1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Phase III Expansion of Krishnapatnam Port at SPSR Nellore District, Andhra Pradesh | (b)Name of the Company / Organisation | Krishnapatnam Port Company Ltd | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | | (b)Designation (Owner/ Partner/ CEO) | Authorized Signatory | (c)Address | NIL | (d)Pin code | 382421 | (e)E-mail | ceo@krishnapatnamport.com | (f)STD Code. | (f)Telephone No. | | (g)Fax No. | 23337789 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/MIS/566/2009 | (d)Master Proposal Number(Single Window) | SW/152304/2020 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 456/3,473/51,476/B,654/2-attached along with Topos | (b)Pincode | 524344 | (c)Bounded Latitudes (North) | | From | | Degree | 14.2214083 | Minutes | | Second | | From | | Degree | 14.29472222 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80.10138889 | Minutes | | Second | | From | | Degree | 80.13222222 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 66-B/03, 66-B/04 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 11-62/2009-IA.III | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 06 Jul 2009 | (c)Date of Issue of EC | 13 Nov 2009 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | PH was conducted in 2009 for PH-II development | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/828/AP/429 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 17 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Cargo handling Capacity | 72.3 | 153.7 | 226 | Others | MMTPA | Road,Rail,Conveyor Belt,Pipe Conveyor | | (2.) | Container Cargo | 3.3 | 2.2 | 5.5 | Others | MTEUsPA | Road,Rail | | (3.) | Area | 1240 | 1512 | 2752 | Hectares(ha) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | SBMs | - | 3 | 3 | | (2.) | Berths | 17 | 20 | 37 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 Jul 2018 | (iv)Valid Upto | 31 Oct 2023 | (v)File No. | APPCB/VJA/NLR/11344/CFO/HO/2017 | (vi)Application No. | PRN1800275 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12256 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 90 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 15.32 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 9 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 32.5 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 32.5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Stone Aggregate | 11 | Others | Million Tons | Local Quary | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Soil/Gravel | 17.5 | Others | Million Tons | Local Quary | Road | | 50 | Open Market | | Copy of Linkage | (3.) | Sand | 4 | Others | Million Tons | Local Quary | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 05 Jan 2017 To 31 Mar 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 68 | 45 | 67.1 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 32.03 | 20 | 32 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 14.25 | 4 | 14.2 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 20.11 | 10 | 19.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 3220 | 78 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 1.53 | 0.1 | 1 | 1.5 | (3.) | Heavy Metals | | Lead | mg/l | | 0.04 | 0.00 | 0.01 | 0.01 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | pH | | | NA | | 9.04 | 6.92 | 6.5 | 8.5 | (6.) | Total Hardness | | | mg/l | | 984 | 36 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 1437 | 9 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.28 | 7.57 | A | (2.) | Others | turbidity | Others | ntu | 9.6 | 4.2 | A | (3.) | DO | | mg/l | | 6.7 | 6.1 | A | (4.) | COD | | mg/l | | 54 | 10 | A | (5.) | BOD | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 51.63 | 51.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.78 | 64.06 | 75 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Milligram per Kilogram | | 9.72 | 5.2 | (2.) | Electric Conductivity | Others | Micro sec/cm | 239 | 6.74 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 98.4 | 5 | (4.) | K(Potassium) | Milligram per Kilogram | | 918 | 10 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 187.5 | 3 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.03 To 3.52 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1000 | 2 | Copy of Permission Letter | Pipeline | | Others | No Withdrawl | 773/Ports.l/2012 | 19 Aug 2013 | 1000 | (2.) | Surface | | 4000 | 4.5 | Copy of Permission Letter | Pipeline | | Others | No Withdrawl | AF771741 | 12 Jul 2010 | 4000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Waste Water | 800 | 1000 | Fluidised bed | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | Loss in process | 800 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 800 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 800 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Municipal Solid Waste | | 365 | Tons | 0 | Road | | Others | Onsite segregation - Organic waste compost | (2.) | Non-Biodegradable Waste | Municipal Solid Waste | | 36.5 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64.68 | 0 | 14.7 | 79.39 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 32.03 | 0 | 2.87 | 34.91 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 14.25 | 0 | 2.25 | 16.51 | 80 | (4.) | NOx | | Microgram per Meter Cube | 20.11 | 0 | 11.9 | 32.02 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 85000 | (b)Source | APTRANSCO | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG Set Generators will be used as back-up for area | (e)Stack Height (in m) | 20 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 418 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 780 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 314 | Total Land (ha.) | 1512 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 42294 | (b)Waste/Barren Land (ha.) | 31504 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 10668 | (e)Settlements (ha.) | 4254 | (f)Industrial (ha.) | 4855 | (g)Forest (ha.) | 4937 | (h)Mangroves (ha.) | 801 | (i)Marine Area (ha.) | 71587 | (j)Others (ha.) : Aqua culture, sandy beach, quary | 12636 | Total (ha.) | 183536.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 152 | Greenbelt | (2.) | Main Plant | | 899 | Cargo Storage, Container Related activities, CFS | (3.) | Built Up Area | | 421 | Berths,transit, Road, Rail, parking, utilities | (4.) | Others | Port Based Industry | 40 | Port Based Industry | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NIL | 0 | Not Applicable | (2.) | Wildlife Corridors | NIL | 0 | Not Applicable | (3.) | NPA | NIL | 0 | Not Applicable | (4.) | ESAs | Mangrove Patches | 0 | Within Port Boundary | (5.) | WLS | NIL | 0 | Not Applicable | (6.) | ESZs | NIL | 0 | Not Applicable | (7.) | Corridors | NIL | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NIL | 0 | Not Applicable | (2.) | Forest | | Ipuru, Thammenapatnam, Momidi, Kottapatnam RF | 0 | Reserve Forest | (3.) | Archaeological Sites | | NIL | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land acquisition is being done by GoAP. | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Buckingham, Kandaleru, Upputeru creek and Bay of Bengal | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | the meandering arm of Kandaleru creek has to be straightened and reclaimed | (ii)Details of Study Conducted | NIOT, Chennai has taken up the creek diversion stu | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | 202/CRZ/IND/2019/30 | (iii)Date of issue | 21 May 2020 | (iv)Recommendation | with Pandemic situation, delay in recommendation | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Upputuru River, Kandaleru Creek, Buckingham Canal, Sarvepalli Reservoir, Penubarthi Lake, Venkatachalam lake, Kalluripalli lake, Kakutur lake and Venkannapalem lake. | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 200 | (b)Permanent Employment-During Operation | 1000 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 4500 | (e)No. of working days | 355 | (f)Total Manpower | 6200 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 191.5 | 152 | 343.5 | (2.) | No. of Plants | 1915000 | 304000 | 2219000 | (3.) | Funds Allocated | 80000000 | 100000000 | 180000000 | (4.) | Percentage of Total Project Area | 6.96 | 5.52 | 12.48 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | III | (b)Location Type | Low and Medium Eroding Coast | (c)Details of Mangroves Land Involved, if Any | 25.1 Ha. will be replaced as part of ph-III expans | (d)Area of Mangroves Land (hectare) | 25.1 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | 2 season (2017 and 2019) Terrestrial EIA | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 05 Jan 2017 | (iv)Period of Study To (EIA Terrestrial) | 31 Mar 2017 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | 3 season (Jan 2017, May 2017, November 2018) | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 30 Jan 2017 | (iv)Period of Study to (EIA Marine) | 30 Oct 2018 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | KPCL port has Tier-I Oil spill plan | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | Institute of Remote Sensing (IRS), Anna University | (ii)Please Specify with salient features | Ports & Harbour | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | III | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 0 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 0 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | Yes | (i)Copy of NOC | Copy of NOC | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | 1.The Project Proponent shall comply with all the | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | Entire development occurs within the approved port | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 20 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 74 | (d)Total plot area (sqm) | 15120000 | (e)Total built up area (sqm) | 149230 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Dry bulk, Liquid, Container, General | (d)Quantity of Cargo | 181 | (e)Control Measures of Cargo | Mechanized cargo handling | (f)Dust Control Measures | Implementation of dust suppression systems | (g)Quantum | 90 | (h)Quantity of Dredging (Cubic meter per day) | 38888 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | 29MM3-REC, 2MM3-Shoreprot, 32MM3-disposal | (k)Details of Outfall Diffusers | NA | (l)No. of Dilution Expected | 0 | (m)Distance at which the Outlet will Reach Ambient Parameters | 0 | (n)Details of Monitoring at Outfall | Not Applicable | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 14 | (d)Capacity | 154600 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 80 ha for all types including trucks | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar Power, LEP lights, Wind Power | (b)Percentage | 2 | (c)Quantity | 1700 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Maximum daily discharge from Domestic effluents after treatment in STP is 300KLD. Treated water shall be used for Plantation within the permises. | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied, half yearly compliance reports are submi | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 076 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited. | (iii)Address | Parry House 3rd Floor, No.2 N.S.C. Bose Road, Chennai – 600 001, Tamil Nadu | (iv)Mobile No. | 9940047988 | (v)Landline No. | 0443044562 | (vi)Email Id | inquiry@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 24 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please address following deficiencies found in your application No.
IA/AP/MIS/566/2009, dated 01 May, 2020:
As per ToR letter dated 04.05.2016, condition no. (ii); A separate chapter on status of compliance of Environmental Conditions granted by State/Centre to be provided. As per circular dated 30th May, 2012 issued by MoEF, a certified report by RO, MoEF on status of compliance of conditions on existing unit to be provided in EIA-EMP report. The said Certified Compliance Report is not available.
As per ToR letter dated 04.05.2016, condition no. (v); recommendation of SCZMA, Andhra Pradesh is not available, which is a pre-requisite as per the CRZ Notification, 2011 (ref. clause 4 (i)(b) and 4.2 (iii)). | 04 Jun 2020 | 2. | NA | The correction have been made as per the instruction received | 05 Jun 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Kindly find enclosed revised EIA report and Form 2 along with necessary annexure as per ADS generated.
Due to constraints in size for uploading all the Annexures and Appendixes forming part of EIA and applications will be submitted separately. Kindly consider | 26 Nov 2020 | 2. | NA | Kindly see the minutes of 53rd EAC (Infra-2). | 01 Aug 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | | Designation | Authorized Signatory | Name of Company (Applicant Name should not be given here) | Krishnapatnam Port Company Ltd | Address | Krishnapatnam Port Company Ltd
1st Floor, 48-9-17, Dwarakanagar,
Visakhapatnam – 530 016, Andhr |
|