Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PENTAKEM INDUSTRIES
(b)Name of the Company / Organisation PENTAKEM INDUSTRIES
(c)Registered Address Plot No. 3121, Panoli Industrial Estate, Ankleshwar,,Bharuch,Gujarat-394115
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Karun R Lal
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 401 Shikhar Residency Nr. Navrachna School Sama Road Vadodara,,Anklesvar,Bharuch,Gujarat-394115
(d)Pin code 394115
(e)E-mail pentachem3121@gmail.com
(f)STD Code. 635(f)Telephone No. 2079780
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/152750/2019
(d)Master Proposal Number(Single Window) SW/152748/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3121
(b)Pincode 394115
(c)Bounded Latitudes (North)
From
Degree 21.53
Minutes
Second
From
Degree 21.53
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.94
Minutes
Second
From
Degree 72.94
Minutes
Second
(e)Survey of India Topo Sheet No. f43n2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 90
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 111
(b)Date of Apply of TOR 26 Feb 2019
(c)Date of Issue of TOR / Standard ToR 16 May 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located inside notified industrial
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)distillation unit12 KL2 Nos.
(2.)distillation unit3 KL1 No
(3.)Autoclave5 Kl1 No
(4.)Reactor5 KL1 No.
(5.)fusion pot3 KL2 Nos.
(6.)Condensation Reactor5 Kl1 No
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Meta Amino Phenol20OthersMT/MonthRoad
(2.)2,4, Disulpho benzaldehyde10OthersMT/MonthRoad
(3.)1,4 Dimethoxy Benzene8OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.7
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.2435
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2733
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2733
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Potassium Hydroxide360Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(2.)Metanilic acid345Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(3.)NaOH84Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(4.)HCl528Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(5.)Alpha Napthylamine372Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(6.)Aniline241.2Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(7.)DMS98Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
(8.)Hydroquinone84Tons per Annumlocal marketRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube36.34.9435.6780
(2.)PM10Micro Gram per Meter Cube114.2258.51113.99100
(3.)NOxMicro Gram per Meter Cube42.229.3341.880
(4.)PM2.5Micro Gram per Meter Cube85.8319.0984.5160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l26798.552501000
(2.)TSSmg/l1004050100
(3.)Fluoridemg/l1111.5
(4.)Heavy MetalsIronmg/l0.00.00.31
(5.)TDSmg/l19805355002000
(6.)Total Hardnessmg/l290203300600
(7.)pHNA8.27.36.58.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.1A
(2.)CODmg/l157.5C
(3.)DOmg/l63.8A
(4.)BODmg/l5.45.3A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.532.575
(2.)Leq(Night)A-weighted decibels(dB(A))68.322.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.17.2
(2.)K(Potassium)Milligram per Kilogram1082260
(3.)P(Phosphorus)Milligram per Kilogram8.54.2
(4.)N(Nitrogen)Milligram per Kilogram18575
(5.)Electric ConductivityMillisiemens per Centimetre52
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water131 Not Appliacble PipelineOthersGIDC WaterNA01 Jun 201915
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial10.1012MEEOthersEvaporation0.59.6
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10.1
(b)Total Discharged Water (Kilolitre per Day) 9.6
(c)Total Reused Water (Kilolitre per Day) 0.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process Waste SBCIndustrial Waste198Tons10RoadAuthorized Recyclers
(2.)Used OilIndustrial Waste1.50Tons10RoadOthersrecyclers/ reused in machinery as lubricants
(3.)Liquor AmmoniaIndustrial Waste360Tons10RoadAuthorized Recyclers
(4.)Discarded Containers/BagsIndustrial Waste30.50Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)ETP SludgeIndustrial Waste81.36Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)MEE saltIndustrial Waste72Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube36.30.624.5960.9080
(2.)PM2.5Microgram per Meter Cube85.830.60.085.8460
(3.)PM10Microgram per Meter Cube114.220.614.05128.28100
(4.)NOxMicrogram per Meter Cube42.220.611.9754.2280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)TFHNG110.2OthersPM10,SO2,NOx14.05
(2.)Steam boilerNG130.5OthersPM10,SO2,NOx14.05
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 95
(b)Source GIDC Panoli
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.0
(c)Government Land (ha.) 0.15
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.15
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.15
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : other 0.0
    Total (ha.) 0.15
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.08
(2.)Green belt0.06
(3.)Othersother area0.01
Total (ha.) 0.15
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnone20None with in 20 km
(2.)ESAsnone20None with in 20 km
(3.)Corridorsnone20None with in 20 km
(4.)Critically Polluted AreaAnkleshwar5yes
(5.)NPAnone20None with in 20 km
(6.)Wildlife Corridorsnone20None with in 20 km
(7.)ESZsnone20None with in 20 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone20none with in 20 km
(2.)ForestNone20none with in 20 km
(3.)Defence InstallationsNone20none with in 20 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.15
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 15
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.06
(b)Percentage of Total Project Area 40.00
(c)No. of Plants to be Planted 250
(d)Funds Allocated for Plantation 250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court Stay Order
(ii)Name of the EIA Consultant Shree Green Consultants
(iii)Address 505 SNS Platina Near Reliance Market Opp. Shrenik Residency Vesu Surat-395007
(iv)Mobile No. 9712916775
(v)Landline No. 8140086466
(vi)Email Id info@shreegreen.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKarun R Lal
DesignationPartner
Name of Company (Applicant Name should not be given here)PENTAKEM INDUSTRIES
AddressPlot No. 3121, Panoli Industrial Estate, Ankleshwar
Print