Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Kamanda Steel Plant
(b)Name of the Company / Organisation RUNGTA MINES LTD
(c)Registered Address Rungta Office, Main Road, At/PO: Barbil, Odisha nli,,Dist Sepahijala,Sikkim-758035
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HIRAK MAZUMDER
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Rungta Mines Limited Barbil, keonjhar,Odisha,,Barbil,Keonjhar,Orissa-758035
(d)Pin code 758035
(e)E-mail rml.forest@gmail.com
(f)STD Code. 33(f)Telephone No. 22816580
(g)Fax No. 03322815380
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(b) Mineral beneficiation
3(a) Metallurgical industries (ferrous & non ferrous)
4(b) Coke oven plants
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/OR/IND/151729/2020
(d)Master Proposal Number(Single Window) SW/151727/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Several plots/ khata nos as given in Annexure-I to
(b)Pincode 770048
(c)Bounded Latitudes (North)
From
Degree 21.91500000
Minutes
Second
From
Degree 21.93277778
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.21750000
Minutes
Second
From
Degree 85.23138889
Minutes
Second
(e)Survey of India Topo Sheet No. 73G/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 556
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-988/07/EPE/858 dated 10.05.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 19 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1.2 DRI (1X300 TPD)13650025025161525Tons per Annum(TPA)OthersConsumed In house
(2.)1.3 DRI (1X350 TPD)14700019850166850Tons per Annum(TPA)OthersConsumed In house
(3.)1.4 DRI (2X350 TPD)2940000294000Tons per Annum(TPA)OthersConsumed In house
(4.)2. SMS90090069300970200Tons per Annum(TPA)OthersConsumed In house
(5.)5.1 Pellet Plant-1600000300000900000Tons per Annum(TPA)OthersConsumed In house
(6.)5.2 Pellet Plant-226400003600003000000Tons per Annum(TPA)OthersConsumed In house
(7.)3.3 Billet Caster (III)3395700339570Tons per Annum(TPA)OthersConsumed In house
(8.)1. DRI Plant1270500807251351225Tons per Annum(TPA)OthersConsumed In house
(9.)1.1 DRI (6X100 TPD)27300035850308850Tons per Annum(TPA)OthersConsumed In house
(10.)3.2 Billet Caster (II)2716560271656Tons per Annum(TPA)OthersConsumed In house
(11.)1.5 DRI (2X500 TPD)4200000420000Tons per Annum(TPA)OthersConsumed In house
(12.)2.2 SMS (II) IF 9X15T, LRF 3X35T6237000623700Tons per Annum(TPA)OthersConsumed In house
(13.)3.1 Billet Caster (I)27165667914339570Tons per Annum(TPA)OthersConsumed In house
(14.)4.RM-TMT/Flat/Round/Wire rod/Structure mill/other84756765198912765Tons per Annum(TPA)Road,Rail
(15.)4.1 Rolling Mill (I)26079065198325988Tons per Annum(TPA)Road,Rail
(16.)4.2 Rolling Mill (II)2607900260790Tons per Annum(TPA)Road,Rail
(17.)4.3 Rolling Mill (III)3259870325987Tons per Annum(TPA)Road,Rail
(18.)5. Pellet Plnat32400006600003900000Tons per Annum(TPA)OthersConsumed In house
(19.)6. Oxygen Plant0150150OthersTons per DayOthersConsumed In house
(20.)3. Billets/Slab/ Bloom caster - CCM all 4 strand88288267914950796Tons per Annum(TPA)OthersConsumed In house
(21.)Continuous Caster machine(all 4 strand404Others3x 4 strandOthersconsumed in house
(22.)2.1 SMS (I) IF 4X15T, LRF 3X20T27720069300346500Tons per Annum(TPA)OthersConsumed In house
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Refer Covering letterRefer Covering letterRefer Covering letterRefer Covering letterRefer Covering letter
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 28 Mar 2019
(iv)Valid Upto 31 Mar 2023
(v)File No. 3189/IND-I-CON-4628
(vi)Application No. 2536254 dated 16.03.2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 120
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 792047
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 792047
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bentonite39000Tons per AnnumOpen marketRoad,Rail350 Open MarketCopy of Linkage
(2.)Furnace oil72385OthersKLAOpen marketRoad,Rail100 Open MarketCopy of Linkage
(3.)Manganese Ore31104Tons per AnnumOpen MarketRoad,Rail340 Open MarketCopy of Linkage
(4.)Low-Grade High Silicon Moil Ore37368Tons per AnnumOpen marketRoad,Rail350 Open MarketCopy of Linkage
(5.)Quartz73112Tons per AnnumOpen MarketRoad,Rail100 Open MarketCopy of Linkage
(6.)Electrode Paste1344Tons per AnnumOpen MarketRoad,Rail200 Open MarketCopy of Linkage
(7.)Chrome Ore Lumps8646Tons per AnnumOpen MarketRoad,Rail300 Open MarketCopy of Linkage
(8.)Limestone79834Tons per AnnumOpen marketRoad,Rail100 Open MarketCopy of Linkage
(9.)Briquettes111360Tons per AnnumOpen marketRoad,Rail100 Open MarketCopy of Linkage
(10.)Dolomite278523Tons per AnnumOpen MarketRoad,Rail350 Open MarketCopy of Linkage
(11.)Steel Scrap104323Tons per AnnumOpen marketRoad,Rail300 Open MarketCopy of Linkage
(12.)Iron Ore/ Fines/ concentrate6064776Tons per AnnumOwn mines/ OMC/ Other private minesRoad,Rail230 OthersEC LetterCopy of Linkage
(13.)Coking coal211400Tons per AnnumOpen MarketRoad,Rail230 Open MarketCopy of Linkage
(14.)coke Breeze73595Tons per AnnumOpen MarketRoad,Rail200 Open MarketCopy of Linkage
(15.)Coal Fines68895Tons per AnnumOpen MarketRoad,Rail100 Open MarketCopy of Linkage
(16.)Coke303420Tons per AnnumOpen MarketRoad,Rail230 Open MarketCopy of Linkage
(17.)Coal1302442Tons per AnnumImported/ open marketRoad,Rail100 Open MarketCopy of Linkage
(18.)Fe-Mn Slag31104Tons per AnnumOpen MarketRoad,Rail250 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.44 To 2.35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.08 To 7.89
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface351050.2Copy of Permission LetterPipelineIntake WellAgreement no. 4722 Nov 20199371
(2.)Surface351050.2Copy of Permission LetterPipelineIntake WellApplication CGM/SLNA/RML-191/1917 Feb 202035105
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Iron ore Beneficiation Plant864864Tailing pondOthersReused in Beneficiation plant8640
(2.)Power plant288288Common monitoring basinOthersDust suppression, horticulture and ash quenching2880
(3.)Drinking Water and Sanitary240240STPOthersHorticulture2400
(4.)Coal Washery4324325 stage treatment plantOthersReuse in Coal wahsery4320
(5.)Mini Blast Furnace504504Common monitoring basinOthersDust suppression, horticulture and ash quenching5040
(6.)Sinter Plant28.328.3Common monitoring basinOthersDust suppression, horticulture and ash quenching28.30
(7.)TMT/Flat/ Round/ Wire/ Rod/ Strl Mill360360Common monitoring basinOthersDust suppression, horticulture and ash quenching3600
(8.)Pellet Plant648648Common monitoring basinOthersDust suppression, horticulture and ash quenching6480
(9.)SMS45.645.6Common monitoring basinOthersDust suppression, horticulture and ash quenching45.60
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3409.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3409.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SMS-SlagIndustrial Waste34011Tons0.2OthersInternalOthersconverted to aggregates and used in road making
(2.)RM-RejectIndustrial Waste15669Tons0.2OthersInternalOthersReused in SMS
(3.)Beneficiation TailingIndustrial Waste500000Tons0.2OthersInternalOthersDewatered & reused in infrastructure projects
(4.)Pellet Plant DustIndustrial Waste91446Tons0.2OthersInternalOthers100% reutilised in mixing building of pellet plant
(5.)DRI-ESP DustIndustrial Waste67158Tons0.2OthersInternalOthers100% reutilised in pellet plant or sinter plant
(6.)DRI-Kiln AccretionIndustrial Waste6756Tons0.2OthersInternalOthersReused for road sub-base
(7.)BF-DustIndustrial Waste37730Tons0.2OthersInternalOthers100% reused in sinter plant
(8.)Coke Oven-BF DustIndustrial Waste6342Tons0.2OthersInternalOthers100% reused in sinter plant
(9.)Ferro alloy-SlagIndustrial Waste64821Tons0.2OthersInternalOthersSinter making,grinding& road& landfilling,sellable
(10.)Ferro alloy finesIndustrial Waste10821Tons0.2OthersInternalOthers100% reused in sinter plant
(11.)RM-Mill ScaleIndustrial Waste41776Tons0.2OthersInternalOthersSaleable, useable in pellet making & sinter plant
(12.)DRI-CharIndustrial Waste237240Tons0.2OthersInternalOthers100% Utilised in CPP
(13.)CPP-AshIndustrial Waste301058Tons0.2OthersInternalOthersReused in cement,brick,block,aggregate&road making
(14.)BF-SlagIndustrial Waste186009Tons0.2OthersInternalOthers100% Granulated & sold for cement making
(15.)Sinter Return finesIndustrial Waste29400Tons0.2OthersInternalOthers100% reused in sinter plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.32.58.0286.33100
(2.)SO2Microgram per Meter Cube6.81.512.2119.0280
(3.)NOxMicrogram per Meter Cube20.42.57.8628.2680
(4.)PM2.5Microgram per Meter Cube41.42.54.6146.0260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Refer table 3 of addendum EIA in attachment XIIRefer table 3 of addendum EIA in attachment XII00OthersRefer table 3 of addendum EIA in attachment XIIRefer table 3 of addendum EIA in attachment XII
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 228500
(b)Source Captive
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x 1250 KVA, 3x 1010 KVA, 3x750 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 120.369
(c)Government Land (ha.) 34.12
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 154.489
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 145.259
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Others 9.23
    Total (ha.) 154.48899999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant60.86
(2.)Green belt50.98
(3.)Built Up Area0.80
(4.)Water Reservoir3.8
(5.)Area for Solid Waste Management20.96
(6.)OthersStock yard & Roads17.08
Total (ha.) 154.48
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsKarampada-Anandapur Elephant Corridor12Nil within 10 km radius
(2.)WLSSimlipal WLS130Nil within 10 km radius
(3.)Critically Polluted AreaTalcher106Nil within 10 km radius
(4.)CorridorsKarampada-Anandapur Elephant Corridor12Nil within 10 km radius
(5.)NPASimlipal national park97Nil within 10 km radius
(6.)ESAsPachmarhi701Nil within 10 km radius
(7.)ESZsDebrigarh Wildlife Sanctuary155Nil within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesThe Archaeological Remains of Benisagar68Nil within 10 km radius
(2.)Defence InstallationsKolkata cantonment334Nil within 10 km radius
(3.)ForestKathamal0.5East
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 145.26
(b)Land yet to be acquired(Ha) 9.23
(c)Status of Land acquisition if not acquired Pending with Tehsildar office
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Sloth beer, Python
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 233.225 lakhs
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 9206/1WL-ssp-257/2016
(iii)Date of issue 30 Oct 2016
(iv)Recommendation PCCF (WL) Government of Odisha
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Karo River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 90
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 355
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt50.98050.98
(2.)Percentage of Total Project Area33033
(3.)No. of Plants1274500127450
(4.)Funds Allocated637250006372500
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen belt development, Cleanliness drive
(2.)SocialUpliftment of local community through CSR, Employment
(3.)Financialsteady income to local community/ Employee
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. HC of Delhi orders in LPA110/2014 & CM No 2175/201
(ii)Name of the EIA Consultant Min Mec Consultancy Pvt. Ltd., New Delhi
(iii)Address A-121, Paryavaran Complex, IGNOU Road, New Delhi-110030
(iv)Mobile No. 9811077603
(v)Landline No. 0112953223
(vi)Email Id minmec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 19 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following: Form 2: S.No. 15: Actual surface water requirement is 62304 KLD whereas permission is only available for 9371 KLD. Source for the remaining water requirement and the permission for the water drawl shall be furnished. Addendum to the EIA report: Material and Energy balance including gas volume calculations, pollution load in a process flow diagram with balance sheet for the entire process units shall be furnished. Air quality prediction modeling shall be revised by incorporating terrain features of the study area with geo referencing of all the process stacks. 21 Apr 2020
2.NAThe correction have been made as per the instruction received 06 May 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHIRAK MAZUMDER
DesignationDirector
Name of Company (Applicant Name should not be given here)RUNGTA MINES LTD
AddressRungta Office, Main Road, At/PO: Barbil, Odisha