Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Group Housing Project La Tropicana at Magazine Road, Khyber Pass, New Delhi
(b)Name of the Company / Organisation PARSVNATH LANDMARK DEVELOPERS PVT LTD
(c)Registered Address Parsvnath Tower, Near Shahdra Metro Station, Shahdra,,North East,Delhi-110032
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bharat Bhushan Wadhwa
(b)Designation (Owner/ Partner/ CEO) AVPSanctions
(c)Address Parsvnath Tower, Near Shahdra Metro Station, Shahdra,,Shahdara,North East,Delhi-110032
(d)Pin code 110032
(e)E-mail parsvnathdeveloperspvtltd@gmail.com
(f)STD Code. 11(f)Telephone No. 43050473
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/152851/2019
(d)Master Proposal Number(Single Window) SW/152850/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Magazine Road, Khyber Pass, New Delhi
(b)Pincode 110054
(c)Bounded Latitudes (North)
From
Degree 7713.295
Minutes
Second
From
Degree 7713.328
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 2841.736
Minutes
Second
From
Degree 2841.795
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 220
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.25
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-73/2019-IA-III
(c)Date of Issue of TOR 17 Mar 2020
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 08 Jun 2020
(c)Date of Issue of EC 23 Nov 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Its is a building and construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. 4-372/2007-RO(NZ)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 22 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)...NaNTons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.).....
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Mar 2015
(iv)Valid Upto 16 Dec 2020
(v)File No. CTE/ CTO exemted as per DPCC OM File NO: DPCC/IT C
(vi)Application No. CTE/ CTO exemted as per DPCC OM File NO: DPCC/IT C
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 110
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.69
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.82
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 39.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)**0Tons per Annum*Road0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 01 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube0.960.730.932
(2.)PM10Micro Gram per Meter Cube296105284.5100
(3.)PM2.5Micro Gram per Meter Cube14857140.560
(4.)SO2Micro Gram per Meter Cube231322.880
(5.)NOxMicro Gram per Meter Cube37253780
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.168.166.58.5
(2.)TDSmg/l5525525002000
(3.)Chloridesmg/l62622501000
(4.)Fluoridemg/l0.340.3411.5
(5.)Total Hardnessmg/l460460200600
(6.)TSSmg/l0000
(7.)Heavy MetalsFemg/l0.130.130.30.3
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.24.2E
(2.)BODmg/l4432E
(3.)pHNA8.127.88E
(4.)CODmg/l200140E
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.0453.5865
(2.)Leq(Night)A-weighted decibels(dB(A))43.9143.2855
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.268.26
(2.)P(Phosphorus)Milligram per Kilogram6.16.1
(3.)Electric ConductivityOthersuS/cm456456
(4.)N(Nitrogen)Milligram per Kilogram3838
(5.)K(Potassium)Milligram per Kilogram6868
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.06 To 9.92
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.01 To 8.82
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board4435Copy of Permission LetterPipelineOthersPipelineF(4)852 EZ/EE(P) W-III/2009/83527 Jan 20091199
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)OnSite STP335450OnSite STPOthersnearby parks and construction activity160175
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 335
(b)Total Discharged Water (Kilolitre per Day) 175
(c)Total Reused Water (Kilolitre per Day) 160
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteMunicipal Solid Waste1069Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00010
(2.)PM10Microgram per Meter Cube00010
(3.)SO2Microgram per Meter Cube00010
(4.)NOxMicrogram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setsULSD70.35PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4990
(b)Source BSES, Rajdhani Power Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3270 kva
(e)Stack Height (in m) 132.65
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 6.8
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 6.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 6.8
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 6.8000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.16Green belt development
Total (ha.) 3.16
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0.0*
(2.)WLSNA0.0*
(3.)NPANA0.0*
(4.)ESZsNA0.0*
(5.)Wildlife CorridorsOkhla Bird Sanctuary14.54*
(6.)ESAsNA0.0*
(7.)CorridorsNA0.0*
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesRed Fort4.54*
(2.)Defence InstallationsDelhi Cantt12.57*
(3.)ForestKamla Nehru Ridge0.29*
(4.)Others**0*
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.59
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 270
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants000
(2.)Funds Allocated000
(3.)Percentage of Total Project Area000
(4.)Total Area of Green Belt000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated during construction as well as in operation phase
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 125.65
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 68158.35
(e)Total built up area (sqm) 255262
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 157.5
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 3256
5.
Energy Saving Measures:
(a)Source/Mode SPV
(b)Percentage 5
(c)Quantity 200
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area .
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0098
(ii)Name of the EIA Consultant Ind Tech House Consult
(iii)Address G8/6 Ground Floor sector 11 Rohini New Delhi
(iv)Mobile No. 8860080363
(v)Landline No. 0112757141
(vi)Email Id dubeyakw@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Application has been examined. Please address following deficiencies found in your application No. IA/DL/MIS/152851/2019, Dated 9th May, 2020: 1. Data provided in ‘Form 2’ w.r.t. CTO is inconsistent. 2. Action taken Note on observations contained in certified compliance report of RO MOEFCC, Lucknow has not been provided. 3. Detailed CER plan has not been provided in the EIA report. 4. Details of Water Requirement (During Operation), Energy Saving measures and the Waste management Data, etc. provided in Form 2 is not consistent with data provided in EIA Report. 5. Data provided in Form 2 for Waste Water Management is not consistent with data in EIA report. There is variation in ‘Quantity of Discharged Water (Kilolitre per Day) and surplus treated water. 6. Inconsistent data with respect to total projects cost in the Conceptual Plan (INR 738 cr) and EIA Report (INR 728 cr) 7. Data in Form 2 w.r.t accreditation No for Consultant is also inconsistent with attached certificate. 8. Copy of previous EC and its validity extension are not accessible due to error on the page. May be provided/ uploaded again. You may like to submit the revised Application after addressing the above deficiencies. 05 Jun 2020
2.NAThe correction have been made as per the instruction received 06 Jun 2020
3.NAThe Application has been examined. Please address following deficiencies found in your application No. IA/DL/MIS/152851/2019, Dated 6th June, 2020: 1. Data provided in ‘Form 2’ w.r.t. CTO is still inconsistent. In the main application on the portal (Form-2), as per para 9.1 (v) and 9 (vi), CTE/ CTO exempted as per DPCC OM File NO: DPCC/IT C. On the other hand, in para 9.1 (iii), it is mentioned that Date of Issue of CTO is 02 Jul 2007 and as per para 9.1 (iv) CTO is Valid up to 06 Jun 2025. Kindly clarify or fill the main application form which is in public domain, correctly. 2. Upload copy of previous EC and its validity extension 08 Jun 2020
4.NAThe correction have been made as per the instruction received 08 Jun 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBharat Bhushan Wadhwa
DesignationAVPSanctions
Name of Company (Applicant Name should not be given here)PARSVNATH LANDMARK DEVELOPERS PVT LTD
AddressParsvnath Tower, Near Shahdra Metro Station, Shahdra
Print