|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Asset Development Project-1 by Nayara Energy Limited at Vadinar, Devbhumi Dwarka, Gujarat | (b)Name of the Company / Organisation | NAYARA ENERGY LIMITED | (c)Registered Address | KHAMBHALIA, P.O.BOX NO.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Devbhumi Dwarka,Gujarat-361305 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | ASMITA PATEL | (b)Designation (Owner/ Partner/ CEO) | HEADENVIRONMENT | (c)Address | KHAMBHALIA, P.O.BOX.24,DIST. DEVBHUMI DWARKA, GUJARAT - 361305, INDIA,Khambhalia,Devbhumi Dwarka,Gujarat-361305 | (d)Pin code | 361305 | (e)E-mail | priya.ayengar@nayaraenergy.com | (f)STD Code. | 2833(f)Telephone No. | 662506 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/152329/2020 | (d)Master Proposal Number(Single Window) | SW/152320/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 12,14,16,129,135,223,224,225 | (b)Pincode | 361305 | (c)Bounded Latitudes (North) | | From | | Degree | 22.310758 | Minutes | | Second | | From | | Degree | 22.354772 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 69.728611 | Minutes | | Second | | From | | Degree | 69.772777 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F42J11, F42J12, F42J15, F42J16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 50 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | File No.: 5-26/2008(ENV)/63 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 30 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | LPG | 938 | 270 | 1208 | Others | KTPA | Road,Rail | | (2.) | Naphtha/MS/Gasoline | 4200 | -660 | 3540 | Others | KTPA | Road,Rail,Others | Jetty | (3.) | Petcoke | 2247 | 40 | 2287 | Others | KTPA | Road,Rail,Others | Jetty | (4.) | Bitumen | 377 | -377 | 0 | Others | KTPA | Road,Rail,Others | Jetty | (5.) | SKO/ATF | 872 | -140 | 732 | Others | KTPA | Road,Rail,Others | Jetty | (6.) | Diesel/HSD | 9706 | 539 | 10245 | Others | KTPA | Road,Rail,Others | Jetty | (7.) | Furnace Oil/VGO | 220 | -185 | 35 | Others | KTPA | Road,Rail,Others | Jetty | (8.) | Sulphur | 318 | 1 | 319 | Others | KTPA | Road,Rail,Others | Jetty | (9.) | Polypropylene | 0 | 450 | 450 | Others | KTPA | Road,Rail,Others | Jetty | (10.) | Fuel & Losses | 1120 | 63 | 1183 | Others | KTPA | Pipe Conveyor | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Refinery | 20 MMTPA | 0 | 20 MMTPA | No throughput increase | (2.) | Polypropylene Unit | 0 | 450 KTPA | 450 KTPA | New Plant | (3.) | Propylene Recovery Unit | 0 | 450 KTPA | 450 KTPA | New Plant | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Oct 2016 | (iv)Valid Upto | 16 Sep 2022 | (v)File No. | AWH-81987 | (vi)Application No. | 111130 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 6200 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 19.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.14 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 20 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 20 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 20 | Others | MMTPA | Worldwide | Others | Jetty | 21 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.49 To 3.12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.07 To 23.18 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 221.3 | 21 | Not Appliacble | Pipeline | | Others | Sea water intake well at Jetty | 16011/22/2000-IA-III | 03 Nov 2000 | 1 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 6600 | (c)Quantity of Brine (KLD) | 10900 | (d)Mode of Disposal of Brine | Deep Sea Discharge | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process | 27100 | 30000 | Effluent Treatment Plant | Reuse within the Plant & Recycling | | 27100 | | (2.) | Cooling Tower blowdown | 36500 | 0 | No treatment Required | Discharge into Seawater Body | | | 36500 | (3.) | Desalination/RO Reject | 108400 | 0 | No treatment required | Discharge into Seawater Body | | | 108400 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 172000 | (b)Total Discharged Water (Kilolitre per Day) | 144900 | (c)Total Reused Water (Kilolitre per Day) | 27100 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 270 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 26 | 1.2 | 0 | 26.1 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 140 | 1.2 | 0 | 140.1 | 100 | (3.) | NOx | | Microgram per Meter Cube | 32 | 1.2 | 0 | 32.1 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 42 | 1.2 | 0 | 42.1 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | HMU-1 | FG | 45 | 4.7 | Others | PM, SO2, NOX, CO | 1.98, 9.91, 69.37, 29.73 | (2.) | CDU-2 | FO+FG | 100 | 3.5 | Others | PM, SO2, NOX, CO | 4.89, 83.05, 21.98, 9.77 | (3.) | SRU | PROCESS STACK | 80 | 3.2 | Others | NOX, CO | 15.87, 6.80 | (4.) | SRU-II | PROCESS STACK | 82 | 3.9 | Others | NOX, CO | 29.88, 12.81 | (5.) | HMU-2 | FG | 45 | 4.7 | Others | PM, SO2, NOX, CO | 1.86, 9.28, 64.94, 27.83 | (6.) | NHTCCR | FG | 130 | 5.7 | Others | PM, SO2, NOX, CO | 2.61, 13.06, 91.41, 39.18 | (7.) | POLYPROPYLENE | FG | 30 | 1 | Others | VOC | 0.002 | (8.) | CDU/VDU | FO+FG | 130 | 5.7 | Others | PM, SO2, NOX, CO | 24.8, 409.3, 108.34, 48.15 | (9.) | DHDS | FG | 70 | 2.4 | Others | PM, SO2, NOX, CO | 0.53, 2.64, 18.45, 7.91 | (10.) | FCC REGENERATOR | PROCESS STACK | 110 | 3.5 | Others | PM, SO2, NOX, CO | 21.17, 359.81, 95.24, 84.66 | (11.) | SRU-I | PROCESS STACK | 82 | 3.9 | Others | NOX, CO | 29.96, 12.84 | (12.) | MINI HMU | FG | 15.78 | 1.05 | Others | PM, SO2, NOX, CO | 0.09, 0.47, 3.30, 1.42 | (13.) | DHDT | FO+FG | 60 | 2.8 | Others | PM, SO2, NOX, CO | 4.26, 72.50, 19.19, 8.53 | (14.) | FCC HEATER | FG | 110 | 3.7 | Others | PM, SO2, NOX, CO | 0.54, 2.68, 18.77, 8.04 | (15.) | DCU-1 | FG | 65 | 2.5 | Others | PM, SO2, NOX, CO | 0.3, 1.51, 10.56, 4.53 | (16.) | DCU-2 | FG | 65 | 2.5 | Others | PM, SO2, NOX, CO | 0.29, 1.43, 10.03, 4.3 | (17.) | DCU-3 | FG | 65 | 2.5 | Others | PM, SO2, NOX, CO | 0.42, 2.09, 14.60, 6.26 | (18.) | VGOMHC | FO+FG | 60 | 3.1 | Others | PM, SO2, NOX, CO | 6.76, 114.91, 30.42, 13.52 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 199000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 40 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 40 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Marked land for ADP-1 Project | 40 | Total (ha.) | 40.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 40 | Proposed Land for ADP-1 | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 00 | NA | (2.) | ESAs | NA | 00 | NA | (3.) | NPA | NA | 00 | NA | (4.) | ESZs | NA | 00 | NA | (5.) | Corridors | NA | 00 | NA | (6.) | Wildlife Corridors | NA | 00 | NA | (7.) | WLS | Marine Sanctuary | 2.36 | From north east boundary of refinery. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 00 | NA | (2.) | Forest | | Reserve Forest | 7.5 | Near Sinhan dam,Danta village | (3.) | Defence Installations | | NA | 00 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 40 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 40 Lakh | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | WLP/32/C/1019-20/2019-20 | (iii)Date of issue | 19 Feb 2020 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sinhan Dam | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 7000 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 340 | (f)Total Manpower | 7150 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 410 | 0 | 410 | (2.) | Percentage of Total Project Area | 33.85 | 0 | 33.85 | (3.) | No. of Plants | 300000 | 0 | 300000 | (4.) | Funds Allocated | 10000000 | 0 | 10000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Besides the tangible benefits, the project will have number of intangible benefits like use of latest world class technology for polypropylene production resulting into maximum recovery of product and negligible emissions, less wastes generation, negligible impact on environment. | (2.) | Social | Proposed project shall have social benefits in terms of large-scale employment during construction phase as well as during operational phase. The proposed developmental activities in this region will result in improvement of infrastructure as well as upliftment of social structure in the area. | (3.) | Financial | The major benefit envisaged from the project is that it will boost industrial development of the region due to assured availability of petroleum products to Country/State and industries concerned. As a result, there would be more opportunities for employment generation to the locals especially the youths. The project in general would accelerate the overall socio-economic development of the region by way of direct and indirect taxes, resources utilization, employment and infrastructure developmen | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Gujarat | (d)Case No. | SCA 15322/2019 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | No stay granted. Few Procedural orders were passed | (f)Case Details | IN THE HIGH COURT OF GUJARAT AT AHMEDABAD CIVIL AP | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Direction under section-5 of the Environment Protection Act 1986 | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Direction has been complied with and revoked by CP | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720 RA 0088 | (ii)Name of the EIA Consultant | CSIR-NEERI | (iii)Address | CSIR-NEERI, Nehru Marg, Nagpur-440020 | (iv)Mobile No. | 9423400740 | (v)Landline No. | 0114560910 | (vi)Email Id | sk_goyal@neeri.res.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 13 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i)pl provide Copy of the earlier valid EC.
(ii) Admissibility of the present proposal under para7(ii)of the EIA notf. 2006.
(iii) whether the present proposal/product was covered under the expansion of refinery proposal submitted earlier for which PH was required. | 28 May 2020 | 2. | NA | The correction have been made as per the instruction received | 20 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | ASMITA PATEL | Designation | HEADENVIRONMENT | Name of Company (Applicant Name should not be given here) | NAYARA ENERGY LIMITED | Address | KHAMBHALIA, P.O.BOX NO.24 |
|