(a)Name of the project(s) Proposed Expansion of Limestone Production Capacity from 0.45 MTPA to 1.0 MTPA with Installation of 400 TPH crusher of Rajashree Limestone Mine No. 2 (M.L. Area- 400.70 ha)
(b)Name of the Company / Organisation M/s UltraTech Cement Limited (Unit: Birla White)
(c)Registered Address Ahura Center, B wing, 2nd floor, Mahakali Caves Road,Andheri (East), Mumbai,Mumbai City,Maharashtra-400093
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajesh Kumar Kedia
(b)Designation (Owner/ Partner/ CEO) Assistant General Manager
(c)Address NIL
(d)Pin code 342003
(e)E-mail rajesh.kedia@adityabirla.com
(f)STD Code. 29(f)Telephone No. 2431715
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/MIN/7497/2005
(d)Master Proposal Number(Single Window) SW/152405/2020
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map is enclosed with EIA/EMP Report
(b)Pincode 342902
(c)Bounded Latitudes (North)
From
Degree 26345888
Minutes
Second
From
Degree 26363206
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7347638
Minutes
Second
From
Degree 73491602
Minutes
Second
(e)Survey of India Topo Sheet No. 45 F/10, 45 F/14 & 45 F/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 323
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/15/2005-IA.II(M)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 28 Jan 2005
(c)Date of Issue of EC 17 Nov 2005
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Feb 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Mar 2017
Distance of Public Hearing Venue from the Proposed Project :22
Upkhand Karyalaya, Meta City
State :Rajasthan
District :Nagaur
Tehsil :Mertacity
Village :Basni
106i) The company has not done anything under its CSR.ii) Personnel Protective Equipments are not being provided to workers.iii) Blasting practices are accomplished by un-trained persons and under-age chOthersRegional Officer, RSPCB, Kishangarh & Additional District Collector, Nagaur
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/Mine-260/383/2005/49
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 21 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)400.704500005500001000000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Wagon Drill112-
(2.)Jack Hammer325-
(3.)Dumper4812-
(4.)JCB235-
(5.)Water Tanker3-3-
(6.)Shovel-22-
(7.)Compressor3-3-
(8.)Truck601474-
(9.)Sizing & Screening Plant1-1-
(10.)Crusher-11-
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 19 May 2016
(iv)Valid Upto 30 Apr 2019
(v)File No. F (Mines)/Nagaur (Merta)/2614 (1)/2016-2017/1840-1
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 15
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 618.05
(b)Existing quantity of raw material/fuel 361.35
(c)Total quantity of raw material/fuel 979.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel979.4Otherskilo Liter per AnnumGotanRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2015 To 31 May 2015
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45.525.045.160
(2.)SO2Micro Gram per Meter Cube11.25.210.880
(3.)PM10Micro Gram per Meter Cube90.265.189.7100
(4.)NOxMicro Gram per Meter Cube30.816.730.5180
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l649.51333.68200600
(3.)pHNA7.997.726.58.5
(4.)TDSmg/l196913405002000
(5.)Chloridesmg/l723.18404.982501000
(6.)Fluoridemg/l1.320.8311.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA0.00.0E
(2.)CODmg/l0.00.0E
(3.)BODmg/l0.00.0E
(4.)DOmg/l0.00.0E
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))48.243.070
(2.)Leq(Day)A-weighted decibels(dB(A))61.254.375
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare241.9278.40
(2.)pH7.557.29
(3.)P(Phosphorus)Kilogram per hectare32.5625.72
(4.)Electric ConductivityMillisiemens per Centimetre0.350.29
(5.)N(Nitrogen)Kilogram per hectare270.34182.78
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 135 To 145
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 125 To 135
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFrom Near by Villages19.510Copy of Permission LettermodeOthersThrough TankersOthersNearby VillagesNil09 May 201919.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Sanitation2.30.0Disposed off into soak pit via septic tankOthersDisposed off into soak pit septic tank0.02.3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2.3
(b)Total Discharged Water (Kilolitre per Day) 2.3
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top SoilOthersTop Soil48000Tons0.3OthersHaul RoadOthersstacked separately & later use for plantation
(2.)WasteOtherswaste230000Tons0.3Othershaul roadOthersBackfilling
(3.)Over BurdenOthersWaste1240000Tons0.3OthersHaul RoadOthersBackfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.200.21.8492.05100
(2.)PM2.5Microgram per Meter Cube45.500.20.6946.2060
(3.)SO2Microgram per Meter Cube11.20.20.0211.2380
(4.)NOxMicrogram per Meter Cube30.80.20.1530.9680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CrusherNA301.0OthersPM0.22 gm/sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 571
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 260.70
(c)Government Land (ha.) 140.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 400.70
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 260.70
(b)Waste/Barren Land (ha.) 140.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.0
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Other 0.0 0.0
    Total (ha.) 400.7
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt68.80-
(2.)Built Up Area1.93-
(3.)OthersUndisturbed Area199.63-
(4.)LandFill66.41This is excavated area which will be backfield
(5.)Water Reservoir63.93Excavated area converted into water reservoir
Total (ha.) 400.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0.0None
(2.)Critically Polluted AreaNone0.0None
(3.)WLSNone0.0None
(4.)CorridorsNone0.0None
(5.)NPANone0.0None
(6.)Wildlife CorridorsNone0.0None
(7.)ESZsNone0.0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0.0None
(2.)Archaeological SitesNone0.0None
(3.)Defence InstallationsNone0.0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 153.35
(b)Land yet to be acquired(Ha) 106.35
(c)Status of Land acquisition if not acquired Rest 141 ha land is being used on the basis of sur
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 63
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Banka Bala Nalllah passing through the North eastern part of the lease area
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jojri River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 39
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 39
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Funds Allocated3000002700000027300000
(2.)Total Area of Green Belt29106.21135.20999999999998
(3.)Percentage of Total Project Area7.2326.5033.730000000000004
(4.)No. of Plants17199159315176514
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalb. At conceptual stage, 66.41 ha area will be reclaimed and backfilled followed by plantation and remaining 63.93 ha area will be converted into water reservoir.
(2.)Socialc. The Project is being/will contribute additional revenue to the State and Central Govt. in the form of royalty, cess and taxes etc.
(3.)FinancialThe various activities proposed through CER (Corporate Environment Responsibility) would help in upgradation of basic infrastructure, amenities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 1.23
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3) (1634)/2015 RCM-AJM/680
(b)Date of Approval 09 Jun 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 400.70
(f)Approved Capacity 1.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 34.53
(b)Mineable Reserves (Million Ton) 22.11
(c)Extractable Reserves(Million Ton) 22.11
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 48
(f)Stripping Ratio 1.0 : 0.59
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 28
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1400 400 TPH Capacity of Crusher to be installed
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 400.70
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Because part of lease is transferred
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 400.70
(iii)Validity of the lease deed From : 29 Oct 1986 To : 28 Oct 2036
(iv)Date of Execution of Mining Lese 24 Oct 2018
(v)Reference Number Gotan/Chief/ML3/95/3010
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 28 Nov 1997 From : 29 Oct 1996 To : 28 Oct 2016 Copy of Earlier LeaseP. 16(4)Khan/Group-1/96 400.70 Lease renewed for 20 years
(2.)Transfer 01 Jul 2002 From : 01 Jul 2002 To : 28 Oct 2016 Copy of Earlier LeaseDMG/Gotan/CC7/F.1(1)395/687 400.70 Lease transferred from IRIL to GIL
(3.)Transfer 09 Jul 1987 From : 07 Jul 1987 To : 28 Oct 1996 Copy of Earlier LeaseP.41/24/Mine/Group-2/85 400.70 Part of lease was transferred
(4.)Transfer 26 Jun 2018 From : 24 Oct 2018 To : 28 Oct 2036 Copy of Earlier LeaseP.16(4)/Mine/Group-1/1996 400.70 Lease was transferred from GIL to UTCL
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.17
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.17
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.17
11.
Details of Final Mine Void:
(a)Area (in Hectare) 63.93
(b)Depth (in meter) 37
(c)Volume (in Million Cubic meter) 23.65
12.
Details of Quarry:
(a)Final Void of 63.93 (hectare) at a Depth of 37 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 130.34
13.
Details of Transportation:
(a)In Pit/Underground to Surface None
(b)Surface to Siding/Loading By Dumpers/trucks
(c)Transportation / Conveyor Details By Dumpers/trucks
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES0.00.00
(2.)AGRICULTURE LAND260.700.0260.7
(3.)GRAZING LAND0.00.00
(4.)WASTE LAND140.00.0140
(5.)SETTLEMENTS0.00.00
(6.)FOREST LAND0.00.00
TOTAL400.70400.7
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0.00.00.00
(2.)OtherUndisturbed+Crusher0.00.0199.88199.88
(3.)EXTERNAL OB DUMPS0.00.00.00
(4.)VIRGIN AREA0.00.00.00
(5.)ROADS0.00.01.381.38
(6.)BUILT UP AREA (COLONY/OFFICE)0.00.00.300.3
(7.)INTERNAL OB DUMPS0.00.00.00
(8.)EXCAVATION/QUARRY66.4163.930.0130.34
(9.)GREEN BELT68.800.00.068.8
TOTAL135.2163.93201.560400.7
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0.0
(b)Internal Dump(in hectare) 0.0
(c)Quarry(in hectare) 130.34
(d)Safety Zone(in hectare) 8.70
(e)Final Void of 63.93 (hectare) at a Depth of 37 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 201.56
(h)Total afforestation plant (in hectare) 135.21
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 39.11
Total Area Backfilled after Excavation (in hectare) 0.0
Total Area Reclaimed (in hectare) 0.0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20080.450.450.450.280.0
(2.)20150.450.450.420.380.0
(3.)20070.450.450.240.200.0
(4.)20160.450.450.440.430.0
(5.)20090.450.450.450.280.0
(6.)20110.450.450.450.340.0
(7.)20120.450.450.450.370.0
(8.)20050.450.450.200.120.0
(9.)20060.450.450.220.210.0
(10.)20180.450.450.700.440.0
(11.)20130.450.450.450.350.0
(12.)20170.450.450.650.440.0
(13.)20100.450.450.450.300.0
(14.)20140.450.450.370.270.0
(15.)20190.450.450.750.430.0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/1103
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana)-122001
(iv)Mobile No. 9910494521
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajesh Kumar Kedia
DesignationAssistant General Manager
Name of Company (Applicant Name should not be given here)M/s UltraTech Cement Limited (Unit: Birla White)
AddressAhura Center, B wing, 2nd floor, Mahakali Caves Road
Print