covered under category A of item 5(b) ‘Pesticides industry and Pesticide specific intermediates’ of the Schedule to the Environment Impact Assessment Notification, 2006, and requires appraisal at central level by the sectoral Expert Appraisal Committee (EAC) in the Ministry.
The standard terms of references (TORs) for the Project was granted by the Ministry on 6th April, 2019. Total land area is estimated to be 2700 sqm. Industry will develop greenbelt in an area of 20% i.e., 540 sqm out of total area of the project and remaining (20%) (107 trees) will be develop at Survey Number 287, lajpore Village, Surat. Therefore total green belt will be 40%. Therefore total green belt will be 40%.
The Committee during deliberation noted that the project proponent has proposed only 20% area i.e., 540 sqm. land for greenbelt inside the plant premises and 20% green belt will be developed at outside the premises in nearby area. The committee suggested to submit the revised layout plan with 33% greenbelt area.
The EAC therefore deferred the proposal. | 26 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Bansibhai D Patel | Designation | Director | Name of Company (Applicant Name should not be given here) | ACETOCHEM PRIVATE LIMITED | Address | Plot No. 274/3/1, GIDC Estate, Pandesara, |
|