Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed additional Pesticides & expansion of Specialty chemicals 2038.61 M/month to 18234.0 MT/Month in existing unit at Plot No.2201, GIDC Estate, Sarigam, Tal: Umargaon, Dist. Valsad-396 155, Gujar
(b)Name of the Company / Organisation VAL ORGANICS PVT LTD
(c)Registered Address Plot no.2201, GIDC Sarigam, Ta-Umaargaon, Dist-Valsad-396155,,Valsad,Gujarat-396155
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vivek M Chadha
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot no.2201, GIDC Sarigam, Ta-Umargaon, Dist-Valsad-396155,,Umbergaon,Valsad,Gujarat-396155
(d)Pin code 396155
(e)E-mail vivek.chadha@valorganics.com
(f)STD Code. 261(f)Telephone No. 24106465
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/153091/2019
(d)Master Proposal Number(Single Window) SW/153089/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 2201, Sarigam GIDC, Ta-Umbergaon, Dist-Va
(b)Pincode 396155
(c)Bounded Latitudes (North)
From
Degree 20181958
Minutes
Second
From
Degree 20182394
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 725059.48
Minutes
Second
From
Degree 7251282
Minutes
Second
(e)Survey of India Topo Sheet No. SARIGAM-VAPI
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 38
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/129/2020-IA-II(I)]
(c)Date of Issue of TOR 19 Jul 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 13 May 2020
(c)Date of Issue of EC 14 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located In GIDC Area Sarigam
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-184/2009(ENV)/950
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 22 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Group-4 Specialty Phenols/ Specialty Chloro Phenol0200200OthersMT/MonthRoad
(2.)Group-2 Chlorinated Compounds0200200OthersMT/MonthRoad
(3.)Group-6 Acetylated Compounds255545800OthersMT/MonthRoad
(4.)Group-9 Isomerized Products16.5483.5500OthersMT/MonthRoad
(5.)By Products77.691186.311264OthersMT/MonthRoad
(6.)Group-12 Poly Aluminium Chloride1047.4210952.5812000OthersMT/MonthRoad
(7.)Group-13 Other Compounds0150150OthersMT/MonthRoad
(8.)Group-1 Pesticides Technical020002000OthersMT/MonthRoad
(9.)Group-3 Nitro Compounds122.5177.5300OthersMT/MonthRoad
(10.)Group-7 Dichloro Diphenyl Ethers0100100OthersMT/MonthRoad
(11.)Group-8 Carbonyl Chlorides05050OthersMT/MonthRoad
(12.)Group-11 Amino Compounds70070OthersMT/MonthRoad
(13.)Group-10 Physical separation by Distillation37624400OthersMT/MonthRoad
(14.)Group-5 hydrogenation Compounds0200200OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)ReactorGlass Lined 10 nos 3KL 16 KLGlass Lined 10 Nos 3 KL 32 KL----
(2.)ReactorGraphite Lined 2 Nos. 4KL 10 KLReactor Graphite 2 Nos 4 KL 10 KL4KL-10KL--
(3.)ReceiversStainless Steel 5 Nos 1KL-14 KLStainless Steel 5 Nos 1KL-14 KL1KL-14KL--
(4.)CrystallizerSS 2 Nos 3KL-16KLSS 2 Nos 3KL-16KL3KL-16KL--
(5.)CentrifugeSS 01 NosSS 02 Nos----
(6.)3 stage HCL ScrubberGraphite 2 nos 200 kg/hr to 500kg/hrGraphite 3 nos 200 kg/hr to 500kg/hr----
(7.)Air CompressorMS 3 nos 75CFM------
(8.)Nitrogen Generation plantMS 1 Nos 50m3/Hr------
(9.)Extractors--SS 1 nos 4KL-6KL----
(10.)High Vaccum Batch DistillationMS 4nos 3KL-9KLMS 4nos 3KL-9KL----
(11.)Chilling plantMS 5 nos 25TR-200TRMS 7 nos 25TR-200TR----
(12.)ReactorStainless Steel 2 Nos 6KL-8KLStainless Steel 2 Nos 6KL-8KL6KL-8KL--
(13.)CrystallizerSS 2 Nos 3KL-16KLMild Steel 6 Nos. 10KL-35KL10KL-35KL--
(14.)Chilling plant +5 CMS 2nos 40 TR-100TRMS 3 nos 40 TR-100TR----
(15.)ReceiversGlass Lined 4 Nos 1KL-5KLGlass Lined 4 Nos 1KL-10 KL1KL-10KL--
(16.)Air compressor--MS 5nos 75CFM----
(17.)CrystlizerMild Steel 6 Nos 10KL-35KLMild Steel 6 Nos 10KL-35KL10KL-35KL--
(18.)Agitated Nutch Filters--SS 01 nos 6KL-8 KL----
(19.)Cooling towerpolypropelene 2 nos 400TRpolypropelene 3 nos 400TR------
(20.)Spray Dryer--SS 1 nos----
(21.)High Vaccum Batch DistillationSS 2 nos 6KL-10KLSS 2 nos 6KL-10KL----
(22.)Continuous DistillationMS 5 nosMS 4 nos----
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Jun 2015
(iv)Valid Upto 23 Jun 2020
(v)File No. AWH-71724
(vi)Application No. 90147
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 9.96
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.9
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.992
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 12.13
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 641800
(b)Existing quantity of raw material/fuel 3000.0
(c)Total quantity of raw material/fuel 644800
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Toluene30436Tons per AnnumDomesticRoad50 Open MarketCopy of Linkage
(2.)Ferric Chloride125Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(3.)Caustic500Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(4.)Sodium Bi Carbonate200Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(5.)Thionyl chloride645Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(6.)Fluoro Benzene6720Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(7.)NMP2232Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(8.)DMF60Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(9.)IPA1200Tons per AnnumDomesticRoad60 Open MarketCopy of Linkage
(10.)HCl24840Tons per AnnumDomesticRoad75 Open MarketCopy of Linkage
(11.)Acetic Acid60Tons per AnnumDomesticRoad60 Open MarketCopy of Linkage
(12.)Sulfuric Acid7521Tons per AnnumDomesticRoad75 Open MarketCopy of Linkage
(13.)Aniline1481.52Tons per AnnumDomesticRoad25 Open MarketCopy of Linkage
(14.)Aluminum chloride11404.44Tons per AnnumDomesticRoad50 Open MarketCopy of Linkage
(15.)Chlorine5289.6Tons per AnnumDomesticRoad50 Open MarketCopy of Linkage
(16.)Phenol22276Tons per AnnumDomesticRoad50 Open MarketCopy of Linkage
(17.)EDC15075Tons per Annumopen marketRoad50 Open MarketCopy of Linkage
(18.)Meta Chlo. Benz12516Tons per AnnumImportRoad,OthersBy Sea/Air500 Open MarketCopy of Linkage
(19.)Nitric acid5693Tons per AnnumDomesticRoad50 Open MarketCopy of Linkage
(20.)Benzene6776Tons per AnnumImportOthersBy sea/Air500 Open MarketCopy of Linkage
(21.)Hexane7125Tons per AnnumImportOthersby sea/air500 Open MarketCopy of Linkage
(22.)MDCB10371Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(23.)Activated Carbon96Tons per AnnumDomesticRoad55 Open MarketCopy of Linkage
(24.)NitrosylSulfuricAcid7668Tons per AnnumImportOthersBy sea/Air500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube84.0473.3984100
(2.)PM2.5Micro Gram per Meter Cube45.541.14560
(3.)OthersNH3Micro Gram per Meter Cube00080
(4.)SO2Micro Gram per Meter Cube17.613.51780
(5.)NOxMicro Gram per Meter Cube19.4215.121980
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherspH-Scale8.087.0378.5
(2.)TDSmg/l2025002000
(3.)Fluoridemg/l0.050.0511.5
(4.)TSSmg/l206211250100
(5.)Heavy MetalsZnmg/l0.220.22515
(6.)Total Hardnessmg/l37080300600
(7.)Chloridesmg/l453.34.822501000
(8.)OthersZnmg/l00515
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherspH Scale8.068.06A
(2.)DOmg/l7.37.3B
(3.)CODmg/l2.662.66D
(4.)BODmg/l0.00.0A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.547.755
(2.)Leq(Night)A-weighted decibels(dB(A))44.138.145
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH-Scale8.026.97
(2.)N(Nitrogen)Milligram per Kilogram225.498.5
(3.)P(Phosphorus)Milligram per Kilogram20825.8
(4.)K(Potassium)Milligram per Kilogram869207
(5.)Electric ConductivityMillisiemens per Centimetre2.341.37
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 22 To 24
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply381.010Copy of Permission LettermodeOthersTankerOthersGIDC Water Supply By TankerNAO/SRG/4620 Apr 2019381.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)RO Plant78.7580RO TreatmentReuse within the Plant & Recycling,Others15.75 KLD RO Reject will be sent to MEE plant6315.75
(2.)Low COD TDS19.2520Treated Effluent will be sent to CETPOtherssend to CETP Sarigam019.25
(3.)High COD + RO Reject30.030.0Primary Treatment & MEE Followed by Solvent Stripper & ATFD 1.2 KLD LossReuse within the Plant & Recycling,Others1.2 KLD loss28.81.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 128
(b)Total Discharged Water (Kilolitre per Day) 36.2
(c)Total Reused Water (Kilolitre per Day) 91.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process Waste SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1000Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36418.8Tons0RoadOthersInhouse Distillation and Reuse in plant Premises
(4.)Sludge from scrubberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.54Tons30RoadOthersDisposal to VWEMCL Site
(5.)HCL SolutionHazardous Waste (as per Hazardous and Other Waste Management rules 2016)22080Tons02RoadOthersConverted into valuable Finished Product
(6.)Iron sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1020Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)432Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Aluminium Chloride soln.Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)56916Tons02RoadOthersConverted into valuable Finished Product
(9.)Used OilIndustrial Waste1.5Tons50RoadAuthorized Recyclers
(10.)Dil Sulphuric Acid SolnHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16740Tons30RoadOthersSend to end user
(11.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)782.64Tons135RoadOthersCo processing or Incineration
(12.)Sodium Sulphite solnHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5662.8Tons50RoadOtherssend to end user
(13.)Discarded Bags ContainerIndustrial Waste25Tons50RoadAuthorized Recyclers
(14.)Sodium Sulphite solnHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5662.8Tons50RoadOtherssend to end user
(15.)Sodium Chloride saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)483Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)Sodium Sulphite solnHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5662.8Tons50RoadOtherssend to end user
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.152.620.183100
(2.)SO2Microgram per Meter Cube15.122.620.171680
(3.)NOxMicrogram per Meter Cube17.762.620.061880
(4.)PM2.5Microgram per Meter Cube44.382.620.14560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)steam boiler-2 8.0 TPHCoal/Ignite320.5OthersSPM SO2 Nox150 262 94 mg/Nm3
(2.)Boiler 6.0 TPH ExistingCoal/Ignite320.5OthersSPM SO2 Nox150 262 94 mg/Nm3
(3.)DG Set 650 KVA proposedHSD90.1OthersSPM SO2 Nox150 262 94 mg/Nm3
(4.)Proposed Reaction Vessel--110.1SO240.0 mg/Nm3
(5.)DG Set ExistingHSD90.1OthersSPM SO2 Nox150 262 94 mg/Nm3
(6.)steam boiler 8.0 TPH ProposedCoal/Ignite320.5OthersSPM SO2 Nox150 262 94 mg/Nm3
(7.)Process vent-1 Nitration Existing--110.1NOx25 mg/Nm3
(8.)DG set 650 KVA proposedHSD90.1OthersSPM SO2 Noxmg/Nm3
(9.)Process vent-2 Reaction vessel--110.1OthersHCL20.0 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing 500 KVA Proposed 650 KVA*2 Nos
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.19804
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.19804
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 202.36
(b)Waste/Barren Land (ha.) 6.67
(c)Grazing/ Community Land (ha.) 13.54
(d)Surface Water Bodies (ha.) 1.62
(e)Settlements (ha.) 21.55
(f)Industrial (ha.) 7.80
(g)Forest (ha.) 14.97
(h)Mangroves (ha.) 9.91
(i)Marine Area (ha.) 21.17
(j)Others (ha.) : Other 15.41
    Total (ha.) 315.00000000000006
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.02862--
(2.)Green belt0.06536--
(3.)OthersOther0.10406
Total (ha.) 0.19804
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVapi25--
(2.)NPANA0.0--
(3.)ESAsNA0.0--
(4.)CorridorsNA0.0--
(5.)Wildlife CorridorsNA0.0--
(6.)WLSNA0.0--
(7.)ESZsNA0.0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0.0--
(2.)Archaeological SitesNA0.0--
(3.)Defence InstallationsNA0.0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species We have budget for 2 species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 305000
(iii)Period of Implementation 1 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 115
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 10
(e)No. of working days 330
(f)Total Manpower 325
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt65360.06536
(2.)Percentage of Total Project Area33033
(3.)No. of Plants200240440
(4.)Funds Allocated5000006000001100000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalCER Activity
(2.)SocialSocial Welfare will be done
(3.)FinancialEmployment would be as per prevailing norms of state government for skilled and unskilled people for the proposed expansion project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET Application Applied
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Centre Point, Civil Char Rasta, Nr. Kadiwala School, Ring Road, Surat-395002 (Guj.)
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVivek M Chadha
DesignationDirector
Name of Company (Applicant Name should not be given here)VAL ORGANICS PVT LTD
AddressPlot no.2201, GIDC Sarigam, Ta-Umaargaon, Dist-Valsad-396155