1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Installation of 9 MMTPA Cauvery Basin Refinery at Panangudi village, Tehsil & District Nagapattinam, Tamil Nadu | (b)Name of the Company / Organisation | CHENNAI PETROLEUM CORPORATION LIMITED | (c)Registered Address | 536,ANNA SALAI TEYNAMPET CHENNAI,,Chennai,Tamil Nadu-600018 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mr R llango | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | 536 ANNA SALAI TEYNAMPET CHENNAI,,,Chennai,Tamil Nadu-600018 | (d)Pin code | 600018 | (e)E-mail | rilango@cpcl.co.in | (f)STD Code. | 44(f)Telephone No. | 24345238 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry 5(c) Petro-chemical complexes (industries based on processing of 6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/IND2/76843/2018 | (d)Master Proposal Number(Single Window) | SW/152603/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 96,97-1A,176-1B2,184-2D,187-1A,203-1A,207,208,209 | (b)Pincode | 611002 | (c)Bounded Latitudes (North) | | From | | Degree | 104849 | Minutes | | Second | | From | | Degree | 105026 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 794746 | Minutes | | Second | | From | | Degree | 794900 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | C44H13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 7 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 2 | (c)Main State of the project | Tamil Nadu | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Tamil Nadu | Nagapattinam | Nagapattinam | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/276/2018-IA-II(I) | (b)Date of Apply of TOR | 04 Sep 2018 | (c)Date of Issue of TOR / Standard ToR | 11 Oct 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Sep 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.4 |
| CPCL Township | State : | Tamil Nadu | District : | Nagapattinam | Tehsil : | Nagapattinam | Village : | Panangudi |
| 683 | CSR Fund, Project Affected Persons, Local Employment, Infrastructure, Pollution, Livelihood | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Indmax Fluidised Catalytic Cracker Unit | 2673 KTPA | | (2.) | Indmax Gasoline Desulphurisation Unit | 700 KTPA | | (3.) | Hydrogen Plant | 78 KTPA | | (4.) | Straight Run(SR) LPG Treating Unit | 255 KTPA | | (5.) | Diesel Hydrotreating Unit (DHDT) | 4500 KTPA | | (6.) | Octamax Unit | 110 KTPA | | (7.) | PolyPropylene Unit (PPU) | 475X1.15 KTPA | | (8.) | CDU/VDU Unit | 9000 KTPA | | (9.) | Naphtha Hydrotreater (NHT) | 1500 KTPA | | (10.) | Cracked LPG Treating Unit | 1300 KTPA | | (11.) | SR LPG Amine Treating Unit | 235 KTPA | | (12.) | Isomerisation Unit (ISOM) | 570 KTPA | | (13.) | Continuous Catalytic Regeneration Reformer Unit | 625 KTPA | | (14.) | VGO Hydrotreater Unit (VGO HDT) | 3000 KTPA | | (15.) | Delayed Coker Unit (DCU) | 2500 KTPA | | (16.) | Sulfur Recovery Unit | 2 X 144 KTPA | | (17.) | Fuel Gas Amine Treating Unit | 78 KTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | LPG | 676 | Others | KTPA | Road,Others | Pipeline/Ship | (2.) | BS VI Regular Gasoline | 1260 | Others | KTPA | Road,Others | Pipeline/Ship | (3.) | BS VI Premium Gasoline | 540 | Others | KTPA | Road,Others | Pipeline/Ship | (4.) | ATF | 300 | Others | KTPA | Road,Others | Pipeline/Ship | (5.) | BS VI Diesel | 3998 | Others | KTPA | Road,Others | Pipeline/Ship | (6.) | Polypropylene | 532 | Others | KTPA | Road,Others | Ship | (7.) | Total Gasoline | 1800 | Others | KTPA | Road,Others | Pipeline/Ship | (8.) | Sulphur | 238 | Others | KTPA | Road | | (9.) | DCU Coke | 221 | Others | KTPA | Road,Others | Internal Consumption | (10.) | Fuel & Loss | 1253 | Others | KTPA | Others | Internal Consumption | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 10 Jun 2019 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 1908121657221 | (vi)Application No. | 21657221 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 32908 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 199.40 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 57.635 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.00 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 9 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 9 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 9 | Others | MMTPA | Basrah crude-Iraq | Others | VLCC/SPM/Pipeline | 26 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 16 | 8 | 15.0 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 78 | 46 | 76.4 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 46 | 24 | 44.3 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 10 | 5 | 9.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 378 | 222 | 200 | 600 | (2.) | TDS | | | mg/l | | 692 | 402 | 500 | 2000 | (3.) | pH | | | NA | | 8.02 | 7.18 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 7 | 4 | 15 | 20 | (5.) | Chlorides | | | mg/l | | 182 | 48 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.94 | 0.45 | 1.0 | 1.5 | (7.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.16 | 7.74 | C | (2.) | DO | | mg/l | | 7.0 | 4.5 | C | (3.) | BOD | | mg/l | | 12.0 | 6.0 | C | (4.) | COD | | mg/l | | 39 | 18 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.8 | 40.2 | 55 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.4 | 52.4 | 65 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.82 | 6.94 | (2.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 22.6 | 18.2 | (3.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 0.98 | 0.74 | (4.) | K(Potassium) | Milliequivalents per 100 Gram | | 2.4 | 0.8 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 392 | 256 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.0 To 9.45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.5 To 2.64 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4(156)/SECR/CGWA/2009-925 | (f)Date of Issue | 07 Jun 2010 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1728 | 12 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(156)/SECR/CGWA/2009-925 | 07 Jun 2010 | 1728 | (2.) | Sea | | 212712 | 8 | Copy of Permission Letter | Pipeline | | Others | Desalination Unit | 4936/EC.3/2020-1 | 21 Mar 2020 | 212712 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 79200 | (c)Quantity of Brine (KLD) | 142152 | (d)Mode of Disposal of Brine | A 8 km pipeline from refinery to sea | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | ETP | 13200 | 13200 | Activated Sludge Process | Reuse within the Plant & Recycling | | 13200 | | (2.) | RO-DM | 8640 | 30720 | Reverse osmosis | Discharge into Seawater Body | | | 8640 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 21840 | (b)Total Discharged Water (Kilolitre per Day) | 8640 | (c)Total Reused Water (Kilolitre per Day) | 13200 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | GDS- Ax Trap 401 Adsorbent | Industrial Waste | | 0.32 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | DHDT Spent Catalyst | Industrial Waste | | 108.75 | Tons | 0.5 | Road | | Authorized Recyclers | | (3.) | MS Block-ACT 069,078,139 | Industrial Waste | | 0.37 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | PPU Adsorbent | Industrial Waste | | 14.51 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | GDS-ACT 068,078,108,139 | Industrial Waste | | 0.24 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | INDMAX GDS- Inertball | Industrial Waste | | 3.7 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | CCR Spent Catalyst | Industrial Waste | | 5.79 | Tons | 0.5 | Road | | Authorized Recyclers | | (8.) | NHT Spent Catalyst | Industrial Waste | | 3.38 | Tons | 0.5 | Road | | Authorized Recyclers | | (9.) | ISOM Spent Catalyst | Industrial Waste | | 24.01 | Tons | 0.5 | Road | | Authorized Recyclers | | (10.) | DHDT - Inertball | Industrial Waste | | 0.6 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (11.) | ETP sludge | Industrial Waste | | 1460 | Tons | 0.5 | Road | | Others | Landfill | (12.) | VGOHDT-ACT 069,077,935,991 | Industrial Waste | | 1.38 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | MS Block- Inertball | Industrial Waste | | 6.6 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (14.) | VGOHDT- Inertball | Industrial Waste | | 19.7 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (15.) | Tank sludge | Industrial Waste | | 1000 | Tons | 0.5 | Road | | Others | Landfill | (16.) | SRU Spent Catalyst | Industrial Waste | | 75.37 | Tons | 0.5 | Road | | Authorized Recyclers | | (17.) | INDMAX GDS Spent Catalyst | Industrial Waste | | 18.46 | Tons | 0.5 | Road | | Authorized Recyclers | | (18.) | VGO HDT Spent Catalyst | Industrial Waste | | 123.45 | Tons | 0.5 | Road | | Authorized Recyclers | | (19.) | GDS - Ax Trap 867 | Industrial Waste | | 0.72 | Tons | 0.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (20.) | SRU - Inertball | Industrial Waste | | 8.8 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (21.) | Octamax Spent Catalyst | Industrial Waste | | 166.72 | Tons | 0.5 | Road | | Authorized Recyclers | | (22.) | MS Block-Adsorbent | Industrial Waste | | 68.50 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (23.) | General Solid Waste | Industrial Waste | | 1500 | Tons | 0.5 | Road | | Others | Landfill | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 78.0 | 0 | 0 | 78.1 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 46.0 | 0 | 0 | 46.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 9.72 | 1 | 41.3 | 51.02 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.08 | 0.6 | 35.0 | 50.09 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | CDU VDU Heater | Fuel Oil/Fuel Gas | 85 | 4.6 | SO2 | | 32.475 | (2.) | CDU VDU Heater | Fuel Oil/Fuel Gas | 85 | 4.6 | NOx | | 17.69 | (3.) | DCU Coker Heater B | Fuel Oil/Fuel Gas | 67 | 2.6 | NOx | | 5.51 | (4.) | INDMAX Fresh Feed Preheater | Fuel Gas | 60 | 1.60 | SO2 | | 0.25 | (5.) | NHT Reactor Feed Heater | Fuel Gas | 50 | 1.11 | SO2 | | 0.15 | (6.) | NHT Reactor Feed Heater | Fuel Gas | 50 | 1.11 | NOx | | 1.01 | (7.) | NHT Stripper Reboiler | Fuel Gas | 50 | 1.75 | SO2 | | 0.14 | (8.) | NHT Stripper Reboiler | Fuel Gas | 50 | 1.75 | NOx | | 0.91 | (9.) | INDMAX GDS HDS Heater | Fuel Gas | 40 | 1.36 | SO2 | | 1.73 | (10.) | DCU Coker Heater B | Fuel Oil/Fuel Gas | 67 | 2.6 | SO2 | | 10.12 | (11.) | VGO HDT Reactor Feed Heater | Fuel Oil/Fuel Gas | 50 | 1.42 | NOx | | 2.33 | (12.) | INDMAX Air Heater | Fuel Gas | 60 | 5.0 | NOx | | 25.0 | (13.) | NHT Splitter Reboiler Heater | Fuel Gas | 50 | 1.75 | NOx | | 1.48 | (14.) | SRU 1 | Fuel Oil/Fuel Gas | 80 | 1.82 | SO2 | | 10.63 | (15.) | SRU 1 | Fuel Oil/Fuel Gas | 80 | 1.82 | NOx | | 4.25 | (16.) | Utility Boiler | Fuel Oil/Fuel Gas | 65 | 3.1 | SO2 | | 29.16 | (17.) | GT-HRSG | Fuel Oil/Fuel Gas | 70 | 3.7 | SO2 | | 38.88 | (18.) | Utility Boiler | Fuel Oil/Fuel Gas | 65 | 3.1 | NOx | | 19.44 | (19.) | DHDT Reactor Charge Heater | Fuel Oil/Fuel Gas | 50 | 2.12 | SO2 | | 6.35 | (20.) | DHDT Reactor Charge Heater | Fuel Oil/Fuel Gas | 50 | 2.12 | NOx | | 3.46 | (21.) | DHDT Fractionator Reboiler Heater | Fuel Oil/Fuel Gas | 50 | 1.14 | NOx | | 1.41 | (22.) | INDMAX Air Heater | Fuel Gas | 60 | 5.0 | SO2 | | 0.33 | (23.) | CFBC Boilers 3&4- stack 2 | Petcoke | 130 | 3.0 | NOx | | 22.0 | (24.) | CCR Preheater | Fuel Gas | 60 | 2.65 | NOx | | 5.88 | (25.) | INDMAX GDS Splitter Heater | Fuel Gas | 40 | 1.36 | SO2 | | 1.11 | (26.) | SRU 2 | Fuel Oil/Fuel Gas | 80 | 1.82 | NOx | | 4.25 | (27.) | INDMAX Flue Gas Stack | FCC Coke | 60 | 5.0 | SO2 | | 35.88 | (28.) | INDMAX Flue Gas Stack | FCC Coke | 60 | 5.0 | NOx | | 25.0 | (29.) | VGO HDT Reactor Feed Heater | Fuel Oil/Fuel Gas | 50 | 1.42 | SO2 | | 3.97 | (30.) | INDMAX Fresh Feed Preheater | Fuel Gas | 60 | 1.60 | NOx | | 1.69 | (31.) | CCR Preheater | Fuel Gas | 60 | 2.65 | SO2 | | 0.88 | (32.) | INDMAX GDS HDS Heater | Fuel Gas | 40 | 1.36 | NOx | | 1.01 | (33.) | HGU | Fuel Gas | 70 | 4.22 | SO2 | | 0.61 | (34.) | CFBC Boilers 1&2 - stack 1 | Petcoke | 130 | 3.0 | NOx | | 22.0 | (35.) | CFBC Boilers 3&4- stack 2 | Petcoke | 130 | 3.0 | SO2 | | 22.0 | (36.) | GT-HRSG | Fuel Oil/Fuel Gas | 70 | 3.7 | NOx | | 27.77 | (37.) | DCU Coker Heater A | Fuel Oil/Fuel Gas | 67 | 2.6 | SO2 | | 10.12 | (38.) | DCU Coker Heater A | Fuel Oil/Fuel Gas | 67 | 2.6 | NOx | | 5.51 | (39.) | NHT Splitter Reboiler Heater | Fuel Gas | 50 | 1.75 | SO2 | | 0.22 | (40.) | INDMAX GDS Splitter Heater | Fuel Gas | 40 | 1.36 | NOx | | 0.65 | (41.) | SRU 2 | Fuel Oil/Fuel Gas | 80 | 1.82 | SO2 | | 10.63 | (42.) | DHDT Fractionator Reboiler Heater | Fuel Oil/Fuel Gas | 50 | 1.14 | SO2 | | 2.42 | (43.) | CFBC Boilers 1 & 2 - stack 1 | Petcoke | 130 | 3.0 | SO2 | | 22 | (44.) | HGU | Fuel Gas | 70 | 4.22 | NOx | | 15.41 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 205000 | (b)Source | State Grid and CPP | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 271.22 | (c)Government Land (ha.) | 22.71 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 250.21 | Total Land (ha.) | 544.14 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 289.08 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 4.85 | (j)Others (ha.) : CPCL Own Land | 250.21 | Total (ha.) | | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 176.63 | All along the Plant boundary | (2.) | Main Plant | | 350.66 | Plant with all facilities | (3.) | Others | ROW of Pipeline & LFP | 16.85 | Outside of the plant boundary | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | No | 0 | Not Applicable | (2.) | NPA | No | 0 | Not Applicable | (3.) | Corridors | No | 0 | Not Applicable | (4.) | Critically Polluted Area | No | 0 | Not Applicable | (5.) | ESAs | No | 0 | Not Applicable | (6.) | ESZs | No | 0 | Not Applicable | (7.) | Wildlife Corridors | No | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | No | 0 | Not Applicable | (2.) | Forest | | No | 0 | Not Applicable | (3.) | Archaeological Sites | | No | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 250.21 | (b)Land yet to be acquired(Ha) | 293.93 | (c)Status of Land acquisition if not acquired | In Progress | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 5 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Gaint Grouper, Sea Horse, Olive Ridley, Indian Peafowl, White bellied Sea Eagle, Indian Rock Python | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 75 lakhs | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vettar river | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 2500 | (d)Temporary Employment- During Operation | 1000 | (e)No. of working days | 330 | (f)Total Manpower | 4100 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 176.63 | (b)Percentage of Total Project Area | 32.46 | (c)No. of Plants to be Planted | 264945 | (d)Funds Allocated for Plantation | 100000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Creation of direct and indirect employment | (2.) | Environmental | Production of BS VI clean fuel which will reduce SOx emission | (3.) | Financial | Self sufficient for supply of petroleum product to South India | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0041 | (ii)Name of the EIA Consultant | Engineers India Limited | (iii)Address | EIL Office Complex, Sector16, On NH48 | (iv)Mobile No. | 9818669575 | (v)Landline No. | 1243803035 | (vi)Email Id | jk.joshi@eil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | This has reference to the Additional Details Sought by Member Secretary on proposal no. IA/TN/IND2/76843/2018 uploaded in ministry website on 29.06.2020. We are hereby submitting the following information as per ADS with supporting documents. | 18 Jul 2020 | 2. | NA |
The Committee after detailed deliberations desired for additional information/inputs in respect of the following:
(i). Confirm the applicability of CRZ Notification/CRZ Clearance for the project site as well as the proposed pipeline.Also, submit Marine Conservation plan.
(ii). Public hearing issues, action plan along with budget provisions.
(iii). Comparison of emission w.r.t. Sulphur content with other refineries.
(iv). Revised water balance with improvement in evaporation loss and commitment not to use ground water.
(v). Socio-economic status report of the study area
(vi). Detailed CER plan along with action plan for drinking water facility for the people.
(vii). Provision for employment to the local people.
(viii). In view of several recent chemical accidents occurred in various parts of the country, the risk studies need to be carried out basedon the following protocolusing 3 D modelling which incorporates dispersion of vertical component vital for developing&placing accident prevention programin place:
• Material Safety Data Sheet (MSDS/MDS)
• Hazard Identification, Consequence analysis in terms of effect / threat zone distances.
• Risk need to be carried out for Small, Medium, Larger and Catastrophic ruptures /leak and to be modeled as representative cases.Frequency/ Probability of leak per year.
• Risk needs to be quantified interms of Individual Risk Contours
• Societal risk
• F-N curves to assess against risk acceptance criteria (HSE,UK etc.)..
(ix). Air dispersion formula to determine stack height
(x). Plan for installation of solar power and utilization in the plant
(xi). Details of wildlife sanctuary/ESA and environmental sensitivity within 10 km of the project site.
The proposal was therefore deferred for the needful. | 29 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mr R llango | Designation | General Manager | Name of Company (Applicant Name should not be given here) | CHENNAI PETROLEUM CORPORATION LIMITED | Address | 536,ANNA SALAI TEYNAMPET CHENNAI |
|