Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed expansion of secured landfill (Phase IV) of Integrated Common Hazardous Waste Treatment, Storage and Disposal Facility (TSDF) at plot number 9701-9716, GIDC Ankleshwar, proposed by M/s Bharuc
(b)Name of the Company / Organisation BHARUCH ENVIRO INFRASTRUCTURE LIMITED (BEIL),
(c)Registered Address PLOT NO- D-43 Dahej Industrial Estate Tal Vagra,Dist Bharuch Gujrat,Bharuch,Gujarat-392130
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BD DALWADI
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Plot no D-43 Dahej Industrail Estate Tal Vagra,District Bharuch Gujrat,Vagra,Bharuch,Gujarat-392130
(d)Pin code 392130
(e)E-mail patelml1@beil.co.in
(f)STD Code. 264(f)Telephone No. 253135
(g)Fax No. 222849
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIS/22321/2014
(d)Master Proposal Number(Single Window) SW/151485/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.9701-9716, GIDC industrial estate, Anklesh
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.614714
Minutes
Second
From
Degree 21.616777
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.046517
Minutes
Second
From
Degree 73.051869
Minutes
Second
(e)Survey of India Topo Sheet No. 46C14 and 46G2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 28
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-10/2014-IA-III
(c)Date of Issue of TOR 18 Sep 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Feb 2015
(c)Date of Issue of EC 31 Dec 2015
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is in Notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. File no.5-28/2008(ENV)/185 dated 2.03.2020
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 21 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hazardous waste115800013400002498000OthersMetric TonsRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)TSDF27.92 Ha0 Ha27.92area
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Oct 2018
(iv)Valid Upto 31 Jul 2022
(v)File No. GPCB/HAZ-ANK-CCA-167(18)/ID-149
(vi)Application No. 138953
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 50.58
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.50
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 13.40
(b)Existing quantity of raw material/fuel 11.58
(c)Total quantity of raw material/fuel 24.98
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)hazardous waste1340000Othersmetric tonIndustriesRoad5 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 16 Oct 2019 To 15 Jan 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube59.8726.8058.4160
(2.)SO2Micro Gram per Meter Cube59.705.9249.5880
(3.)PM10Micro Gram per Meter Cube90.8043.5090.35100
(4.)NOxMicro Gram per Meter Cube70.0011.4668.3480
(5.)OthersCOMicro Gram per Meter Cube0002
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.847.056.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l28878115002000
(4.)Chloridesmg/l754.32202501000
(5.)Fluoridemg/l0.3601.01.5
(6.)Total Hardnessmg/l763.4233200600
(7.)Heavy MetalsAsmg/l000.010.05
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.628.22C
(2.)BODmg/l12.99.0C
(3.)OthersNO3mg/l9.442.81C
(4.)CODmg/l4031.1C
(5.)DOmg/l7.36.9C
    14.4.     No. of Ambient Noise monitoring locations : 21
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))82.449.855
(2.)Leq(Night)A-weighted decibels(dB(A))75.649.045
    14.5.     No. of Soil Sample Monitored locations : 11
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.236.2
(2.)N(Nitrogen)Kilogram per hectare290216.8
(3.)P(Phosphorus)Kilogram per hectare52.48.3
(4.)K(Potassium)Kilogram per hectare428.1327.7
(5.)Electric ConductivityMillisiemens per Centimetre1.941.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.3 To 76
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 34
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC industrial area6570.5Copy of Permission LetterPipelineOthersGIDC815621 Nov 2019657
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial2151800CETPOthersgreen belt2150
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 215
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 215
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)leachateIndustrial Waste620000Kilolitre0.5OtherspipelineOthersMEE
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube59.8700.0159.8860
(2.)NOxMicrogram per Meter Cube70.004.450.0170.0280
(3.)PM10Microgram per Meter Cube90.8000.0190.82100
(4.)SO2Microgram per Meter Cube59.703.450.0159.7280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2550
(b)Source Gujarat Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 27.92
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 27.92
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 27.92
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : plant area 0
    Total (ha.) 27.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersland area27.92
Total (ha.) 27.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone00
(2.)WLSnone00
(3.)NPAnone00
(4.)Wildlife Corridorsnone00
(5.)Corridorsnone00
(6.)ESAsnone00
(7.)ESZsnone00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNANA0None in 10 km Radius
(2.)ForestNA0None in 10 km Radius
(3.)Archaeological SitesNA0None in 10 km Radius
(4.)Defence InstallationsNA0None in 10 km Radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 27.92
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 115
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt41000041000
(2.)Percentage of Total Project Area14.6014.6
(3.)No. of Plants110001000021000
(4.)Funds Allocated6600006000001260000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalTree Plantation
(2.)FinancialIncreased standard of living due to employment generation
(3.)SocialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 279233.09
(e)Total built up area (sqm) 42349.49
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 54608.78
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No discharge to water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0128
(ii)Name of the EIA Consultant Shivalik Solid waste Management Ltd
(iii)Address Ist floor, SCO 20-21, Near Hotel Dolphin, Zirakpur, Punjab-140604
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of ADS reply of query raised in 51st Meeting of Expert Appraisal committee (Infra 2) held on 21-22 May, 2020 at MoEF&CC 29 Jul 2020
2.NA

Kindly see minutes of 51st meeting of EAC (Infra-2).

31 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBD DALWADI
DesignationCEO
Name of Company (Applicant Name should not be given here)BHARUCH ENVIRO INFRASTRUCTURE LIMITED (BEIL),
AddressPLOT NO- D-43 Dahej Industrial Estate Tal Vagra
Print