1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Chaliyama Steel Plant | (b)Name of the Company / Organisation | RUNGTA MINES LTD | (c)Registered Address | Rungta Office, Main Road, At/PO: Barbil, Odisha nli,,Dist Sepahijala,Sikkim-758035 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | HIRAK MAZUMDER | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Rungta Mines Limited
Barbil, keonjhar,Odisha,,Barbil,Keonjhar,Orissa-758035 | (d)Pin code | 758035 | (e)E-mail | rml.forest@gmail.com | (f)STD Code. | 33(f)Telephone No. | 22816580 | (g)Fax No. | 03322815380 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous) 4(b) Coke oven plants
| Minor Activity | 1(d) Thermal Power Plants 2(a) Coal washeries
| (b)Category | A | (c)Proposal Number | IA/JH/IND/151458/2020 | (d)Master Proposal Number(Single Window) | SW/151457/2020 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Several plots/ khata nos as given in Annexure-I to | (b)Pincode | 833201 | (c)Bounded Latitudes (North) | | From | | Degree | 22.5661111 | Minutes | | Second | | From | | Degree | 22.59694444 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85.88527778 | Minutes | | Second | | From | | Degree | 85.91361111 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73 F/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 198 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.2 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Seraikela Kharsawan | Rajnagar | Chaliyama, Bankasai, Kuju, Arahasa and Medki | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Ranchi | (iii)Letter No. | 103-542/ROR-2018/4053 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 2 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | DRI (1X100 TPD) | 45500 | 5975 | 51475 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (2.) | Steel Melting Shop (I) | 277200 | 69300 | 346500 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (3.) | Steel Melting Shop (II) | 277200 | 69300 | 346500 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (4.) | Steel Melting Shop (III) | 231000 | 115500 | 346500 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (5.) | Rolling Mill (II) | 260790 | 65198 | 325988 | Tons per Annum(TPA) | | Road,Rail | Consumed Inhouse | (6.) | Rolling Mill (III) | 217325 | 108663 | 325988 | Tons per Annum(TPA) | | Road,Rail | Consumed Inhouse | (7.) | Pelletisation Plant | 2640000 | 360000 | 3000000 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (8.) | Oxygen Plant | 30 | 70 | 100 | Others | Tons per Day | Others | Consumed Inhouse | (9.) | Sinter Plant | 532224 | 133056 | 665280 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (10.) | Billets Caster (I) (CCM 4 strand) | 271656 | 67914 | 339570 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (11.) | Billets Caster (III) (CCM 4 Strand) | 226380 | 113190 | 339570 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (12.) | DRI (7X100 TPD) | 318500 | 41825 | 360325 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (13.) | DRI (2X350 TPD) | 294000 | 46800 | 340800 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (14.) | Billets Caster (II) (CCM 4 strand) | 271656 | 67914 | 339570 | Tons per Annum(TPA) | | Others | Consumed Inhouse | (15.) | Rolling Mill (I) | 260790 | 65198 | 325988 | Tons per Annum(TPA) | | Road,Rail | Consumed Inhouse | (16.) | Mini Blast Furnace | 458500 | 0 | 458500 | Tons per Annum(TPA) | | Others | Consumed Inhouse | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Refer Covering letter | Refer Covering letter | Refer Covering letter | Refer Covering letter | Refer Covering letter | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 Mar 2020 | (iv)Valid Upto | 31 Mar 2025 | (v)File No. | JSPCB/HO/RNC/CTO-640536/2020/631 | (vi)Application No. | 640526 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 100 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 889570 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 889570 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Furnace oil | 67625 | Others | KLA | Open Market | Road,Rail | | 150 | Open Market | | Copy of Linkage | (2.) | Coking coal | 422800 | Tons per Annum | | Open Market | Road,Rail | | 350 | Open Market | | Copy of Linkage | (3.) | Quartz | 60365 | Tons per Annum | | Open Market | Road,Rail | | 350 | Open Market | | Copy of Linkage | (4.) | Fe-Mn Slag | 31104 | Tons per Annum | | Open Market | Road,Rail | | 120 | Open Market | | Copy of Linkage | (5.) | Mn Ore/ Chrome/Moil ore | 77118 | Tons per Annum | | Open Market | Road,Rail | | 120 | Open Market | | Copy of Linkage | (6.) | Dolomite, Limestone | 306673 | Tons per Annum | | Open Market | Road,Rail | | 350 | Open Market | | Copy of Linkage | (7.) | Coal | 921280 | Tons per Annum | | open market / imported | Others | SA to Haldia / paradeep Port and by rail/ Road | 400 | Open Market | | Copy of Linkage | (8.) | coke Breeze | 121329 | Tons per Annum | | Open Market | Others | SA to Haldia/ paradeep Port and by rail/ Road | 400 | Open Market | | Copy of Linkage | (9.) | DRI | 241855 | Tons per Annum | | Inhouse | Others | Internal | 0 | Others | inhouse | Copy of Linkage | (10.) | Electrode Paste | 1344 | Tons per Annum | | Open Market | Road,Rail | | 150 | Open Market | | Copy of Linkage | (11.) | Iron Ore/ Fines/ concentrate | 3883951 | Tons per Annum | | Own mines/ open market | Road,Rail | | 150 | Others | EC | Copy of Linkage | (12.) | Coal for emergency | 120000 | Tons per Annum | | Open Market | Road,Rail | | 400 | Open Market | | Copy of Linkage | (13.) | Steel Scrap | 61875 | Tons per Annum | | Open Market | Road,Rail | | 200 | Open Market | | Copy of Linkage | (14.) | Briquettes | 111360 | Tons per Annum | | Open Market | Road,Rail | | 150 | Open Market | | Copy of Linkage | (15.) | Bentonite | 30000 | Tons per Annum | | Open Market | Road,Rail | | 350 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 6 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 6 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 24000 | 0.2 | Copy of Permission Letter | Pipeline | | Intake Well | | Application RML/CSP/F94/19-20/1009 | 07 Jun 2019 | 8630.14 | (2.) | Surface | | 24000 | 0.2 | Copy of Permission Letter | Pipeline | | Intake Well | | Agreement IN-JH10228101011804Q | 07 Jul 2018 | 15369.86 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Coal washery | 456 | 456 | 5 stage treatment plant | Others | Reuse in Coal washery after treatment~ | 456 | 0 | (2.) | Sinter Plant | 28.32 | 28.32 | Common Monitoring Basin | Others | Flyash brick,Green belt,Dust suppress,Ash quench | 28.32 | 0 | (3.) | PGP | 264 | 264 | Common Monitoring Basin | Others | Flyash brick,Green belt,Dust suppress,Ash quench | 264 | 0 | (4.) | MBF | 504 | 504 | Common Monitoring Basin | Others | Common Monitoring Basin | 504 | 0 | (5.) | Drinking & sanitary | 421.2 | 421.2 | STP | Others | Horticulture | 421.2 | 0 | (6.) | Pellet plant | 408 | 408 | Common Monitoring Basin | Others | Flyash brick,Green belt,Dust suppress,Ash quench | 408 | 0 | (7.) | SMS | 45.6 | 45.6 | Common Monitoring Basin | Others | Flyash brick,Green belt,Dust suppress,Ash quench | 45.6 | 0 | (8.) | CPP | 288 | 288 | Common Monitoring Basin | Others | Dust suppression, DRI cooling | 288 | 0 | (9.) | Rolling Mill | 105.6 | 105.6 | Common Monitoring Basin | Others | Flyash brick,Green belt,Dust suppress,Ash quench | 105.6 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2520.72 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2520.72 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | SMS Slag | Industrial Waste | | 20800 | Tons | 0.2 | Others | Internal | Others | 100% for metal recovery, converted to aggregates | (2.) | Mill Scale - RM & CCM | Industrial Waste | | 30260 | Tons | 0.2 | Others | Internal | Others | 100% Re-used in Sinter & SMS | (3.) | BF Dust | Industrial Waste | | 22925 | Tons | 0.2 | Others | Internal | Others | 100% dust will be reused in Sinter Plant. | (4.) | Pellet Dust | Industrial Waste | | 72900 | Tons | 0.2 | Others | Internal | Others | 100% Re-used in Sinter | (5.) | DRI ESP Dust | Industrial Waste | | 33004 | Tons | 0.2 | Others | Internal | Others | 100% dust will be used in Sinter Plant | (6.) | DRI Kiln Accretion | Industrial Waste | | 3575 | Tons | 0.2 | Others | Internal | Others | 100% in land fill temporarily till reused in road | (7.) | Ferro Alloy plant fines | Industrial Waste | | 10821 | Tons | 0.2 | Others | Internal | Others | 100% Reused in sinter plant | (8.) | DRI Char | Industrial Waste | | 120008 | Tons | 0.2 | Others | Internal | Others | 100% Char will be used for power generation | (9.) | RM Reject | Industrial Waste | | 20725 | Tons | 0.2 | Others | Internal | Others | 100% reused in SMS | (10.) | CPP Fly ash | Industrial Waste | | 404229 | Tons | 0.2 | Others | Internal | Others | cement,brick,aggregate,road making&in low area | (11.) | Coke oven plant - Bag filter dust | Industrial Waste | | 12684 | Tons | 0.2 | Others | Internal | Others | 100% reused in sinter plant | (12.) | Ferro Alloy Plant slag | Industrial Waste | | 64821 | Tons | 0.2 | Others | Internal | Others | 100%in sinter grinding& road/landfilling,sellable | (13.) | BF Slag | Industrial Waste | | 124795 | Tons | 0.2 | Others | Internal | Others | 100% will be granulated&sold for cement making. | (14.) | Coal washer reject | Industrial Waste | | 94500 | Tons | 0.2 | Others | Internal | Others | Proposed to mix with backfill in iron ore mines | (15.) | PGP Ash | Industrial Waste | | 93317 | Tons | 0.2 | Others | Internal | Others | 100% in cement,brick,block,aggregate& road making | (16.) | Sinter return fines | Industrial Waste | | 112070 | Tons | 0.2 | Others | Internal | Others | 100% Reused In sinter plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 76.4 | 1 | 2.42 | 78.83 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.2 | 1 | 1.39 | 45.60 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 13.2 | 2.5 | 3.69 | 16.90 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.5 | 2.5 | 1.02 | 16.53 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Refer table 13 of addendum EIA in attachment XII | Refer table 13 of Addendum EIA in attachment XII | 0 | 0 | Others | Refer table 13 of Addendum EIA in attachment XII | Refer table 13 of addendum EIA in attachment XII | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 230000 | (b)Source | Captive(143 MW) and JSEB (41 MW) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 4 x 1000 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 165.22 | (c)Government Land (ha.) | 74.42 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 239.64 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 239.64 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Others | 0 | Total (ha.) | 239.6400 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 100.51 | | (2.) | Green belt | | 79.08 | | (3.) | Built Up Area | | 0.67 | | (4.) | Water Reservoir | | 2.4 | | (5.) | Area for Solid Waste Management | | 25.83 | | (6.) | Others | Others | 31.15 | Stock yard 19.17, roads 11.98 | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Simpli pal | 49 | Nil within 10 km radius | (2.) | Critically Polluted Area | Saraikela | 15 | Nil within 10 km radius | (3.) | WLS | Dalma Wildlife Sanctuary | 49 | NE | (4.) | ESAs | Numaligarh | 1000 | Nil within 10 km radius | (5.) | ESZs | Dalma | 39 | Nil within 10 km radius | (6.) | Wildlife Corridors | Dalma | 49 | Nil within 10 km radius | (7.) | Corridors | Nil | 00 | Nil within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Gobra buru Pahar (nearest) | 5.2 | ESE | (2.) | Archaeological Sites | | Various in Ranchi District | 100 | Nil within 10 km radius | (3.) | Defence Installations | | Ramgarh Cantonment | 125 | Nil within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 193.13 | (b)Land yet to be acquired(Ha) | 46.51 | (c)Status of Land acquisition if not acquired | Pending with private land owners | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Elephant occasionally seen in 10 km radius | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 67.35 lakhs | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 196 | (iii)Date of issue | 25 Jan 2018 | (iv)Recommendation | PCCF (WL) Government of Jharkhand | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kharkai river | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1930 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 355 | (f)Total Manpower | 2130 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 79.08 | 0 | 79.08 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 1954100 | 0 | 1954100 | (4.) | Funds Allocated | 9770500 | 0 | 9770500 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenbelt development, cleanliness drive etc | (2.) | Social | Upliftment of local community through CSR, Employment | (3.) | Financial | steady income to local community/ Employee | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | HC of Delhi orders in LPA110/2014 & CM No 2175/201 | (ii)Name of the EIA Consultant | Min Mec Consultancy Pvt. Ltd., New Delhi | (iii)Address | A-121, Paryavaran Complex, IGNOU Road, New Delhi-110030 | (iv)Mobile No. | 9811077603 | (v)Landline No. | 0112953223 | (vi)Email Id | minmec@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 31 Aug 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal is returned due to the following:
Form 2:
S.No.9: Certified compliance report is of May 2018 which is already more than one year old. Recent certified report shall be submitted. Some of the pages in the attachment are blank and not properly scanned.
S.No. 15: Actual surface water requirement is 48720 KLD whereas permission is only available for 15368 KLD. Source for the remaining water requirement and the permission for the water drawl shall be furnished. Some of the pages in the attachment are blank and not properly scanned.
Addendum to the EIA report:
Material and Energy balance including gas volume calculations, pollution load in a process flow diagram with balance sheet for the entire process units shall be furnished.
Air quality prediction modeling shall be revised by incorporating terrain features of the study area with geo referencing of all the process stacks. | 21 Apr 2020 | 2. | NA | The correction have been made as per the instruction received | 07 May 2020 | 3. | NA | Proposal is returned due to the following: Form 2:
S.No.9: As certified compliance report is of May 2018 which is almost two years old, it is requested to obtain a latest report from RO. Any communication made by RO,Ranchi in this regard may be submitted. | 13 May 2020 | 4. | NA | The correction have been made as per the instruction received | 14 May 2020 | 5. | NA | Your proposal is returned due to the following shortcoming.
Kindly furnish the recent certified compliance report of RO. | 16 Jun 2020 | 6. | NA | The correction have been made as per the instruction received | 17 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | HIRAK MAZUMDER | Designation | Director | Name of Company (Applicant Name should not be given here) | RUNGTA MINES LTD | Address | Rungta Office, Main Road, At/PO: Barbil, Odisha |
|