Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Asset Development Project-1 by Nayara Energy Limited at Vadinar, Devbhumi Dwarka, Gujarat
(b)Name of the Company / Organisation NAYARA ENERGY LIMITED
(c)Registered Address KHAMBHALIA, P.O.BOX NO.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Devbhumi Dwarka,Gujarat-361305
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ASMITA PATEL
(b)Designation (Owner/ Partner/ CEO) HEADENVIRONMENT
(c)Address KHAMBHALIA, P.O.BOX.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Khambhalia,Devbhumi Dwarka,Gujarat-361305
(d)Pin code 361305
(e)E-mail priya.ayengar@nayaraenergy.com
(f)STD Code. 2833(f)Telephone No. 662506
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
5(c) Petro-chemical complexes (industries based on processing of
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/152329/2020
(d)Master Proposal Number(Single Window) SW/152320/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 12,14,16,129,135,223,224,225
(b)Pincode 361305
(c)Bounded Latitudes (North)
From
Degree 22.310758
Minutes
Second
From
Degree 22.354772
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 69.728611
Minutes
Second
From
Degree 69.772777
Minutes
Second
(e)Survey of India Topo Sheet No. F42J11, F42J12, F42J15, F42J16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 50
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. File No.: 5-26/2008(ENV)/63
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 30 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG9382701208OthersKTPARoad,Rail
(2.)Naphtha/MS/Gasoline4200-6603540OthersKTPARoad,Rail,OthersJetty
(3.)Petcoke2247402287OthersKTPARoad,Rail,OthersJetty
(4.)Bitumen377-3770OthersKTPARoad,Rail,OthersJetty
(5.)SKO/ATF872-140732OthersKTPARoad,Rail,OthersJetty
(6.)Diesel/HSD970653910245OthersKTPARoad,Rail,OthersJetty
(7.)Furnace Oil/VGO220-18535OthersKTPARoad,Rail,OthersJetty
(8.)Sulphur3181319OthersKTPARoad,Rail,OthersJetty
(9.)Polypropylene0450450OthersKTPARoad,Rail,OthersJetty
(10.)Fuel & Losses1120631183OthersKTPAPipe Conveyor
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Refinery20 MMTPA020 MMTPANo throughput increase
(2.)Polypropylene Unit0450 KTPA450 KTPANew Plant
(3.)Propylene Recovery Unit0450 KTPA450 KTPANew Plant
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Oct 2016
(iv)Valid Upto 16 Sep 2022
(v)File No. AWH-81987
(vi)Application No. 111130
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6200
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 19.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CRUDE OIL20OthersMMTPAWorldwideOthersJetty21 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.49 To 3.12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.07 To 23.18
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea221.321 Not Appliacble PipelineOthersSea water intake well at Jetty16011/22/2000-IA-III03 Nov 20001
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 6600
(c)Quantity of Brine (KLD) 10900
(d)Mode of Disposal of Brine Deep Sea Discharge
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process2710030000Effluent Treatment PlantReuse within the Plant & Recycling27100
(2.)Cooling Tower blowdown365000No treatment RequiredDischarge into Seawater Body36500
(3.)Desalination/RO Reject1084000No treatment requiredDischarge into Seawater Body108400
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 172000
(b)Total Discharged Water (Kilolitre per Day) 144900
(c)Total Reused Water (Kilolitre per Day) 27100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)270Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube261.2026.180
(2.)PM10Microgram per Meter Cube1401.20140.1100
(3.)NOxMicrogram per Meter Cube321.2032.180
(4.)PM2.5Microgram per Meter Cube421.2042.160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HMU-1FG454.7OthersPM, SO2, NOX, CO1.98, 9.91, 69.37, 29.73
(2.)CDU-2FO+FG1003.5OthersPM, SO2, NOX, CO4.89, 83.05, 21.98, 9.77
(3.)SRUPROCESS STACK803.2OthersNOX, CO15.87, 6.80
(4.)SRU-IIPROCESS STACK823.9OthersNOX, CO29.88, 12.81
(5.)HMU-2FG454.7OthersPM, SO2, NOX, CO1.86, 9.28, 64.94, 27.83
(6.)NHTCCRFG1305.7OthersPM, SO2, NOX, CO2.61, 13.06, 91.41, 39.18
(7.)POLYPROPYLENEFG301OthersVOC0.002
(8.)CDU/VDUFO+FG1305.7OthersPM, SO2, NOX, CO24.8, 409.3, 108.34, 48.15
(9.)DHDSFG702.4OthersPM, SO2, NOX, CO0.53, 2.64, 18.45, 7.91
(10.)FCC REGENERATORPROCESS STACK1103.5OthersPM, SO2, NOX, CO21.17, 359.81, 95.24, 84.66
(11.)SRU-IPROCESS STACK823.9OthersNOX, CO29.96, 12.84
(12.)MINI HMUFG15.781.05OthersPM, SO2, NOX, CO0.09, 0.47, 3.30, 1.42
(13.)DHDTFO+FG602.8OthersPM, SO2, NOX, CO4.26, 72.50, 19.19, 8.53
(14.)FCC HEATERFG1103.7OthersPM, SO2, NOX, CO0.54, 2.68, 18.77, 8.04
(15.)DCU-1FG652.5OthersPM, SO2, NOX, CO0.3, 1.51, 10.56, 4.53
(16.)DCU-2FG652.5OthersPM, SO2, NOX, CO0.29, 1.43, 10.03, 4.3
(17.)DCU-3FG652.5OthersPM, SO2, NOX, CO0.42, 2.09, 14.60, 6.26
(18.)VGOMHCFO+FG603.1OthersPM, SO2, NOX, CO6.76, 114.91, 30.42, 13.52
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 199000
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 40
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 40
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Marked land for ADP-1 Project 40
    Total (ha.) 40.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant40Proposed Land for ADP-1
Total (ha.) 40
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00NA
(2.)ESAsNA00NA
(3.)NPANA00NA
(4.)ESZsNA00NA
(5.)CorridorsNA00NA
(6.)Wildlife CorridorsNA00NA
(7.)WLSMarine Sanctuary2.36From north east boundary of refinery.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00NA
(2.)ForestReserve Forest7.5Near Sinhan dam,Danta village
(3.)Defence InstallationsNA00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 40
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 40 Lakh
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. WLP/32/C/1019-20/2019-20
(iii)Date of issue 19 Feb 2020
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sinhan Dam
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 7000
(d)Temporary Employment- During Operation 0
(e)No. of working days 340
(f)Total Manpower 7150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4100410
(2.)Percentage of Total Project Area33.85033.85
(3.)No. of Plants3000000300000
(4.)Funds Allocated10000000010000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalBesides the tangible benefits, the project will have number of intangible benefits like use of latest world class technology for polypropylene production resulting into maximum recovery of product and negligible emissions, less wastes generation, negligible impact on environment.
(2.)SocialProposed project shall have social benefits in terms of large-scale employment during construction phase as well as during operational phase. The proposed developmental activities in this region will result in improvement of infrastructure as well as upliftment of social structure in the area.
(3.)FinancialThe major benefit envisaged from the project is that it will boost industrial development of the region due to assured availability of petroleum products to Country/State and industries concerned. As a result, there would be more opportunities for employment generation to the locals especially the youths. The project in general would accelerate the overall socio-economic development of the region by way of direct and indirect taxes, resources utilization, employment and infrastructure developmen
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Gujarat
(d)Case No. SCA 15322/2019
(e)Orders/Directions of the court ,if any and its relevance with the proposed project No stay granted. Few Procedural orders were passed
(f)Case Details IN THE HIGH COURT OF GUJARAT AT AHMEDABAD CIVIL AP
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Direction under section-5 of the Environment Protection Act 1986
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Direction has been complied with and revoked by CP
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720 RA 0088
(ii)Name of the EIA Consultant CSIR-NEERI
(iii)Address CSIR-NEERI, Nehru Marg, Nagpur-440020
(iv)Mobile No. 9423400740
(v)Landline No. 0114560910
(vi)Email Id sk_goyal@neeri.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i)pl provide Copy of the earlier valid EC. (ii) Admissibility of the present proposal under para7(ii)of the EIA notf. 2006. (iii) whether the present proposal/product was covered under the expansion of refinery proposal submitted earlier for which PH was required. 28 May 2020
2.NAThe correction have been made as per the instruction received 20 Jul 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantASMITA PATEL
DesignationHEADENVIRONMENT
Name of Company (Applicant Name should not be given here)NAYARA ENERGY LIMITED
AddressKHAMBHALIA, P.O.BOX NO.24