1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | INCLUSION OF TITANIUM SLAG IN PRODUCT MIX AND CHANGE IN CONFIGURATION OF 36,000 TPA FERRO ALLOY PLANT of SHRI BAJRANG POWER & ISPAT LIMITED | (b)Name of the Company / Organisation | SHRI BAJRANG POWER ISPAT LIMITED | (c)Registered Address | Borjhara, Urla - Guma Road
Raipur (CG),,Raipur,Chhattisgarh-493221 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shravan Kumar Goyal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Borjhara, Urla - Guma Road
Raipur,,Raipur,Raipur,Chhattisgarh-493221 | (d)Pin code | 493221 | (e)E-mail | bajrangtelang@gmail.com | (f)STD Code. | 771(f)Telephone No. | 4288019 | (g)Fax No. | 2323601 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/153096/2020 | (d)Master Proposal Number(Single Window) | SW/153094/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Change of Product Mix under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 521/44 | (b)Pincode | 492001 | (c)Bounded Latitudes (North) | | From | | Degree | 2376238 | Minutes | | Second | | From | | Degree | 2377390 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 578924 | Minutes | | Second | | From | | Degree | 580493 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64G/10,64G/14,64G/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 287 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | F-No 5-69/2010 (ENV)/6272 DATED 21.02.2020 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 13 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Power - AFBC | 42 | 0 | 42 | Mega Watt(MW) | | Others | Internal | (2.) | Power - WHRB | 48 | 0 | 48 | Mega Watt(MW) | | Others | Internal | (3.) | Ferro Alloy Plant - Titanium Slag | 0 | 18000 | 18000 | Tons per Annum(TPA) | | Road | Internal | (4.) | Power - Coke Oven | 25 | 0 | 25 | Mega Watt(MW) | | Others | Internal | (5.) | Ferro Alloy Plant - Ferro Silico Managanese | 18000 | 0 | 18000 | Tons per Annum(TPA) | | Road | Internal | (6.) | Pelletisation Plant with Coal Gasifier | 1400000 | 0 | 1400000 | Tons per Annum(TPA) | | Road | Internal | (7.) | Oxygen Plant | 500 | 0 | 500 | Others | TPD | Road | Internal | (8.) | Fly Ash Bricks Plant | 10000000 | 0 | 10000000 | Others | NPA | Road | Internal | (9.) | Sponge Iron | 600000 | 0 | 600000 | Tons per Annum(TPA) | | Others | Internal | (10.) | Blast Furnace | 550000 | 0 | 550000 | Tons per Annum(TPA) | | Road | Internal | (11.) | Hot Re-Rolling Mill | 400000 | 0 | 400000 | Tons per Annum(TPA) | | Road | Internal | (12.) | Steel Melting Shop - Continuous Casting Machine | 1000000 | 0 | 1000000 | Tons per Annum(TPA) | | Road | Internal | (13.) | Coke Oven Battery | 500000 | 0 | 500000 | Tons per Annum(TPA) | | Road | Internal | (14.) | Sintering Plant | 700000 | 0 | 700000 | Tons per Annum(TPA) | | Road | Internal | (15.) | Coal Washery | 2400000 | 0 | 2400000 | Tons per Annum(TPA) | | Road | Internal | (16.) | Power - Blast F/C | 10 | 0 | 10 | Mega Watt(MW) | | Others | Internal | (17.) | Iron Ore Beneficiation Plant | 2000000 | 0 | 2000000 | Tons per Annum(TPA) | | Road | Internal | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Power | AFBC – 42 MW | - | AFBC – 42 MW | Reduction in capacity from 42 to 33 | (2.) | Sponge Iron | 3 x 0.2 MTPA (3 X 600 TPD X 330 Days) | - | 3 x 0.2 MTPA (3 X 600 TPD X 330 Days) | No Change | (3.) | Power | WHRB – 3 X 16 MW | - | WHRB – 3 X 16 MW | No Change | (4.) | Pelletisation Plant | 1.40 MTPA with Coal Gasifier (3x17000 Nm3/Hr) | - | 1.40 MTPA with Coal Gasifier (3x17000 Nm3/Hr) | No change | (5.) | Blast Furnace | 0.55 MTPA | - | 0.55 MTPA | No change | (6.) | Sintering Plant | 0.7 MTPA | - | 0.7 MTPA | No change | (7.) | Power | Blast F/C – 10 MW | - | Blast F/C – 10 MW | Dropped | (8.) | Power | Coke Oven – 25 MW | - | Coke Oven – 25 MW | Dropped | (9.) | Ferro Alloy Plant | 2 x 18000 TPA, 1 X 9 MVA + 1 X 9 MVA | 2 x 18000 TPA, 1 X 9 MVA + 1 X 12 MVA | 2 x 18000 TPA, 1 X 9 MVA + 1 X 12 MVA | Change in Configuration and inclusion of Titanium Slag in product mix of Silico & Ferro Manganese | (10.) | Coal washery- | 2.4 MTPA | - | 2.4 MTPA | No change | (11.) | Oxygen Plant | 500 TPD | - | 500 TPD | No change | (12.) | Fly Ash Bricks Plant | 10000000 NPA | - | 10000000 NPA | No change | (13.) | Hot Re-Rolling Mill | 2 x 0.20 = 0.40 MTPA | - | 2 x 0.20 = 0.40 MTPA | No Change | (14.) | Iron ore beneficiation Plant | 2.0 MTPA | - | 2.0 MTPA | No change | (15.) | Steel Melting Shop | 2.0 MTPA continuous Casting Machine- 1.0MTPA | - | 2.0 MTPA continuous Casting Machine- 1.0MTPA | No change | (16.) | Coke Oven Battery | 0.5 MTPA | - | 0.5 MTPA | No change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Feb 2020 | (iv)Valid Upto | 28 Feb 2021 | (v)File No. | 10234 /TS/CECB/2020 | (vi)Application No. | 4489384 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 43200 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 43200 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Graphite Electrode | 450 | Tons per Annum | | Indigenous | Road | | 0 | Open Market | | Copy of Linkage | (2.) | Flue Dust | 450 | Tons per Annum | | De-Dusting System | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (3.) | Ilmenite | 3600 | Tons per Annum | | IREL & Other Suppliers | Road,Rail | | 456 | Open Market | | Copy of Linkage | (4.) | Coke | 6300 | Tons per Annum | | Jharkhand | Road,Rail | | 634 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 6.5 To 9.9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.5 To 8.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 312 | 15 | Copy of Permission Letter | Pipeline | | Tube Well | | 5666/302/WR/TECH/03/IWS/D-4 | 19 Aug 2010 | 16000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 10 | 40 | STP | Green Belt Renewal Plant | | 10 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | NA | Others | NONE | 0 | Tons | 0 | Others | NONE | Others | NONE | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 24 | 0.20 | 15.7 | 39.8 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 22 | 0.20 | 0.64 | 22.65 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 14 | 0.20 | 10.6 | 24.7 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 88 | 0.20 | 3.2 | 91.3 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Silico Manganese | Coal & Coke | 32 | 0.80 | SO2 | | 29.2 | (2.) | Titanium Slag | Coke | 32 | 0.80 | SO2 | | 11.13 | (3.) | Silico Manganese | Coal & Coke | 32 | 0.80 | NOx | | 18.94 | (4.) | Silico Manganese | Coal & Coke | 32 | 0.80 | PM10 | | 0.8 | (5.) | Titanium Slag | Coke | 32 | 0.80 | PM10 | | 0.80 | (6.) | Titanium Slag | Coke | 32 | 0.80 | NOx | | 5.56 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 18000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 100 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 123.21 | (c)Government Land (ha.) | 17.98 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 141.19 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Existing Plant Area | 141.19 | Total (ha.) | 141.1900 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 141.19 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | None | 0 | - | (2.) | Corridors | None | 0 | - | (3.) | Wildlife Corridors | None | 0 | - | (4.) | Critically Polluted Area | None | 0 | - | (5.) | WLS | None | 0 | - | (6.) | NPA | None | 0 | - | (7.) | ESAs | None | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | - | (2.) | Archaeological Sites | | None | 0 | - | (3.) | Defence Installations | | None | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 141.19 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharun river | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 8.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 800 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 800 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 46.59 | 0 | 46.59 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 70000 | 0 | 70000 | (4.) | Funds Allocated | 200 | 0 | 200 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | No Solid Waste generation from the proposed project | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0174 | (ii)Name of the EIA Consultant | B. S. Envi-Tech Pvt. Ltd, | (iii)Address | 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017 | (iv)Mobile No. | 9848053012 | (v)Landline No. | 0404978306 | (vi)Email Id | info@bsenvitech.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 16 Nov 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal is returned due to the following shortcomings:
Form 2:
i. In s.no.6, existing EC shall be uploaded.
ii. In s.No.4, not able to access the KML file. Appropriate KML file shall be uploaded.
iii. In s.no. 8, existing and proposed configuration as well as product details shall be furnished.
iv. In s.no.9, complete certified compliance report shall be uploaded.
v. In s.no. 9, the details of capacity expansion is wrongly mentioned and the same may be corrected.
vi. In s.no.17, solid waste generation details shall be furnished.
vii. In s.no. 18.1, AAQ modelling data is wrongly filled in and the same shall be corrected.
viii. In s.no. 32, kindly furnish the time bound action plan for green belt development covering 33% of the 141.19 ha with appropriate layout.
Addendum to EIA report
The report uploaded on PARIVESH does not requisite information. In view of this, addendum to the existing EIA report shall be prepared covering the following:
i. QCI/NABET accreditation status of the EIA consultant
ii. Details of the existing Environmental Clearances (ECs) obtained.
iii. Implementation status of the existing Environmental Clearances.
iv. Details of the earlier Public consultation conducted and the compliance to the issues raised in the PH.
v. Certified compliance report of existing environmental clearances from the concerned Regional Office of the MoEF&CC.
vi. Closure report of Regional Office in case of non-compliances observed in the certified compliance report.
vii. Existing baseline conditions based on the periodic environmental monitoring program
viii. Proposed Expansion or Modernization or Change of product mix vis-à-vis with granted EC capacity along with percentage of increase in production.
ix. Proposed plant lay out vis-à-vis with layout for which Environmental Clearance was granted.
x. Proposed resources requirement (Land/raw materials/water/power) vis-à-vis with granted Environmental Clearance
xi. Pollution load calculations (Air/Water/Solid & hazardous waste/traffic) vis-à-vis with granted Environmental Clearance
xii. Environmental Management Plan for the proposed Expansion or Modernization or Change of product mix along with budget provision for implementation.
xiii. Proposed Corporate Environment Responsibility activities for the additional investment proposed.
xiv. Litigation if any, pending in any Court related to the project (or) activity.
Pre-feasibility report has not been uploaded and the same be uploaded on PARIVESH. | 16 Jun 2020 | 2. | NA | Proposal is returned due to the following shortcomings:
Form 2:
i. In s.no.6, existing EC shall be uploaded.
ii. In s.No.4, not able to access the KML file. Appropriate KML file shall be uploaded.
iii. In s.no. 8, existing and proposed configuration as well as product details shall be furnished.
iv. In s.no.9, complete certified compliance report shall be uploaded.
v. In s.no. 9, the details of capacity expansion is wrongly mentioned and the same may be corrected.
vi. In s.no.17, solid waste generation details shall be furnished.
vii. In s.no. 18.1, AAQ modelling data is wrongly filled in and the same shall be corrected.
viii. In s.no. 32, kindly furnish the time bound action plan for green belt development covering 33% of the 141.19 ha with appropriate layout.
Addendum to EIA report
The report uploaded on PARIVESH does not requisite information. In view of this, addendum to the existing EIA report shall be prepared covering the following:
i. QCI/NABET accreditation status of the EIA consultant
ii. Details of the existing Environmental Clearances (ECs) obtained.
iii. Implementation status of the existing Environmental Clearances.
iv. Details of the earlier Public consultation conducted and the compliance to the issues raised in the PH.
v. Certified compliance report of existing environmental clearances from the concerned Regional Office of the MoEF&CC.
vi. Closure report of Regional Office in case of non-compliances observed in the certified compliance report.
vii. Existing baseline conditions based on the periodic environmental monitoring program
viii. Proposed Expansion or Modernization or Change of product mix vis-à-vis with granted EC capacity along with percentage of increase in production.
ix. Proposed plant lay out vis-à-vis with layout for which Environmental Clearance was granted.
x. Proposed resources requirement (Land/raw materials/water/power) vis-à-vis with granted Environmental Clearance
xi. Pollution load calculations (Air/Water/Solid & hazardous waste/traffic) vis-à-vis with granted Environmental Clearance
xii. Environmental Management Plan for the proposed Expansion or Modernization or Change of product mix along with budget provision for implementation.
xiii. Proposed Corporate Environment Responsibility activities for the additional investment proposed.
xiv. Litigation if any, pending in any Court related to the project (or) activity.
Pre-feasibility report has not been uploaded and the same be uploaded on PARIVESH. | 16 Jun 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shravan Kumar Goyal | Designation | Director | Name of Company (Applicant Name should not be given here) | SHRI BAJRANG POWER ISPAT LIMITED | Address | Borjhara, Urla - Guma Road
Raipur (CG) |
|