Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Chaliyama Steel Plant
(b)Name of the Company / Organisation RUNGTA MINES LTD
(c)Registered Address Rungta Office, Main Road, At/PO: Barbil, Odisha nli,,Dist Sepahijala,Sikkim-758035
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HIRAK MAZUMDER
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Rungta Mines Limited Barbil, keonjhar,Odisha,,Barbil,Keonjhar,Orissa-758035
(d)Pin code 758035
(e)E-mail rml.forest@gmail.com
(f)STD Code. 33(f)Telephone No. 22816580
(g)Fax No. 03322815380
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
4(b) Coke oven plants
Minor Activity1(d) Thermal Power Plants
2(a) Coal washeries
(b)Category A
(c)Proposal Number IA/JH/IND/151458/2020
(d)Master Proposal Number(Single Window) SW/151457/2020
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Several plots/ khata nos as given in Annexure-I to
(b)Pincode 833201
(c)Bounded Latitudes (North)
From
Degree 22.5661111
Minutes
Second
From
Degree 22.59694444
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.88527778
Minutes
Second
From
Degree 85.91361111
Minutes
Second
(e)Survey of India Topo Sheet No. 73 F/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 198
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.2
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandSeraikela KharsawanRajnagarChaliyama, Bankasai, Kuju, Arahasa and Medki
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-542/ROR-2018/4053
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 2 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)DRI (1X100 TPD)45500597551475Tons per Annum(TPA)OthersConsumed Inhouse
(2.)Steel Melting Shop (I)27720069300346500Tons per Annum(TPA)OthersConsumed Inhouse
(3.)Steel Melting Shop (II)27720069300346500Tons per Annum(TPA)OthersConsumed Inhouse
(4.)Steel Melting Shop (III)231000115500346500Tons per Annum(TPA)OthersConsumed Inhouse
(5.)Rolling Mill (II)26079065198325988Tons per Annum(TPA)Road,RailConsumed Inhouse
(6.)Rolling Mill (III)217325108663325988Tons per Annum(TPA)Road,RailConsumed Inhouse
(7.)Pelletisation Plant26400003600003000000Tons per Annum(TPA)OthersConsumed Inhouse
(8.)Oxygen Plant3070100OthersTons per DayOthersConsumed Inhouse
(9.)Sinter Plant532224133056665280Tons per Annum(TPA)OthersConsumed Inhouse
(10.)Billets Caster (I) (CCM 4 strand)27165667914339570Tons per Annum(TPA)OthersConsumed Inhouse
(11.)Billets Caster (III) (CCM 4 Strand)226380113190339570Tons per Annum(TPA)OthersConsumed Inhouse
(12.)DRI (7X100 TPD)31850041825360325Tons per Annum(TPA)OthersConsumed Inhouse
(13.)DRI (2X350 TPD)29400046800340800Tons per Annum(TPA)OthersConsumed Inhouse
(14.)Billets Caster (II) (CCM 4 strand)27165667914339570Tons per Annum(TPA)OthersConsumed Inhouse
(15.)Rolling Mill (I)26079065198325988Tons per Annum(TPA)Road,RailConsumed Inhouse
(16.)Mini Blast Furnace4585000458500Tons per Annum(TPA)OthersConsumed Inhouse
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Refer Covering letterRefer Covering letterRefer Covering letterRefer Covering letterRefer Covering letter
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Mar 2020
(iv)Valid Upto 31 Mar 2025
(v)File No. JSPCB/HO/RNC/CTO-640536/2020/631
(vi)Application No. 640526
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 889570
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 889570
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Furnace oil67625OthersKLAOpen MarketRoad,Rail150 Open MarketCopy of Linkage
(2.)Coking coal422800Tons per AnnumOpen MarketRoad,Rail350 Open MarketCopy of Linkage
(3.)Quartz60365Tons per AnnumOpen MarketRoad,Rail350 Open MarketCopy of Linkage
(4.)Fe-Mn Slag31104Tons per AnnumOpen MarketRoad,Rail120 Open MarketCopy of Linkage
(5.)Mn Ore/ Chrome/Moil ore77118Tons per AnnumOpen MarketRoad,Rail120 Open MarketCopy of Linkage
(6.)Dolomite, Limestone306673Tons per AnnumOpen MarketRoad,Rail350 Open MarketCopy of Linkage
(7.)Coal921280Tons per Annumopen market / importedOthersSA to Haldia / paradeep Port and by rail/ Road400 Open MarketCopy of Linkage
(8.)coke Breeze121329Tons per AnnumOpen MarketOthersSA to Haldia/ paradeep Port and by rail/ Road400 Open MarketCopy of Linkage
(9.)DRI241855Tons per AnnumInhouseOthersInternal0 OthersinhouseCopy of Linkage
(10.)Electrode Paste1344Tons per AnnumOpen MarketRoad,Rail150 Open MarketCopy of Linkage
(11.)Iron Ore/ Fines/ concentrate3883951Tons per AnnumOwn mines/ open marketRoad,Rail150 OthersECCopy of Linkage
(12.)Coal for emergency120000Tons per AnnumOpen MarketRoad,Rail400 Open MarketCopy of Linkage
(13.)Steel Scrap61875Tons per AnnumOpen MarketRoad,Rail200 Open MarketCopy of Linkage
(14.)Briquettes111360Tons per AnnumOpen MarketRoad,Rail150 Open MarketCopy of Linkage
(15.)Bentonite30000Tons per AnnumOpen MarketRoad,Rail350 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface240000.2Copy of Permission LetterPipelineIntake WellApplication RML/CSP/F94/19-20/100907 Jun 20198630.14
(2.)Surface240000.2Copy of Permission LetterPipelineIntake WellAgreement IN-JH10228101011804Q07 Jul 201815369.86
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Coal washery4564565 stage treatment plantOthersReuse in Coal washery after treatment~4560
(2.)Sinter Plant28.3228.32Common Monitoring BasinOthersFlyash brick,Green belt,Dust suppress,Ash quench28.320
(3.)PGP264264Common Monitoring BasinOthersFlyash brick,Green belt,Dust suppress,Ash quench2640
(4.)MBF504504Common Monitoring BasinOthersCommon Monitoring Basin5040
(5.)Drinking & sanitary421.2421.2STPOthersHorticulture421.20
(6.)Pellet plant408408Common Monitoring BasinOthersFlyash brick,Green belt,Dust suppress,Ash quench4080
(7.)SMS45.645.6Common Monitoring BasinOthersFlyash brick,Green belt,Dust suppress,Ash quench45.60
(8.)CPP288288Common Monitoring BasinOthersDust suppression, DRI cooling2880
(9.)Rolling Mill105.6105.6Common Monitoring BasinOthersFlyash brick,Green belt,Dust suppress,Ash quench105.60
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2520.72
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2520.72
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SMS SlagIndustrial Waste20800Tons0.2OthersInternalOthers100% for metal recovery, converted to aggregates
(2.)Mill Scale - RM & CCMIndustrial Waste30260Tons0.2OthersInternalOthers100% Re-used in Sinter & SMS
(3.)BF DustIndustrial Waste22925Tons0.2OthersInternalOthers100% dust will be reused in Sinter Plant.
(4.)Pellet DustIndustrial Waste72900Tons0.2OthersInternalOthers100% Re-used in Sinter
(5.)DRI ESP DustIndustrial Waste33004Tons0.2OthersInternalOthers100% dust will be used in Sinter Plant
(6.)DRI Kiln AccretionIndustrial Waste3575Tons0.2OthersInternalOthers100% in land fill temporarily till reused in road
(7.)Ferro Alloy plant finesIndustrial Waste10821Tons0.2OthersInternalOthers100% Reused in sinter plant
(8.)DRI CharIndustrial Waste120008Tons0.2OthersInternalOthers100% Char will be used for power generation
(9.)RM RejectIndustrial Waste20725Tons0.2OthersInternalOthers100% reused in SMS
(10.)CPP Fly ashIndustrial Waste404229Tons0.2OthersInternalOtherscement,brick,aggregate,road making&in low area
(11.)Coke oven plant - Bag filter dustIndustrial Waste12684Tons0.2OthersInternalOthers100% reused in sinter plant
(12.)Ferro Alloy Plant slagIndustrial Waste64821Tons0.2OthersInternalOthers100%in sinter grinding& road/landfilling,sellable
(13.)BF SlagIndustrial Waste124795Tons0.2OthersInternalOthers100% will be granulated&sold for cement making.
(14.)Coal washer rejectIndustrial Waste94500Tons0.2OthersInternalOthersProposed to mix with backfill in iron ore mines
(15.)PGP AshIndustrial Waste93317Tons0.2OthersInternalOthers100% in cement,brick,block,aggregate& road making
(16.)Sinter return finesIndustrial Waste112070Tons0.2OthersInternalOthers100% Reused In sinter plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube76.412.4278.83100
(2.)PM2.5Microgram per Meter Cube44.211.3945.6060
(3.)SO2Microgram per Meter Cube13.22.53.6916.9080
(4.)NOxMicrogram per Meter Cube15.52.51.0216.5380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Refer table 13 of addendum EIA in attachment XIIRefer table 13 of Addendum EIA in attachment XII00OthersRefer table 13 of Addendum EIA in attachment XIIRefer table 13 of addendum EIA in attachment XII
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 230000
(b)Source Captive(143 MW) and JSEB (41 MW)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4 x 1000 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 165.22
(c)Government Land (ha.) 74.42
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 239.64
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 239.64
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Others 0
    Total (ha.) 239.6400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant100.51
(2.)Green belt79.08
(3.)Built Up Area0.67
(4.)Water Reservoir2.4
(5.)Area for Solid Waste Management25.83
(6.)OthersOthers31.15Stock yard 19.17, roads 11.98
Total (ha.) 239.64
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPASimpli pal49Nil within 10 km radius
(2.)Critically Polluted AreaSaraikela15Nil within 10 km radius
(3.)WLSDalma Wildlife Sanctuary49NE
(4.)ESAsNumaligarh1000Nil within 10 km radius
(5.)ESZsDalma39Nil within 10 km radius
(6.)Wildlife CorridorsDalma49Nil within 10 km radius
(7.)CorridorsNil00Nil within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestGobra buru Pahar (nearest)5.2ESE
(2.)Archaeological SitesVarious in Ranchi District100Nil within 10 km radius
(3.)Defence InstallationsRamgarh Cantonment125Nil within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 193.13
(b)Land yet to be acquired(Ha) 46.51
(c)Status of Land acquisition if not acquired Pending with private land owners
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant occasionally seen in 10 km radius
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 67.35 lakhs
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 196
(iii)Date of issue 25 Jan 2018
(iv)Recommendation PCCF (WL) Government of Jharkhand
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kharkai river
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1930
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 355
(f)Total Manpower 2130
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt79.08079.08
(2.)Percentage of Total Project Area33033
(3.)No. of Plants195410001954100
(4.)Funds Allocated977050009770500
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt development, cleanliness drive etc
(2.)SocialUpliftment of local community through CSR, Employment
(3.)Financialsteady income to local community/ Employee
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. HC of Delhi orders in LPA110/2014 & CM No 2175/201
(ii)Name of the EIA Consultant Min Mec Consultancy Pvt. Ltd., New Delhi
(iii)Address A-121, Paryavaran Complex, IGNOU Road, New Delhi-110030
(iv)Mobile No. 9811077603
(v)Landline No. 0112953223
(vi)Email Id minmec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 31 Aug 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following: Form 2: S.No.9: Certified compliance report is of May 2018 which is already more than one year old. Recent certified report shall be submitted. Some of the pages in the attachment are blank and not properly scanned. S.No. 15: Actual surface water requirement is 48720 KLD whereas permission is only available for 15368 KLD. Source for the remaining water requirement and the permission for the water drawl shall be furnished. Some of the pages in the attachment are blank and not properly scanned. Addendum to the EIA report: Material and Energy balance including gas volume calculations, pollution load in a process flow diagram with balance sheet for the entire process units shall be furnished. Air quality prediction modeling shall be revised by incorporating terrain features of the study area with geo referencing of all the process stacks. 21 Apr 2020
2.NAThe correction have been made as per the instruction received 07 May 2020
3.NAProposal is returned due to the following: Form 2: S.No.9: As certified compliance report is of May 2018 which is almost two years old, it is requested to obtain a latest report from RO. Any communication made by RO,Ranchi in this regard may be submitted. 13 May 2020
4.NAThe correction have been made as per the instruction received 14 May 2020
5.NAYour proposal is returned due to the following shortcoming. Kindly furnish the recent certified compliance report of RO. 16 Jun 2020
6.NAThe correction have been made as per the instruction received 17 Jul 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHIRAK MAZUMDER
DesignationDirector
Name of Company (Applicant Name should not be given here)RUNGTA MINES LTD
AddressRungta Office, Main Road, At/PO: Barbil, Odisha
Print