1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development Drilling of 406 wells in Mehsana Asset, Mehsana, Gujarat | (b)Name of the Company / Organisation | OIL AND NATURAL GAS CORPORATION LIMITED | (c)Registered Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,South West,Delhi-110070 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajeeva Kumar | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj,,Vasant Vihar,Ramanathapuram,Tamil Nadu-110070 | (d)Pin code | 110070 | (e)E-mail | head_env@ongc.co.in | (f)STD Code. | 11(f)Telephone No. | 26753163 | (g)Fax No. | 01126129067 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/151758/2011 | (d)Master Proposal Number(Single Window) | SW/151752/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Mehsana, Ahmedabad and Gandhinagar | (b)Pincode | 384003 | (c)Bounded Latitudes (North) | | From | | Degree | 23.01392 | Minutes | | Second | | From | | Degree | 24 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.03014 | Minutes | | Second | | From | | Degree | 72.86386 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 46A-3, 46A-6, 46A-11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 81 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/503/2011-IA II (I) | (c)Date of Issue of TOR | 24 Jan 2012 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 17 Aug 2020 | (c)Date of Issue of EC | 25 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Mar 2020 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Bamroli Village Panchayat Compound | State : | Gujarat | District : | Ahmedabad | Tehsil : | Detroj-Rampura | Village : | Bamroli |
| 103 | Land compensation , Funding on CSR activities, Site restoration after seismic survey | Others | ADM | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Jan 2020 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Limdi Chowk, Langhnaj | State : | Gujarat | District : | Mahesana | Tehsil : | Mahesana | Village : | Langhnaj |
| 50 | Land compensation, CSR activities, Site restoration after seismic survey | Others | ADM | (3.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 03 Mar 2020 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Shree Solaiya Darmada Trust-Open Plot | State : | Gujarat | District : | Gandhinagar | Tehsil : | Mansa | Village : | Solaiya |
| 83 | Land compensation, Site restoration after seismic survey | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-130/2018(ENV)/251 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 24 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Crude Oil and Natural Gas | 0 | 13.146 | 13.146 | Others | MMT | Others | Pipelines | (2.) | Number of wells | 0 | 391 | 391 | Others | Number | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | 391 wells | 350 wells | NA | NA | NA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 27 Sep 2016 | (iv)Valid Upto | 24 Jul 2021 | (v)File No. | GPCB/CCA-MH-390/ID: 33019/ | (vi)Application No. | AWH-81656 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2402.83 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 288.13 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 51.68 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 3 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | diesel | 3 | Kilo Litre per Day | | Open Market | Others | NA | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 27 Apr 2018 To 27 Jul 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 30 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 14.1 | 5.1 | 13.8 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 45.1 | 18.6 | 42.9 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 80.4 | 40.9 | 73.5 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 31.6 | 9.0 | 30.9 | 80 | |
14.2. No. of Ground Water monitoring locations : 20 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 640 | 140 | 300 | 600 | (2.) | Fluoride | | | mg/l | | 1.27 | 0.1 | 1 | 1.5 | (3.) | TDS | | | mg/l | | 1827 | 217 | 500 | 2000 | (4.) | TSS | | | mg/l | | 1 | 1 | 1 | 1 | (5.) | Heavy Metals | | Fe | mg/l | | 0.24 | 0 | 0.3 | 1 | (6.) | pH | | | NA | | 8.01 | 7.47 | 6.5 | 8.5 | (7.) | Chlorides | | | mg/l | | 955 | 35 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 40 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.8 | 4.5 | C | (2.) | pH | | NA | | 7.52 | 6.35 | A | (3.) | BOD | | mg/l | | 10.4 | 2 | D | (4.) | COD | | mg/l | | 60 | 12 | D | |
14.4. No. of Ambient Noise monitoring locations : 360 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55.7 | 47.9 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45.7 | 38.3 | 45 | |
14.5. No. of Soil Sample Monitored locations : 20 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 62.5 | 16.6 | (2.) | pH | | | 7.48 | 6.49 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.81 | 0.08 | (4.) | N(Nitrogen) | Kilogram per hectare | | 346 | 198 | (5.) | K(Potassium) | Kilogram per hectare | | 3649 | 1040 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.1 To 59.4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.0 To 59.17 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Other | 25 | 5 | Not Appliacble | modeOthers | TANKERS | Others | Sourced from nearest ONGC Installation | NA | 15 Mar 2017 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Wash Water | 5 | 5 | Evaporation in HDPE Lined Pit | Others | Evaporation in HDPE Lined Pit | 5 | 0 | (2.) | Domestic Waste Water | 5 | 5 | Soak Pit | Others | Soak Pit | 5 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drill Cuttings | Others | Drill Cuttings | 128 | Kilolitre | 0 | Others | NA | Others | HDPE lined pit | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 45.1 | 0 | 0 | 45.11 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 14.1 | 0.2 | 5.55 | 19.66 | 80 | (3.) | NOx | | Microgram per Meter Cube | 31.6 | 0.2 | 31.94 | 63.55 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 80.4 | 0.2 | 3.33 | 83.74 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | HSD | 6.8 | 0.3 | NOx | | 0.23 g/s | (2.) | DG Set | HSD | 6.8 | 0.3 | SO2 | | 0.04 g/s | (3.) | DG Set | HSD | 6.8 | 0.3 | PM10 | | 0.016 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | DG Set | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 DG Set standby | (e)Stack Height (in m) | 6.8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 491.26 | Total Land (ha.) | 491.26 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1532652 | (b)Waste/Barren Land (ha.) | 133182 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 107206 | (e)Settlements (ha.) | 59188 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 6072 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 1838300.0000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Each Drill Site | 1.21 | Each Drill Site | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | Wildlife Corridors | NA | 0 | NA | (3.) | Critically Polluted Area | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Forest | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 491.26 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 120 | (f)Total Manpower | 30 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 0 | 0 | 0 | (2.) | Total Area of Green Belt | 0 | 0 | 0 | (3.) | Percentage of Total Project Area | 0 | 0 | 0 | (4.) | Funds Allocated | 0 | 0 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Reduction in oil imports | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | No | (i)Reason for not Hiring the Consultant | NABL accredited Lab, M/s ABC Techno Labs India Pvt. ltd. Chennai has been hired for baseline data | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS REPLY | 06 Jan 2021 | 2. | ADS Raise Letter | This has reference to your online proposal No. IA/GJ/IND2/151758/2011 dated 17th August, 2020 for environmental clearance to the above mentioned project.
2. The Ministry of Environment, Forest and Climate Change has examined the proposal for environmental clearance to development drilling of 391 wells by M/s ONGC located at Mehsana, Gandhinagar and Ahmedabad in Gujarat.
3. The above referred proposal was considered by the Expert Appraisal Committee (EAC) for Industry II Petrochemical Sector in its meeting held on 18.09.2020. The recommendations of the EAC on the project may be seen in the Minutes of the meeting which are available on the web-site of this Ministry.
4. The EAC noted that the environmental clearance granted to the existing project is for drilling of 350 wells, whereas the proposed project envisaged development of 406 wells. It was also informed that 15 wells of Patan district which were proposed to be drilled have been dropped and hence public hearing of Patan district was also not carried out. Hence, the proposed project involves drilling of only 391 wells. EAC, desired that a clarification from the PP shall be obtained regarding deviation in existing EC granted wells (350) and proposed development (391) wells, and to get details on remaining 41 wells.
5. The Committee during the meeting also noted that the public hearing was conducted on 17th January, 2020 in Mehsana district and chaired by the Sub District Magistrate. As per the regulatory provision of EIA notification 2006 and as amendment thereof, the District Magistrate / District Collector / Deputy Commissioner or his or her representative not below the rank of an Additional District Magistrate assisted by a representative of SPCB or UTPCC, shall supervise and preside over the entire public hearing process.
6. In view of the para 4 & 5 above, you are directed to submit detailed clarification to the Ministry at the earliest, to enable us to process file for further necessary action.
7. This issues with approval of the competent authority. | 27 Oct 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rajeeva Kumar | Designation | General Manager | Name of Company (Applicant Name should not be given here) | OIL AND NATURAL GAS CORPORATION LIMITED | Address | Deendayal Urja Bhavan, 5, Nelson Mandela Marg, Vasant Kunj |
|