1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Upgradation Of Existing Production Units And Additional Facilities To Create 0.6 Million Tonnes Capacity of Steel, of Neo Metaliks Limited, in Mouza Gopalpur, District Paschim Bardhaman, West Bengal | (b)Name of the Company / Organisation | NEO METALIKS LIMITED | (c)Registered Address | PARK PLAZA, 71, PARK STREET, NORTH BLOCK,,Kolkata,West Bengal-700016 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | RAJIV JAIN | (b)Designation (Owner/ Partner/ CEO) | CS | (c)Address | PARK PLAZA, 71, PARK STREET, NORTH BLOCK,,Kolkata,Kolkata,West Bengal-700016 | (d)Pin code | 700016 | (e)E-mail | maccts@neometaliks.com | (f)STD Code. | 33(f)Telephone No. | 40504050 | (g)Fax No. | 22177317 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/152904/2007 | (d)Master Proposal Number(Single Window) | SW/152892/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 90.045 Acre of area already acquired by NML | (b)Pincode | 713212 | (c)Bounded Latitudes (North) | | From | | Degree | 23.4918 | Minutes | | Second | | From | | Degree | 23.5011 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 87.3761 | Minutes | | Second | | From | | Degree | 87.3833 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73M/6 and 73M/7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 106 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/779/2007-IA II (I) | (b)Date of Apply of TOR | 06 Jul 2007 | (c)Date of Issue of TOR / Standard ToR | 24 Sep 2007 | (d)Date of Apply of EC | 11 Sep 2008 | (e)Date of Issue of EC | 04 Nov 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Nov 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| Meeting Hall of Gopalpur G.P. of Kanksa Block, District-Paschim Bardhaman | State : | West Bengal | District : | Paschim bardhaman | Tehsil : | Durgapur | Village : | Gopalpur |
| 68 | Related to more plantation programme inside & outside the industry, steps to be taken to control environmental pollution due to operation of the unit, and employment shall given to local villagers. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-221/07/EPE/6 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 14 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Wire Rods (Carbon and Value Added Grades | 0 | 300000 | 300000 | Tons per Annum(TPA) | | Road | | (2.) | Billets | 0 | 100000 | 100000 | Tons per Annum(TPA) | | Road | | (3.) | TMT Rebars | 0 | 200000 | 200000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | SINTER PLANT | 33 m2 | 42 m2 | 75 m2 | 1 unit (after upgradation) | (2.) | DRI KLINS | 0 | 350 t/d | 350 t/d | 2 units (New) | (3.) | Wire Rod Mill | 0 | 300000 | 300000 | 1 unit (New) | (4.) | Induction furnaces, compatible LRF & CCM | 0 | 30 t/12 MW | 30 t/12 MW | 2 units (New) | (5.) | Zero Power furnace (ZPF), compatible LRF, VD & CCM | 0 | 50 t | 50 t | 1 unit (New) | (6.) | EXISTING CAPTIVE POWER PLANT | 4.5 MW | 0.5 MW | 5 MW | 1 unit (after upgradation) | (7.) | Fully Continuous Mill | 0 | 200000 t/y | 200000 t/y | 1 unit (New) | (8.) | OXYGEN PLANT (NITROGEN AS BYPRODUCT | 0 | 250 t/d | 250 t/d | 1 unit (New) | (9.) | NEW CAPTIVE POWER PLANT | 0 | 35 MW | 35 MW | 1 unit (New) | (10.) | MINI BLAST FURNANCE WITH PCI | 215 m3 | 235 m3 | 450 m3 | 1 unit (after upgradation) | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 20 Apr 2017 | (iv)Valid Upto | 30 Apr 2022 | (v)File No. | Memo no. 907/WPBD-Const(2809)/16 | (vi)Application No. | C0100888 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 956 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 28.94 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.78 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6.34 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1919757 | (b)Existing quantity of raw material/fuel | 58350 | (c)Total quantity of raw material/fuel | 1978107 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron (ore / fines / red mud / tailent / laterite) | 1167036 | Tons per Annum | | Odisha/Jharkhand | Road | | 300 | Others | Purchase Order | Copy of Linkage | (2.) | Burnt Lime | 3308 | Tons per Annum | | Domestic-Jaisalmer Imported- UAE | Road,Rail | | 300 | Fuel Supply Agreement | | Copy of Linkage | (3.) | coke Breeze | 42998 | Tons per Annum | | Durgapur | Road | | 50 | Others | Purchase Order | Copy of Linkage | (4.) | Limestone | 72765 | Tons per Annum | | Durgapur | Road,Rail | | 50 | Others | Purchase Order | Copy of Linkage | (5.) | Pig Iron | 8145 | Tons per Annum | | Open market | Road | | 100 | Open Market | | Copy of Linkage | (6.) | Scrap | 29470 | Tons per Annum | | open market | Road | | 100 | Open Market | | Copy of Linkage | (7.) | Coal Injection | 80325 | Tons per Annum | | Imported | Road,Rail | | 150 | Fuel Supply Agreement | | Copy of Linkage | (8.) | Coal | 329295 | Tons per Annum | | Coal India Ltd., ECL | Road,Rail | | 500 | Fuel Supply Agreement | | Copy of Linkage | (9.) | Coke | 212625 | Tons per Annum | | Durgapur | Road,Rail | | 200 | Fuel Supply Agreement | Purchase Orde | Copy of Linkage | (10.) | Dolomite | 69755 | Tons per Annum | | Birpara, (Bhutan) | Road,Rail | | 200 | Others | Purchase order | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 195.6 | 76.5 | 195.6 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 96.0 | 46.6 | 96.0 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 24.4 | 11.2 | 24.3 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 45.6 | 22.3 | 45.6 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.98 | 0.46 | 0.98 | 2 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.8 | 7.3 | 6.5 | 8.5 | (2.) | Chlorides | | | mg/l | | 110.0 | 90.3 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 0.5 | 0.11 | 1.0 | 1.5 | (4.) | Total Hardness | | | mg/l | | 213.0 | 166.1 | 300 | 600 | (5.) | TDS | | | mg/l | | 511 | 428 | 500 | 2000 | (6.) | TSS | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 25.9 | 10.6 | C | (2.) | DO | | mg/l | | 5.9 | 4.8 | C | (3.) | pH | | NA | | 7.7 | 7.1 | C | (4.) | BOD | | mg/l | | 5.1 | 2.4 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 66.2 | 50.0 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 51.6 | 41.7 | 70 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 289.7 | 143.2 | (2.) | pH | | | 7.4 | 6.8 | (3.) | N(Nitrogen) | Kilogram per hectare | | 164.7 | 80.2 | (4.) | P(Phosphorus) | Kilogram per hectare | | 52.6 | 41.8 | (5.) | Electric Conductivity | Others | µmhos /cm | 198.3 | 152.0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.74 To 19.95 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.22 To 11.63 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 7440 | 6 | Copy of Permission Letter | Pipeline | | Others | Pipe line | ADDA/DGP/ED/G-01/2020-21/208 | 29 Sep 2020 | 6000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic use | 50 | 75 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 50 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 50 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 50 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dolachar | Others | Kiln | 56760 | Tons | 0 | Road | | Others | Used in CPP Boiler | (2.) | Bag Filter Dust | Others | Nonhazardous Coal & Iron Ore Dust | 27716.7 | Tons | 0 | Road | | Others | Used in Sinter Plant | (3.) | Granulated Slag | Others | Non- hazardous By-product | 178200 | Tons | 100 | Road | | Others | Sold for Cement Manufacturing | (4.) | CFBC ESP Dust | Fly Ash | | 38610 | Tons | 50 | Road | | Others | Used in Brick Making | (5.) | Industrail Waste | Industrial Waste | | 660 | Tons | 100 | Road | | Authorized Recyclers | | (6.) | Slag | Others | Non- hazardous silicates of calcium & magnesium | 66343.2 | Tons | 100 | Road | | Others | stone aggregates & fines for road making | (7.) | Mill Scale | Others | Non- hazardous Iron Oxide | 10566 | Tons | 0 | Road | | Others | Charged back to Sinter Plant | (8.) | Primary Gas Cleaning Dust | Others | Non- hazardous Iron Fines | 6682.5 | Tons | 0 | Road | | Others | charged back to sinter plant | (9.) | Dust from Exhaust Gases | Fly Ash | | 4540.8 | Tons | 100 | Road | | Others | Sent to Brick Making Plants | (10.) | ESP Dust | Others | Non- hazardous Iron Fines | 25740 | Tons | 0 | Road | | Others | Charged back to Sinter Plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 96.0 | 1 | 3 | 100 | 60 | (2.) | NOx | | Microgram per Meter Cube | 45.6 | 1.2 | 1 | 47 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 195.6 | 1 | 2.0 | 198 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 24.3 | 1.2 | 4 | 29 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 980 | 1.2 | 1 | 982 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Sinter Plant 75 m2 | Blast Furnace Gas | 40 | 2.5 | PM10 | | 2.2 | (2.) | MBF Stove ( 450 m3) | BFG | 50 | 3 | NOx | | 5.90 | (3.) | MBF Cast House (450 m3) | N/A | 40 | 3 | SO2 | | 2.48 | (4.) | DRI Klin 1 (350 TPD) | Coal | 40 | 2 | PM10 | | 2 | (5.) | DRI Klin 2 (350 TPD) | Coal | 40 | 2 | Others | PM2.5 | 0.86 | (6.) | DRI Klin 1 (350 TPD) | Coal | 40 | 2 | SO2 | | 19.44 | (7.) | LRF (50 t) | Electricty | 30 | 1.2 | PM10 | | 0.53 | (8.) | LRF (50 t) | Electricty | 30 | 1.2 | Others | PM2.5 | 0.52 | (9.) | Sinter Plant 75 m2 (Tail End) | N/A | 30 | 2 | Others | PM2.5 | 0.3 | (10.) | MBF Cast House (450 m3) | N/A | 40 | 3 | Others | CO | 16.57 | (11.) | DRI Klin 2 (350 TPD) | Coal | 40 | 2 | SO2 | | 19.44 | (12.) | Induction Furnaces (2*30 t) | Electricity | 30 | 4 | Others | PM2.5 | 3.2 | (13.) | ZPF (50 t) | Oxygen | 30 | 3 | Others | PM2.5 | 5.1 | (14.) | Reheating Furnace 1 (20t/hr) | FO | 40 | 1.14 | Others | PM2.5 | 0.6 | (15.) | Sinter Plant 75 m2 | Blast Furnace Gas | 40 | 2.5 | SO2 | | 25 | (16.) | Sinter Plant 75 m2 | Blast Furnace Gas | 40 | 2.2 | Others | CO | 522.01 | (17.) | Reheating Furnace 1 (20t/hr) | FO | 40 | 1.14 | SO2 | | 15 | (18.) | DG SET (1500 kVA) | HSD | 30 | 0.25 | NOx | | 2.4 | (19.) | DG SET (1500 kVA) | HSD | 30 | 0.25 | Others | CO | 0.27 | (20.) | Induction Furnaces (2*30 t) | Electricty | 30 | 4 | PM10 | | 6.3 | (21.) | PCI | N/A | 41.9 | 0.95 | PM10 | | 0.14 | (22.) | WHRB Boiler (35 MW) | Coal/Char | 70 | 1.5 | SO2 | | 25.85 | (23.) | MBF Cast House (450 m3) | N/A | 40 | 3 | PM10 | | 2.5 | (24.) | DRI Klin 1 (350 TPD) | Coal | 40 | 2 | Others | PM2.5 | 0.86 | (25.) | DRI Klin 1 (350 TPD) | Coal | 40 | 2 | PM10 | | 2 | (26.) | ZPF (50 t) | Oxygen | 30 | 3 | PM10 | | 5.3 | (27.) | ZPF (50 t) | Oxygen | 30 | 3 | NOx | | 6.94 | (28.) | Reheating Furnace 2 (30t/hr) | FO | 40 | 1.14 | PM10 | | 2 | (29.) | Reheating Furnace 2 (30t/hr) | FO | 40 | 1.14 | SO2 | | 22 | (30.) | 35 MW Power Plant (WHRB) | Coal/Char | 70 | 1.5 | PM10 | | 1 | (31.) | 35 MW Power Plant | Coal/char | 70 | 1.5 | Others | PM2.5 | 0.5 | (32.) | 35 MW Power Plant (WHRB) | Coal/char | 70 | 1.5 | NOx | | 20.4 | (33.) | DG SET (1250 kVA) | HSD | 30 | 0.25 | NOx | | 2.55 | (34.) | DG SET (1500 kVA) | HSD | 30 | 0.25 | SO2 | | 0.39 | (35.) | PCI | N/A | 41.9 | 0.95 | Others | PM2.5 | 0.05 | (36.) | De-Dusting System (3) | N/A | 10 | 0.7 | PM10 | | 0.09 | (37.) | Reheating Furnace 2 (30t/hr) | FO | 40 | 1.14 | Others | PM2.5 | 0.6 | (38.) | 35 MW Power Plant (WHRB) | Coal/char | 70 | 1.5 | SO2 | | 25.85 | (39.) | CPP (5 MW) | BFG | 50 | 2 | NOx | | 3.33 | (40.) | DG SET (1250 kVA) | HSD | 30 | 0.25 | SO2 | | 0.39 | (41.) | DG SET (1250 kVA) | HSD | 30 | 0.25 | Others | CO | 0.97 | (42.) | Reheating Furnace 1 (20t/hr) | FO | 40 | 1.14 | PM10 | | 2 | (43.) | Dedusting System (3) | N/A | 10 | 0.7 | Others | PM2.5 | 0.03 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 32600 | (b)Source | Damodar Valley Corporation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1250 kVA and 1500 kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 36.43 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 36.43 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 16156.6 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1835.7 | (e)Settlements (ha.) | 4873.1 | (f)Industrial (ha.) | 920.1 | (g)Forest (ha.) | 4165.5 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Minning activities, Existing Airport, Open Scrub, | 5704.01 | Total (ha.) | 33655.0100 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 29.63 | | (2.) | Green belt | | 2.09 | | (3.) | Others | Contiguous Area available outside the boundary | 4.71 | Contiguous Area available outside the boundary | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NA | 0 | NA | (2.) | ESZs | NA | 0 | NA | (3.) | Wildlife Corridors | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | WLS | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Forest | | Kunar N. | 6.1 | Direction - NNE | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 36.43 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Left Canal | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 80 | (d)Temporary Employment- During Operation | 250 | (e)No. of working days | 330 | (f)Total Manpower | 500 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 8805 | 10000 | 18805 | (2.) | Total Area of Green Belt | 2.09 | 8.4 | 10.49 | (3.) | Percentage of Total Project Area | 6.59 | 26.44 | 33.03 | (4.) | Funds Allocated | 193899 | 46200 | 240099 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The proposed project will have many employment & trade opportunities with the inception of the construction
activities. Thus, these considerable employment & trade opportunities will eventually result in appreciable
economic benefits to the local people & businesses/contractors. At present the raw materials & finished goods
are moved by truck which provides indirect employment to people engaged in this sector. With increase in
capacity, unit’s contribution to growth of service sector shall incre | (2.) | Environmental | Development of Greenbelt/plantations will be at the periphery of the company premise and outside to make it
33% of total plant area. For enhancing
green cover in the area, local and fast growing plant species will be planted under greenbelt development
program. | (3.) | Social | The proposed expanded unit is expected to employ 500 skilled, semi-skilled and unskilled category persons. Preference will be given to local population for employment in the semi-skilled and unskilled category; this will increase the employment opportunity in the surrounding area. Secondary jobs and indirect employment are also to be generated to provide day-to-day needs and services to the work force and industrial activity. This will also increase the demand for essential daily utilities in th | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/19/1186 | (ii)Name of the EIA Consultant | Greencindia Consulting Private Limited | (iii)Address | Greencindia Consulting Private Limited 605-611, Level-5 Sector-5, Shopprix Mall Vaishali-201010, Ghaziabad | (iv)Mobile No. | 9891906015 | (v)Landline No. | 0120456873 | (vi)Email Id | nandini@greencindia.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 30 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal is returned due to the following shortcomings:
Form 2:
i. In s.no.6, existing EC and ToR has not been uploaded.
ii. In s.No.4, not able to access the KML file. Appropriate KML file shall be uploaded.
iii. In s.no. 7.1, entire PH proceedings inter-alia including SPCB cover letter, actual proceedings, attendance sheet, written representations and the response submitted shall be uploaded.
iv. In s.no.9, certified compliance of RO shall be submitted. In case of non-compliances reported by RO, closure report from RO shall also be submitted.
v. In s.no. 14.1, PM10 monitored level is reported as 195 µg/m3 which is more than prescribed limits. Probable reasons for the same may be elucidated.
vi. In s.no.15, permission for supply of 6000 KLD from Asansol Municipal Authority shall be submitted. In the absence of said approval, alternate source of water supply shall be furnished.
vii. In s.no. 22, inadequate area has been earmarked for the green belt development. Revised table covering 33% of the total area shall be furnished.
viii. The project is located in Durgapur which is CEPI area having score of 65.56. Whereas, in s.no. 23.1, it is mentioned there is no critically polluted area. Reasons for suppressing the said information and control measures proposed by the project proponent as per the Ministry’s OM. Dated 31/10/2019 regarding consideration of proposals in CEPI area shall be incorporated in the EIA report and submitted.
ix. In s.no. 32, kindly furnish the time bound action plan for green belt development covering 33% of the 36.43 ha with appropriate layout.
EIA report
i. Undertaking by the project proponent owning the contents of the EIA report shall be furnished as per the QCI/NABET requirements.
ii. Page numbering for the figures as well as Annexures mentioned in the EIA report shall be incorporated.
iii. The project is located in Durgapur which is CEPI area having score of 65.56. Reasons for suppressing the said information in the EIA report and control measures proposed by the project proponent as per the Ministry’s OM. Dated 31/10/2019 regarding consideration of proposals in CEPI area shall be incorporated in the EIA report and same shall be submitted.
iv. In chapter 2, the details of Top Recovery Turbine on Blast furnace shall be furnished.
v. In chapter 2, water balance submitted is not visible. Further, material balance of the 0.6 MTPA shall be furnished.
vi. In chapter 3, the source for presence of poly aromatic hydrocarbons and other metals in the ambient air shall be furnished.
vii. In chapter 4, AAQ modeling isopleths may be superimposed on topo map with wind rose diagram and the receptor details shall be provided.
viii. In chapter 4, kindly furnish the time bound action plan for green belt development covering 33% of the 36.43 ha with appropriate layout.
ix. In chapter 8, cost earmarked towards CER is not as per the Ministry’s O.M. dated 1/5/2018. This may be reworked out and submitted. | 16 Jun 2020 | 2. | NA | The correction have been made as per the instruction received | 12 Oct 2020 | 3. | NA | Point wise reply to the EDS raised on 11/06/2020 has not been submitted and also not incorporated in the Form 2 as well as in the EIA report. Kindly furnish the compliance to the EDS reply.
In addition, cover letter date may also be revised as the old cover letter is again uploaded on PARIVESH. | 22 Oct 2020 | 4. | Eds Reply Letter | The correction have been made as per the instruction received | 22 Oct 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | RAJIV JAIN | Designation | CS | Name of Company (Applicant Name should not be given here) | NEO METALIKS LIMITED | Address | PARK PLAZA, 71, PARK STREET, NORTH BLOCK |
|