Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of 9 MMTPA Cauvery Basin Refinery at Panangudi village, Tehsil & District Nagapattinam, Tamil Nadu
(b)Name of the Company / Organisation CHENNAI PETROLEUM CORPORATION LIMITED
(c)Registered Address 536,ANNA SALAI TEYNAMPET CHENNAI,,Chennai,Tamil Nadu-600018
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mr R llango
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address 536 ANNA SALAI TEYNAMPET CHENNAI,,,Chennai,Tamil Nadu-600018
(d)Pin code 600018
(e)E-mail rilango@cpcl.co.in
(f)STD Code. 44(f)Telephone No. 24345238
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
5(c) Petro-chemical complexes (industries based on processing of
6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/IND2/76843/2018
(d)Master Proposal Number(Single Window) SW/152603/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 96,97-1A,176-1B2,184-2D,187-1A,203-1A,207,208,209
(b)Pincode 611002
(c)Bounded Latitudes (North)
From
Degree 104849
Minutes
Second
From
Degree 105026
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 794746
Minutes
Second
From
Degree 794900
Minutes
Second
(e)Survey of India Topo Sheet No. C44H13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduNagapattinamNagapattinam
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/276/2018-IA-II(I)
(b)Date of Apply of TOR 04 Sep 2018
(c)Date of Issue of TOR / Standard ToR 11 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :1.4
CPCL Township
State :Tamil Nadu
District :Nagapattinam
Tehsil :Nagapattinam
Village :Panangudi
683CSR Fund, Project Affected Persons, Local Employment, Infrastructure, Pollution, LivelihoodDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Indmax Fluidised Catalytic Cracker Unit2673 KTPA
(2.)Indmax Gasoline Desulphurisation Unit700 KTPA
(3.)Hydrogen Plant78 KTPA
(4.)Straight Run(SR) LPG Treating Unit255 KTPA
(5.)Diesel Hydrotreating Unit (DHDT)4500 KTPA
(6.)Octamax Unit110 KTPA
(7.)PolyPropylene Unit (PPU)475X1.15 KTPA
(8.)CDU/VDU Unit9000 KTPA
(9.)Naphtha Hydrotreater (NHT)1500 KTPA
(10.)Cracked LPG Treating Unit1300 KTPA
(11.)SR LPG Amine Treating Unit235 KTPA
(12.)Isomerisation Unit (ISOM)570 KTPA
(13.)Continuous Catalytic Regeneration Reformer Unit625 KTPA
(14.)VGO Hydrotreater Unit (VGO HDT)3000 KTPA
(15.)Delayed Coker Unit (DCU)2500 KTPA
(16.)Sulfur Recovery Unit2 X 144 KTPA
(17.)Fuel Gas Amine Treating Unit78 KTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG676OthersKTPARoad,OthersPipeline/Ship
(2.)BS VI Regular Gasoline1260OthersKTPARoad,OthersPipeline/Ship
(3.)BS VI Premium Gasoline540OthersKTPARoad,OthersPipeline/Ship
(4.)ATF300OthersKTPARoad,OthersPipeline/Ship
(5.)BS VI Diesel3998OthersKTPARoad,OthersPipeline/Ship
(6.)Polypropylene532OthersKTPARoad,OthersShip
(7.)Total Gasoline1800OthersKTPARoad,OthersPipeline/Ship
(8.)Sulphur238OthersKTPARoad
(9.)DCU Coke221OthersKTPARoad,OthersInternal Consumption
(10.)Fuel & Loss1253OthersKTPAOthersInternal Consumption
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Jun 2019
(iv)Valid Upto 31 Mar 2020
(v)File No. 1908121657221
(vi)Application No. 21657221
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 32908
(b) Funds Allocated for Environment Management (Capital) (in Crores) 199.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 57.635
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 9
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 9
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CRUDE OIL9OthersMMTPABasrah crude-IraqOthersVLCC/SPM/Pipeline26 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube16815.080
(2.)PM10Micro Gram per Meter Cube784676.4100
(3.)PM2.5Micro Gram per Meter Cube462444.360
(4.)SO2Micro Gram per Meter Cube1059.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l378222200600
(2.)TDSmg/l6924025002000
(3.)pHNA8.027.186.58.5
(4.)TSSmg/l741520
(5.)Chloridesmg/l182482501000
(6.)Fluoridemg/l0.940.451.01.5
(7.)Heavy MetalsLeadmg/l0.010.010.010.01
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.167.74C
(2.)DOmg/l7.04.5C
(3.)BODmg/l12.06.0C
(4.)CODmg/l3918C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))52.840.255
(2.)Leq(Day)A-weighted decibels(dB(A))64.452.465
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.826.94
(2.)N(Nitrogen)Milliequivalents per 100 Gram22.618.2
(3.)P(Phosphorus)Milliequivalents per 100 Gram0.980.74
(4.)K(Potassium)Milliequivalents per 100 Gram2.40.8
(5.)Electric ConductivityMillisiemens per Centimetre392256
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 9.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 2.64
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4(156)/SECR/CGWA/2009-925
(f)Date of Issue 07 Jun 2010
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater172812Copy of Permission LetterPipelineTube Well21-4(156)/SECR/CGWA/2009-92507 Jun 20101728
(2.)Sea2127128Copy of Permission LetterPipelineOthersDesalination Unit4936/EC.3/2020-121 Mar 2020212712
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 79200
(c)Quantity of Brine (KLD) 142152
(d)Mode of Disposal of Brine A 8 km pipeline from refinery to sea
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)ETP1320013200Activated Sludge ProcessReuse within the Plant & Recycling13200
(2.)RO-DM864030720Reverse osmosisDischarge into Seawater Body8640
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 21840
(b)Total Discharged Water (Kilolitre per Day) 8640
(c)Total Reused Water (Kilolitre per Day) 13200
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)GDS- Ax Trap 401 AdsorbentIndustrial Waste0.32Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)DHDT Spent CatalystIndustrial Waste108.75Tons0.5RoadAuthorized Recyclers
(3.)MS Block-ACT 069,078,139Industrial Waste0.37Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)PPU AdsorbentIndustrial Waste14.51Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)GDS-ACT 068,078,108,139Industrial Waste0.24Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)INDMAX GDS- InertballIndustrial Waste3.7Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)CCR Spent CatalystIndustrial Waste5.79Tons0.5RoadAuthorized Recyclers
(8.)NHT Spent CatalystIndustrial Waste3.38Tons0.5RoadAuthorized Recyclers
(9.)ISOM Spent CatalystIndustrial Waste24.01Tons0.5RoadAuthorized Recyclers
(10.)DHDT - InertballIndustrial Waste0.6Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(11.)ETP sludgeIndustrial Waste1460Tons0.5RoadOthersLandfill
(12.)VGOHDT-ACT 069,077,935,991Industrial Waste1.38Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)MS Block- InertballIndustrial Waste6.6Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(14.)VGOHDT- InertballIndustrial Waste19.7Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)Tank sludgeIndustrial Waste1000Tons0.5RoadOthersLandfill
(16.)SRU Spent CatalystIndustrial Waste75.37Tons0.5RoadAuthorized Recyclers
(17.)INDMAX GDS Spent CatalystIndustrial Waste18.46Tons0.5RoadAuthorized Recyclers
(18.)VGO HDT Spent CatalystIndustrial Waste123.45Tons0.5RoadAuthorized Recyclers
(19.)GDS - Ax Trap 867Industrial Waste0.72Tons0.5RoadTreatment, Storage and Disposal Facility(TSDF)
(20.)SRU - InertballIndustrial Waste8.8Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(21.)Octamax Spent CatalystIndustrial Waste166.72Tons0.5RoadAuthorized Recyclers
(22.)MS Block-AdsorbentIndustrial Waste68.50Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(23.)General Solid WasteIndustrial Waste1500Tons0.5RoadOthersLandfill
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.00078.1100
(2.)PM2.5Microgram per Meter Cube46.00046.160
(3.)SO2Microgram per Meter Cube9.72141.351.0280
(4.)NOxMicrogram per Meter Cube15.080.635.050.0980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CDU VDU HeaterFuel Oil/Fuel Gas854.6SO232.475
(2.)CDU VDU HeaterFuel Oil/Fuel Gas854.6NOx17.69
(3.)DCU Coker Heater BFuel Oil/Fuel Gas672.6NOx5.51
(4.)INDMAX Fresh Feed PreheaterFuel Gas601.60SO20.25
(5.)NHT Reactor Feed HeaterFuel Gas501.11SO20.15
(6.)NHT Reactor Feed HeaterFuel Gas501.11NOx1.01
(7.)NHT Stripper ReboilerFuel Gas501.75SO20.14
(8.)NHT Stripper ReboilerFuel Gas501.75NOx0.91
(9.)INDMAX GDS HDS HeaterFuel Gas401.36SO21.73
(10.)DCU Coker Heater BFuel Oil/Fuel Gas672.6SO210.12
(11.)VGO HDT Reactor Feed HeaterFuel Oil/Fuel Gas501.42NOx2.33
(12.)INDMAX Air HeaterFuel Gas605.0NOx25.0
(13.)NHT Splitter Reboiler HeaterFuel Gas501.75NOx1.48
(14.)SRU 1Fuel Oil/Fuel Gas801.82SO210.63
(15.)SRU 1Fuel Oil/Fuel Gas801.82NOx4.25
(16.)Utility BoilerFuel Oil/Fuel Gas653.1SO229.16
(17.)GT-HRSGFuel Oil/Fuel Gas703.7SO238.88
(18.)Utility BoilerFuel Oil/Fuel Gas653.1NOx19.44
(19.)DHDT Reactor Charge HeaterFuel Oil/Fuel Gas502.12SO26.35
(20.)DHDT Reactor Charge HeaterFuel Oil/Fuel Gas502.12NOx3.46
(21.)DHDT Fractionator Reboiler HeaterFuel Oil/Fuel Gas501.14NOx1.41
(22.)INDMAX Air HeaterFuel Gas605.0SO20.33
(23.)CFBC Boilers 3&4- stack 2Petcoke1303.0NOx22.0
(24.)CCR PreheaterFuel Gas602.65NOx5.88
(25.)INDMAX GDS Splitter HeaterFuel Gas401.36SO21.11
(26.)SRU 2Fuel Oil/Fuel Gas801.82NOx4.25
(27.)INDMAX Flue Gas StackFCC Coke605.0SO235.88
(28.)INDMAX Flue Gas StackFCC Coke605.0NOx25.0
(29.)VGO HDT Reactor Feed HeaterFuel Oil/Fuel Gas501.42SO23.97
(30.)INDMAX Fresh Feed PreheaterFuel Gas601.60NOx1.69
(31.)CCR PreheaterFuel Gas602.65SO20.88
(32.)INDMAX GDS HDS HeaterFuel Gas401.36NOx1.01
(33.)HGUFuel Gas704.22SO20.61
(34.)CFBC Boilers 1&2 - stack 1Petcoke1303.0NOx22.0
(35.)CFBC Boilers 3&4- stack 2Petcoke1303.0SO222.0
(36.)GT-HRSGFuel Oil/Fuel Gas703.7NOx27.77
(37.)DCU Coker Heater AFuel Oil/Fuel Gas672.6SO210.12
(38.)DCU Coker Heater AFuel Oil/Fuel Gas672.6NOx5.51
(39.)NHT Splitter Reboiler HeaterFuel Gas501.75SO20.22
(40.)INDMAX GDS Splitter HeaterFuel Gas401.36NOx0.65
(41.)SRU 2Fuel Oil/Fuel Gas801.82SO210.63
(42.)DHDT Fractionator Reboiler HeaterFuel Oil/Fuel Gas501.14SO22.42
(43.)CFBC Boilers 1 & 2 - stack 1Petcoke1303.0SO222
(44.)HGUFuel Gas704.22NOx15.41
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 205000
(b)Source State Grid and CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 271.22
(c)Government Land (ha.) 22.71
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 250.21
    Total Land (ha.) 544.14
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 289.08
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 4.85
(j)Others (ha.) : CPCL Own Land 250.21
    Total (ha.)
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt176.63All along the Plant boundary
(2.)Main Plant350.66Plant with all facilities
(3.)OthersROW of Pipeline & LFP16.85Outside of the plant boundary
Total (ha.) 544.14
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo0Not Applicable
(2.)NPANo0Not Applicable
(3.)CorridorsNo0Not Applicable
(4.)Critically Polluted AreaNo0Not Applicable
(5.)ESAsNo0Not Applicable
(6.)ESZsNo0Not Applicable
(7.)Wildlife CorridorsNo0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNo0Not Applicable
(2.)ForestNo0Not Applicable
(3.)Archaeological SitesNo0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 300
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 250.21
(b)Land yet to be acquired(Ha) 293.93
(c)Status of Land acquisition if not acquired In Progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 5
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Gaint Grouper, Sea Horse, Olive Ridley, Indian Peafowl, White bellied Sea Eagle, Indian Rock Python
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 75 lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vettar river
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 2500
(d)Temporary Employment- During Operation 1000
(e)No. of working days 330
(f)Total Manpower 4100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 176.63
(b)Percentage of Total Project Area 32.46
(c)No. of Plants to be Planted 264945
(d)Funds Allocated for Plantation 100000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCreation of direct and indirect employment
(2.)EnvironmentalProduction of BS VI clean fuel which will reduce SOx emission
(3.)FinancialSelf sufficient for supply of petroleum product to South India
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0041
(ii)Name of the EIA Consultant Engineers India Limited
(iii)Address EIL Office Complex, Sector16, On NH48
(iv)Mobile No. 9818669575
(v)Landline No. 1243803035
(vi)Email Id jk.joshi@eil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThis has reference to the Additional Details Sought by Member Secretary on proposal no. IA/TN/IND2/76843/2018 uploaded in ministry website on 29.06.2020. We are hereby submitting the following information as per ADS with supporting documents. 18 Jul 2020
2.NA

The Committee after detailed deliberations desired for additional information/inputs in respect of the following:

 

 (i).        Confirm the applicability of CRZ Notification/CRZ Clearance for the project site as well as the proposed pipeline.Also, submit Marine Conservation plan.

(ii).        Public hearing issues, action plan along with budget provisions.

(iii).        Comparison of emission w.r.t. Sulphur content with other refineries.

(iv).        Revised water balance with improvement in evaporation loss and commitment not to use ground water.

(v).        Socio-economic status report of the study area

(vi).        Detailed CER plan along with action plan for drinking water facility for the people.

(vii).        Provision for employment to the local people.

(viii).        In view of several recent  chemical accidents occurred in various parts of  the country, the risk studies need to be carried out  basedon the following protocolusing 3 D modelling which incorporates dispersion of vertical component vital for developing&placing accident prevention programin place:

 

        Material Safety Data Sheet (MSDS/MDS)

        Hazard Identification, Consequence analysis in terms of effect / threat zone distances.

        Risk need to be carried out for Small, Medium, Larger and Catastrophic ruptures /leak and to be modeled as representative cases.Frequency/ Probability of leak per year.

        Risk needs to be quantified interms of Individual Risk Contours

        Societal risk

        F-N curves to assess against risk acceptance criteria (HSE,UK etc.)..

(ix).        Air dispersion formula to determine stack height

(x).        Plan for installation of solar power and utilization in the plant

(xi).        Details of wildlife sanctuary/ESA and environmental sensitivity within 10 km of the project site.

 

The proposal was therefore deferred for the needful.

29 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMr R llango
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)CHENNAI PETROLEUM CORPORATION LIMITED
Address536,ANNA SALAI TEYNAMPET CHENNAI
Print