Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Phase III Expansion of Krishnapatnam Port at SPSR Nellore District, Andhra Pradesh
(b)Name of the Company / Organisation Krishnapatnam Port Company Ltd
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address NIL
(d)Pin code 382421
(e)E-mail ceo@krishnapatnamport.com
(f)STD Code. (f)Telephone No.
(g)Fax No. 23337789
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/MIS/566/2009
(d)Master Proposal Number(Single Window) SW/152304/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 456/3,473/51,476/B,654/2-attached along with Topos
(b)Pincode 524344
(c)Bounded Latitudes (North)
From
Degree 14.2214083
Minutes
Second
From
Degree 14.29472222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.10138889
Minutes
Second
From
Degree 80.13222222
Minutes
Second
(e)Survey of India Topo Sheet No. 66-B/03, 66-B/04
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 11-62/2009-IA.III
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 06 Jul 2009
(c)Date of Issue of EC 13 Nov 2009
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PH was conducted in 2009 for PH-II development
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/828/AP/429
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 17 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cargo handling Capacity72.3153.7226OthersMMTPARoad,Rail,Conveyor Belt,Pipe Conveyor
(2.)Container Cargo3.32.25.5OthersMTEUsPARoad,Rail
(3.)Area124015122752Hectares(ha)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SBMs-33
(2.)Berths172037
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Jul 2018
(iv)Valid Upto 31 Oct 2023
(v)File No. APPCB/VJA/NLR/11344/CFO/HO/2017
(vi)Application No. PRN1800275
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12256
(b) Funds Allocated for Environment Management (Capital) (in Crores) 90
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 15.32
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 9
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 32.5
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 32.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Stone Aggregate11OthersMillion TonsLocal QuaryRoad50 Open MarketCopy of Linkage
(2.)Soil/Gravel17.5OthersMillion TonsLocal QuaryRoad50 Open MarketCopy of Linkage
(3.)Sand4OthersMillion TonsLocal QuaryRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Jan 2017 To 31 Mar 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube684567.1100
(2.)PM2.5Micro Gram per Meter Cube32.03203260
(3.)SO2Micro Gram per Meter Cube14.25414.280
(4.)NOxMicro Gram per Meter Cube20.111019.580
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3220785002000
(2.)Fluoridemg/l1.530.111.5
(3.)Heavy MetalsLeadmg/l0.040.000.010.01
(4.)TSSmg/l0000
(5.)pHNA9.046.926.58.5
(6.)Total Hardnessmg/l98436200600
(7.)Chloridesmg/l143792501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.287.57A
(2.)OthersturbidityOthersntu9.64.2A
(3.)DOmg/l6.76.1A
(4.)CODmg/l5410A
(5.)BODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))51.6351.270
(2.)Leq(Day)A-weighted decibels(dB(A))67.7864.0675
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHMilligram per Kilogram9.725.2
(2.)Electric ConductivityOthersMicro sec/cm2396.74
(3.)N(Nitrogen)Milligram per Kilogram98.45
(4.)K(Potassium)Milligram per Kilogram91810
(5.)P(Phosphorus)Milligram per Kilogram187.53
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.03 To 3.52
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface10002Copy of Permission LetterPipelineOthersNo Withdrawl773/Ports.l/201219 Aug 20131000
(2.)Surface40004.5Copy of Permission LetterPipelineOthersNo WithdrawlAF77174112 Jul 20104000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water8001000Fluidised bedReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersLoss in process8000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 800
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 800
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste365Tons0RoadOthersOnsite segregation - Organic waste compost
(2.)Non-Biodegradable WasteMunicipal Solid Waste36.5Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.68014.779.39100
(2.)PM2.5Microgram per Meter Cube32.0302.8734.9160
(3.)SO2Microgram per Meter Cube14.2502.2516.5180
(4.)NOxMicrogram per Meter Cube20.11011.932.0280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not ApplicableNA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 85000
(b)Source APTRANSCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set Generators will be used as back-up for area
(e)Stack Height (in m) 20
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 418
(b)Private Land (ha.) 0
(c)Government Land (ha.) 780
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 314
    Total Land (ha.) 1512
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 42294
(b)Waste/Barren Land (ha.) 31504
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 10668
(e)Settlements (ha.) 4254
(f)Industrial (ha.) 4855
(g)Forest (ha.) 4937
(h)Mangroves (ha.) 801
(i)Marine Area (ha.) 71587
(j)Others (ha.) : Aqua culture, sandy beach, quary 12636
    Total (ha.) 183536.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt152Greenbelt
(2.)Main Plant899Cargo Storage, Container Related activities, CFS
(3.)Built Up Area421Berths,transit, Road, Rail, parking, utilities
(4.)OthersPort Based Industry40Port Based Industry
Total (ha.) 1512
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0Not Applicable
(2.)Wildlife CorridorsNIL0Not Applicable
(3.)NPANIL0Not Applicable
(4.)ESAsMangrove Patches0Within Port Boundary
(5.)WLSNIL0Not Applicable
(6.)ESZsNIL0Not Applicable
(7.)CorridorsNIL0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNIL0Not Applicable
(2.)ForestIpuru, Thammenapatnam, Momidi, Kottapatnam RF0Reserve Forest
(3.)Archaeological SitesNIL0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land acquisition is being done by GoAP.
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Buckingham, Kandaleru, Upputeru creek and Bay of Bengal
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required the meandering arm of Kandaleru creek has to be straightened and reclaimed
(ii)Details of Study Conducted NIOT, Chennai has taken up the creek diversion stu
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 202/CRZ/IND/2019/30
(iii)Date of issue 21 May 2020
(iv)Recommendation with Pandemic situation, delay in recommendation
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Upputuru River, Kandaleru Creek, Buckingham Canal, Sarvepalli Reservoir, Penubarthi Lake, Venkatachalam lake, Kalluripalli lake, Kakutur lake and Venkannapalem lake.
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 1000
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 4500
(e)No. of working days 355
(f)Total Manpower 6200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt191.5152343.5
(2.)No. of Plants19150003040002219000
(3.)Funds Allocated80000000100000000180000000
(4.)Percentage of Total Project Area6.965.5212.48
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification III
(b)Location Type Low and Medium Eroding Coast
(c)Details of Mangroves Land Involved, if Any 25.1 Ha. will be replaced as part of ph-III expans
(d)Area of Mangroves Land (hectare) 25.1
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies 2 season (2017 and 2019) Terrestrial EIA
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 05 Jan 2017
(iv)Period of Study To (EIA Terrestrial) 31 Mar 2017
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies 3 season (Jan 2017, May 2017, November 2018)
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 30 Jan 2017
(iv)Period of Study to (EIA Marine) 30 Oct 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan KPCL port has Tier-I Oil spill plan
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing (IRS), Anna University
(ii)Please Specify with salient features Ports & Harbour
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity III
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed 1.The Project Proponent shall comply with all the
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) Entire development occurs within the approved port
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 20
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 74
(d)Total plot area (sqm) 15120000
(e)Total built up area (sqm) 149230
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Dry bulk, Liquid, Container, General
(d)Quantity of Cargo 181
(e)Control Measures of Cargo Mechanized cargo handling
(f)Dust Control Measures Implementation of dust suppression systems
(g)Quantum 90
(h)Quantity of Dredging (Cubic meter per day) 38888
(i)Type of Dredging Capital
(j)Disposal of Dredge Material 29MM3-REC, 2MM3-Shoreprot, 32MM3-disposal
(k)Details of Outfall Diffusers NA
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall Not Applicable
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 14
(d)Capacity 154600
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 80 ha for all types including trucks
5.
Energy Saving Measures:
(a)Source/Mode Solar Power, LEP lights, Wind Power
(b)Percentage 2
(c)Quantity 1700
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Creek has been straightened by forming a straight
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Maximum daily discharge from Domestic effluents after treatment in STP is 300KLD. Treated water shall be used for Plantation within the permises.
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied, half yearly compliance reports are submi
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited.
(iii)Address Parry House 3rd Floor, No.2 N.S.C. Bose Road, Chennai – 600 001, Tamil Nadu
(iv)Mobile No. 9940047988
(v)Landline No. 0443044562
(vi)Email Id inquiry@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 24 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease address following deficiencies found in your application No. IA/AP/MIS/566/2009, dated 01 May, 2020: As per ToR letter dated 04.05.2016, condition no. (ii); A separate chapter on status of compliance of Environmental Conditions granted by State/Centre to be provided. As per circular dated 30th May, 2012 issued by MoEF, a certified report by RO, MoEF on status of compliance of conditions on existing unit to be provided in EIA-EMP report. The said Certified Compliance Report is not available. As per ToR letter dated 04.05.2016, condition no. (v); recommendation of SCZMA, Andhra Pradesh is not available, which is a pre-requisite as per the CRZ Notification, 2011 (ref. clause 4 (i)(b) and 4.2 (iii)). 04 Jun 2020
2.NAThe correction have been made as per the instruction received 05 Jun 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterKindly find enclosed revised EIA report and Form 2 along with necessary annexure as per ADS generated. Due to constraints in size for uploading all the Annexures and Appendixes forming part of EIA and applications will be submitted separately. Kindly consider 26 Nov 2020
2.NA

Kindly see the minutes of 53rd EAC (Infra-2).

01 Aug 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)Krishnapatnam Port Company Ltd
AddressKrishnapatnam Port Company Ltd 1st Floor, 48-9-17, Dwarakanagar, Visakhapatnam – 530 016, Andhr
Print