Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Additional Capital Dredging & Maintenance Dredging and Disposal of dredged material at AKBTPL, Off Tekra, Nr. Tuna Village, Kutch District, Gujarat
(b)Name of the Company / Organisation ADANI KANDLA BULK TERMINAL PRIVAT LIMITED
(c)Registered Address Adani House, Nr. Mithakhali circle, Navrangpura, Ahmedabad ,,Ahmedabad,Gujarat-380009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant P N Roy Chowdhury
(b)Designation (Owner/ Partner/ CEO) Head - Environment department
(c)Address Adani House, Nr. Mithakhali circle, Navrangpura, Ahmedabad,,Ahmadabad City,Ahmedabad,Gujarat-380009
(d)Pin code 380009
(e)E-mail shalinm.shah@adani.com
(f)STD Code. 79(f)Telephone No. 25557362
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIS/152274/2008
(d)Master Proposal Number(Single Window) SW/152273/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Area proposed for development is in offshore
(b)Pincode 370205
(c)Bounded Latitudes (North)
From
Degree 22.88671389
Minutes
Second
From
Degree 22.91813889
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.1000
Minutes
Second
From
Degree 70.10777778
Minutes
Second
(e)Survey of India Topo Sheet No. F42K1 & F42J13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 6
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratSuratChorasiSachin GIDC
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-10/2008-IA.III
(b)Date of Apply of TOR 20 Jan 2008
(c)Date of Issue of TOR / Standard ToR 20 Mar 2008
(d)Date of Apply of EC 13 Mar 2011
(e)Date of Issue of EC 01 Nov 2011
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Dec 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Jan 2018
Distance of Public Hearing Venue from the Proposed Project :4.2
Zero point (Adani Kandla Bulk Terminal Pvt. Ltd.), Nr. KPT customs building, Tuna port, Vill: Tuna, Ta: Anjar, District: Kutch, Gujarat.
State :Gujarat
District :kutch
Tehsil :Anjar
Village :Tuna
168Development of Lake, Impact of marine and terrestrial ecology, Water blockage in the river after construction of water pipeline, impact on water discharge from saltpans due to water pipeline, employmeDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 3-31/92(ENV) / 438
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 7 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Capital Dredging07.687.68OthersMillion Meter CubeOthersDredger
(2.)Maintenance Dredging1.00.21.2OthersMillion Meter cubeOthersDredger
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Berth PocketsDepth: -16.3mDepth: -19mDepth: -19m
(2.)Approach ChannelWidth : 200m, Depth : -12.3Width : 300m, Depth : -15mWidth : 300m, Depth : -15m
(3.)Turning CircleDiameter: 500m, Depth: -16.3mDiameter: 700m, Depth: -17mDiameter: 700m, Depth: -17m
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Nov 2019
(iv)Valid Upto 02 Dec 2024
(v)File No. AWH-105213
(vi)Application No. 164237
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 40.70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.407
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0OthersNot ApplicableNot ApplicableOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 22 Jan 2020 To 29 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube56.244.155.860
(2.)SO2Micro Gram per Meter Cube26.520.326.480
(3.)PM10Micro Gram per Meter Cube91.777.491.3100
(4.)NOxMicro Gram per Meter Cube36.1293680
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l904842485002000
(2.)Chloridesmg/l318618322501000
(3.)Heavy MetalsSeleniummg/l0.010.000.010.01
(4.)TSSmg/l1.01.000
(5.)Total Hardnessmg/l17801120200600
(6.)Fluoridemg/l2.41.211.5
(7.)pHNA7.677.476.58.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA9.349.05E
(2.)BODmg/l127E
(3.)CODmg/l57.837.2E
(4.)DOmg/l8.58.5A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.8171.2875
(2.)Leq(Night)A-weighted decibels(dB(A))67.5665.2570
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.360.14
(2.)pH9.69.05
(3.)P(Phosphorus)Milligram per Kilogram708147.58
(4.)K(Potassium)Milligram per Kilogram1426.89757.16
(5.)Electric ConductivityOthersMicro mho/cm582101
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGWIL00Copy of Permission LettermodeOthersTankerOthersNAAK81166107 Nov 20142000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Not Applicable00Not ApplicableOthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Not ApplicableOthersNot Applicable0Tons0OthersNot ApplicableOthersNot Applicable
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube91.70091.8100
(2.)PM2.5Microgram per Meter Cube56.20056.360
(3.)SO2Microgram per Meter Cube26.50026.680
(4.)NOxMicrogram per Meter Cube36.10036.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source GETCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 40.98
(b)Waste/Barren Land (ha.) 1030.48
(c)Grazing/ Community Land (ha.) 144.78
(d)Surface Water Bodies (ha.) 32.45
(e)Settlements (ha.) 72.76
(f)Industrial (ha.) 105.75
(g)Forest (ha.) 0
(h)Mangroves (ha.) 1941.94
(i)Marine Area (ha.) 55102.74
(j)Others (ha.) : Saltpan, coastal sand, tidal flat 9117.1
    Total (ha.) 67588.9800
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNot Applicable0NA
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not Applicable
(2.)ESZsNot Applicable0Not Applicable
(3.)NPANot Applicable0Not Applicable
(4.)CorridorsNot Applicable0Not Applicable
(5.)Wildlife CorridorsNot Applicable0Not Applicable
(6.)WLSNot Applicable0Not Applicable
(7.)ESAsMangrove Patches2Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Not Applicable
(2.)Archaeological SitesNot Applicable0Not Applicable
(3.)Defence InstallationsNot Applicable0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Arabian Sea
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nakti Creek
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt15.11015.11
(2.)Percentage of Total Project Area18.9018.9
(3.)No. of Plants22665022665
(4.)Funds Allocated200000002000000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IV
(b)Location Type Low and Medium Eroding Coast
(c)Details of Mangroves Land Involved, if Any Nil
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Terrestrial EIA study has been carried covering va
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 22 Jan 2020
(iv)Period of Study To (EIA Terrestrial) 29 Jan 2020
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies Marine ecology and biodiversity assessment has bee
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 22 Jan 2020
(iv)Period of Study to (EIA Marine) 29 Jan 2020
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Applicable, Existing AKBTPL port has Tier-I Oil sp
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing (IRS), Anna University
(ii)Please Specify with salient features Ports & Harbour
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IV
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 3673
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 1596
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed CRZ Mapping was carried out through IRS Chennai. T
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) The proposed project does not have any direct impa
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Not Applicable
(d)Quantity of Cargo 0
(e)Control Measures of Cargo Not Applicable
(f)Dust Control Measures Not Applicable
(g)Quantum 0
(h)Quantity of Dredging (Cubic meter per day) 34133
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Level raising and Off Shore disposal at Identified
(k)Details of Outfall Diffusers NA
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall Not Applicable
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking NA
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Not Applicable
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Gujarat
(d)Case No. writ petition(PIL) 96 of 2018
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Ongoing
(f)Case Details Javed Hasan Manjothi& others Vs. State of Gujarat
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act • The quantity of fresh water consumption for domestic purpose shall not exceed 30 KL/ Day • The quantity of fresh water consumption for industrial purpose shall not exceed 3125 KL/ Day • There shall be no generation of industrial waste water from the manufacturing process and other ancillary operations. • The quantity of domestic waste water shall not exceed 22 KL/ Day • Industry shall operate sewage treatment plant adequately so that treated sewage shall comply with the norms. • The treated se
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA-076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Parry House 3rd Floor,No.2 N.S.C. Bose Road, Chennai – 600 001,Tamilnadu
(iv)Mobile No. 9677003778
(v)Landline No. 0443044562
(vi)Email Id inquiry@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 24 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease address following deficiencies found in your application No. IA/GJ/MIS/152274/2008, dated 29 April, 2020: As per ToR letter dated 04.05.2016, condition no. (iv); recommendation of SCZMA, Gujarat is not available, which is a pre-requisite as per the CRZ Notification, 2011 (ref. clause 4 (i)(b) and 4.2 (iii)). 04 Jun 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantP N Roy Chowdhury
DesignationHead - Environment department
Name of Company (Applicant Name should not be given here)ADANI KANDLA BULK TERMINAL PRIVAT LIMITED
AddressAdani House, Nr. Mithakhali circle, Navrangpura, Ahmedabad
Print