1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Propose Expansion for Speciality Chemicals & Agrochemical Intermediates | (b)Name of the Company / Organisation | M/S. SAJJAN INDIA LIMITED | (c)Registered Address | Plot No. 6102-6103, 6117-6119, 5809-5810, GIDC Estate, Ankleshwar,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Arun Mehta | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | Plot No. 6102-6103, 6117-6119, 5809-5810, GIDC Estate, Ankleshwar,,,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | grk@sajjan.com | (f)STD Code. | 2646(f)Telephone No. | 250403 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/152708/2019 | (d)Master Proposal Number(Single Window) | SW/152707/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 6102-6103, 6117-6119, 5809-5810 GIDC ESTA | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.628944 | Minutes | | Second | | From | | Degree | 21.629019 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.042342 | Minutes | | Second | | From | | Degree | 73.045636 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 81 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA/GJ/IND2/126575/2019 | (b)Date of Apply of TOR | 21 Nov 2019 | (c)Date of Issue of TOR / Standard ToR | 24 Feb 2020 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is located within GIDC Industrial Estate. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Reactor | 1 KL | 2 Nos. | (2.) | Reactor | 5 KL | 6 Nos. | (3.) | Reactor | 6 KL | 4 Nos. | (4.) | Reactor | 6.3 KL | 22 Nos. | (5.) | Reactor | 10 KL | 13 Nos. | (6.) | Reactor | 20 KL | 35 Nos. | (7.) | Reactor | 25 KL | 5 Nos. | (8.) | Reactor | 0.87 KL | 2 Nos. | (9.) | Reactor | 1.3 KL | 2 Nos. | (10.) | Reactor | 1.4 KL | 2 Nos. | (11.) | Reactor | 1 KL | 5 Nos. | (12.) | Reactor | 3.1 KL | 2 Nos. | (13.) | Reactor | 3.4 KL | 2 Nos. | (14.) | Reactor | 3.8 KL | 2 Nos. | (15.) | Reactor | 15 KL | 11 Nos. | (16.) | Reactor | 16 KL | 29 Nos. | (17.) | Reactor | 20 KL | 17 Nos. | (18.) | Reactor | 0.87 KL | 2 Nos. | (19.) | Reactor | 0.5 KL | 4 Nos. | (20.) | Reactor | 3 KL | 1 Nos. | (21.) | Reactor | 2 KL | 1 Nos. | (22.) | Reactor | 2.5 KL | 1 Nos. | (23.) | Reactor | 4 KL | 7 Nos. | (24.) | Reactor | 4.5 KL | 1 Nos. | (25.) | Reactor | 8 KL | 16 Nos. | (26.) | Reactor | 12.5 KL | 24 Nos. | (27.) | Reactor | 18 KL | 2 Nos. | (28.) | Reactor | 2.5 KL | 3 Nos. | (29.) | Reactor | 2.6 KL | 2 Nos. | (30.) | Reactor | 1 KL | 5 Nos. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Benzene Derivatives | 5896 | Tons per Annum | | Road | | (2.) | Chlorinated Paraffin Wax | 1870 | Tons per Annum | | Road | | (3.) | Heterocyclic Derivatives | 4735 | Tons per Annum | | Road | | (4.) | Napthelene Based Dye Intermediates | 115 | Tons per Annum | | Road | | (5.) | Para quinone Derivatives | 30 | Tons per Annum | | Road | | (6.) | Pyridine Derivatives | 2930 | Tons per Annum | | Road | | (7.) | Pyrimidine Derivatives | 2089 | Tons per Annum | | Road | | (8.) | Pyrimidine-Pyridine Derivatives | 640 | Tons per Annum | | Road | | (9.) | Quinoxaline Derivatives | 50 | Tons per Annum | | Road | | (10.) | Triazine Derivatives | 280 | Tons per Annum | | Road | | (11.) | Agro and Pharma Intermediates (Napthols & Bases) | 3444 | Tons per Annum | | Road | | (12.) | Thiol Derivatives | 490 | Tons per Annum | | Road | | (13.) | R & D Product | 360 | Tons per Annum | | Road | | (14.) | Electrolyte | 30 | Tons per Annum | | Road | | (15.) | Pyrimidine Chloro Derivatives | 1840 | Tons per Annum | | Road | | (16.) | Benzene Nitro Derivatives | 184 | Tons per Annum | | Road | | (17.) | Benzidines and Alkyl Aromatics | 130 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Mar 2020 | (iv)Valid Upto | 15 Jan 2025 | (v)File No. | AWH - 107037 | (vi)Application No. | 15600 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 469.03 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 20.02 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.90 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 11.16 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1413276 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1413276 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HCI [ 30%] | 2012.69 | Tons per Annum | | Local Market | Road | | 17 | Open Market | | Copy of Linkage | (2.) | Acetic acid | 4365.19 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | (3.) | Xylene | 10701.3 | Tons per Annum | | Local Market | Road | | 50 | Open Market | | Copy of Linkage | (4.) | Thionyl chloride | 6091.44 | Tons per Annum | | Local Market | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Bromine | 4724.73 | Tons per Annum | | Local Market | Road | | 15 | Open Market | | Copy of Linkage | (6.) | Isopropyl Acetate | 9048 | Tons per Annum | | Local Market | Road | | 150 | Open Market | | Copy of Linkage | (7.) | EDC | 8810 | Tons per Annum | | Local Market | Road | | 45 | Open Market | | Copy of Linkage | (8.) | Sulfuric Acid | 21060 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | (9.) | Toluene | 10310.27 | Tons per Annum | | Local Market | Road | | 58 | Open Market | | Copy of Linkage | (10.) | Chlorine | 2769.65 | Tons per Annum | | Local Market | Road | | 7 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 96.12 | 49.25 | 95.54 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58.10 | 26.65 | 58 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 26.72 | 16.92 | 25.77 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 28.53 | 17.52 | 27.63 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 32 | 8 | 80 | 120 | (2.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (3.) | Heavy Metals | | Zinc | mg/l | | 0 | 0 | 5 | 15 | (4.) | TDS | | | mg/l | | 2160 | 182 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 549.76 | 62 | 250 | 1000 | (6.) | pH | | | NA | | 8.34 | 6.78 | 6.5 | 8.5 | (7.) | Total Hardness | | | mg/l | | 866.64 | 60 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.80 | 5.80 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | COD | | mg/l | | 2.46 | 2.46 | A | (4.) | pH | | NA | | 7.48 | 7.48 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54 | 45 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44 | 42 | 45 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 164.5 | 98.5 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 5.08 | 1.38 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 89.27 | 15.9 | (4.) | pH | | | 7.99 | 7.21 | (5.) | K(Potassium) | Milligram per Kilogram | | 721 | 326.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply | 2290 | 10 | Copy of Permission Letter | Pipeline | | Others | GIDC Pipeline | NTA/ANK/DEE(WS)/1992 | 08 Nov 2019 | 2290 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 91 | 160 | STP | Others | Reuse in Gardening | 91 | 0 | (2.) | Industrial | 753 | 855 | ETP, Stripper, MEE, ATFD & RO | Others | FETP of NCT | 77 | 676 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 844 | (b)Total Discharged Water (Kilolitre per Day) | 676 | (c)Total Reused Water (Kilolitre per Day) | 168 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Fly Ash | Fly Ash | | 360 | Tons | 40 | Road | | Others | Sent to Brick manufacturer. | (2.) | Distillation Residue | Industrial Waste | | 1220 | Tons | 19 | Road | | Co-Processing | | (3.) | Process Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1240 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Spent Acid | Industrial Waste | | 5492.45 | Tons | 60 | Road | | Others | Company have Valid Rule - 9 Permission | (5.) | Inorganic Acid | Industrial Waste | | 20236 | Tons | 80 | Road | | Others | Company have Valid Rule - 9 Permission | (6.) | Spent Solvent | Industrial Waste | | 1456 | Tons | 7 | Road | | Others | Under Rule - 9 | (7.) | Spent Catalyst | Industrial Waste | | 85.6 | Tons | 15 | Road | | Others | Company have Valid Rule - 9 Permission | (8.) | Spent Solvent | Industrial Waste | | 69410.36 | Tons | 65 | Road | | Others | Company have Valid Rule - 9 Permission S | (9.) | Used Oil | Industrial Waste | | 70 | Tons | 10 | Road | | Others | sell to authorized re-refiners/recyclers | (10.) | Chemical Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 19800 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (11.) | Incinerator ash & Flue Gas cleaning residue | Industrial Waste | | 320 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (12.) | Empty Barrels/ Containers/Bags/Liners contaminated | Industrial Waste | | 315 | Tons | 10 | Road | | Others | Send back to supplier | (13.) | Metal hydrogen Sulphates | Industrial Waste | | 4274 | Tons | 150 | Road | | Others | Company have Valid Rule - 9 Permission | (14.) | Ammonia | Industrial Waste | | 5768 | Tons | 50 | Road | | Others | Company have Valid Rule - 9 Permission | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 96.12 | 2.73 | 0.01 | 96.14 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 58.10 | 2.73 | 0.01 | 58.12 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 26.72 | 2.73 | 0.02 | 26.75 | 80 | (4.) | NOx | | Microgram per Meter Cube | 28.53 | 2.73 | 0.0 | 28.54 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | boiler - I | Natural Gas | 42 | 0.3 | Others | SPM, SO2, NOx | 150-262-94 | (2.) | Boiler - III | Coal | 44 | 0.3 | Others | SPM, SO2, NOx | 150-262-94 | (3.) | Boiler - II | Natural Gas | 44 | 0.3 | Others | SPM, SO2, NOx | 150-262-94 | (4.) | Boiler - V | Coal | 44 | 0.3 | Others | SPM, SO2, NOx | 150-262-94 | (5.) | Boiler - IV | Coal | 44 | 0.3 | Others | SPM, SO2, NOx | 150-262-94 | (6.) | D.G Set | Diesel | 11 | 0.2 | Others | SPM, SO2, NOx | 150-262-94 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 14000 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 7000 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 10.2746 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 10.2746 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 2.2938 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0.1167 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0.3592 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : (Scrub land, Residential Area, Mud Flats | 0.38 | Total (ha.) | 3.1496999999999997 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 6.16 | | (2.) | Green belt | | 4.1146 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | -- | (2.) | ESZs | NA | 0 | -- | (3.) | Corridors | NA | 0 | -- | (4.) | Wildlife Corridors | NA | 0 | -- | (5.) | ESAs | NA | 0 | -- | (6.) | Critically Polluted Area | Ankleshwar | 3 | -- | (7.) | NPA | NA | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | -- | (2.) | Archaeological Sites | | NA | 0 | -- | (3.) | Defence Installations | | NA | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.27 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 10 Schedule-I Species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 10.225 Lakh | (iii)Period of Implementation | 2 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 60 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 350 | (f)Total Manpower | 120 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 4.11 | (b)Percentage of Total Project Area | 40.00 | (c)No. of Plants to be Planted | 5212 | (d)Funds Allocated for Plantation | 14600000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against NABET/QCI | (ii)Name of the EIA Consultant | M/s. Aqua Air Environmental Engineers. Pvt. Ltd. | (iii)Address | 403, CENTER POINT, NR. KADIWALA SCHOOL, RING ROAD, SURAT – 395002 (GUJ.) INDIA | (iv)Mobile No. | 9904496967 | (v)Landline No. | 0261246085 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 03 Mar 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS Reply | 31 Aug 2020 | 2. | NA | The Committee has opined that if there is storage of raw materials having high safety issues, the project proponent shall go for advanced modelling and prediction and make management plan accordingly. The Committee after detailed deliberations, deferred the proposal and insisted for requisite information/clarification with respect to the following:
(i) As project is located at CPA, PP needs to submit the Zero Liquid Discharge plan as per Ministry’s OM dated 31.10.2019 (CPA).
(ii) PP needs to submit the following details on the Risk associated with the hazardous chemicals proposed to be used as a raw material;
· Risk need to be carried out for medium and catastrophic ruptures/leak even for Methanol, Bromine including Hydrochloric acid, Sulphuric acid and Benzoyl Chloride etc.
· Frequency/Probability of leak per year as done for any risk analysis.
· Individual risk contours and societal risk F-N curves to assess against risk acceptance criteria using advanced 3D modeling.
(iii) Adequate Plan for storage of rain water.
(iv) PP needs to submit copy of all CTOs since inception of the project and the production details to verify the violation case, if any.
(v) The Committee noted that for PM10 & PM2.5 value, the incremental value w.r.t. GLC is reported as 0.01-0.02 μg/ m3. In this regard verification of incremental values w.r.t. GLC and revised data needs to be submitted. | 26 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Arun Mehta | Designation | General Manager | Name of Company (Applicant Name should not be given here) | M/S. SAJJAN INDIA LIMITED | Address | Plot No. 6102-6103, 6117-6119, 5809-5810, GIDC Estate, Ankleshwar |
|