Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EXPANSION OF VIJAYAWADA AIRPORT IN RESPECT OF CONSTRUCTION OF NEW INTEGRATED TERMINAL BUILDING & ALLIED FACILITIES AT KESARAPALLY VILLAGE, GANNAVARAM TEHSIL, KRISHNA DISTRICT, ANDHRA PRADESH
(b)Name of the Company / Organisation AIRPORTS AUTHORITY OF INDIA, VIJAYAWADA
(c)Registered Address 422/2, 423, 424, 425, 426, 428, 463 Kesarapally Village, Gannavaram Tehsil, Krishna District, Andhra Pradesh,,Krishna,Andhra Pradesh-521102
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant GMS Rao
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 422/2, 423, 424, 425,426, 428, 463 Kesarapally Village, Gannavaram Tehsil, Krishna District, Andhra Pradesh,,Gannavaram,Krishna,Andhra Pradesh-521102
(d)Pin code 521102
(e)E-mail vijayawadaairport18@gmail.com
(f)STD Code. 866(f)Telephone No. 2846729
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/MIS/63249/2016
(d)Master Proposal Number(Single Window) SW/151258/2020
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 422/2, 423, 424, 425, 426, 428, 463
(b)Pincode 521102
(c)Bounded Latitudes (North)
From
Degree 16.51824
Minutes
Second
From
Degree 16.54091
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.78206
Minutes
Second
From
Degree 80.83999
Minutes
Second
(e)Survey of India Topo Sheet No. E44U14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 30
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshKrishnaGannavaram
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-59/2016-IA-III
(c)Date of Issue of TOR 26 Oct 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 May 2017
(c)Date of Issue of EC 03 Feb 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site
State :Andhra Pradesh
District :Krishna
Tehsil :Gannavaram
Village :Kesarapally
15The main issues raised were: 1. Presence of a dump yard present in the flying zone of the airport. 2. Construction activity being taken up by the Airport Authorities inspite of stay order granted byOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. 1953/APPCB/RO-VJA/2020-210
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 15 2020 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Expansion (497.62)497.620497.62Hectares(ha)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANANA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Mar 2019
(iv)Valid Upto 31 Jan 2024
(v)File No. APPCB-11022/39/2019-TEC-CFO-APPCB
(vi)Application No. APPCB/VJA/VJA/425/AAI-VJA/CFO/HO/2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.82
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.166
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 994.5
(b)Existing quantity of raw material/fuel 318
(c)Total quantity of raw material/fuel 1312.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel3.97Kilo Litre per DayNARoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Sep 2016 To 30 Nov 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube27.118.827.160
(2.)SO2Micro Gram per Meter Cube1714.816.980
(3.)PM10Micro Gram per Meter Cube57.243.457100
(4.)OthersCOMicro Gram per Meter Cube4583844482000
(5.)NOxMicro Gram per Meter Cube28.324.428.280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l9381982501000
(2.)pHNA7.326.646.58.5
(3.)TDSmg/l26707905002000
(4.)Fluoridemg/l1.10.511.5
(5.)Heavy MetalsIronmg/l0.710.230.30
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l622161300600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.55.2B
(2.)BODmg/l22B
(3.)CODmg/l44E
(4.)pHNA7.287.14A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.343.675
(2.)Leq(Night)A-weighted decibels(dB(A))59.440.570
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre102286.6
(2.)pH9.27.9
(3.)N(Nitrogen)Kilogram per hectare106.246.8
(4.)P(Phosphorus)Kilogram per hectare72.132.6
(5.)K(Potassium)Kilogram per hectare420.7138.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2900Copy of Permission LetterPipelineOthersBore WellNA02 Apr 2020290
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic450550STPOthersReuse4500
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 450
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 450
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste304191Tons0RoadOthersONsite treatement and authorised vendor
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube560057100
(2.)PM2.5Microgram per Meter Cube26.70027.760
(3.)NOxMicrogram per Meter Cube25.10.5061480
(4.)SO2Microgram per Meter Cube16.20.5060.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel300.27PM100
(2.)DG SetDiesel300.49SO20.008
(3.)DG SetDiesel300.49NOx2.4
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1344
(b)Source Andhra Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4500 kva
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 497.62
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 497.62
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 203.67
(b)Waste/Barren Land (ha.) 4.52
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 6.46
(e)Settlements (ha.) 8.12
(f)Industrial (ha.) 1.78
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : existing airport, open scrub, open area 273.07
    Total (ha.) 497.6200
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersExpansion0Expansion within existing land
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA00
(2.)Wildlife CorridorsNA00
(3.)ESAsNA00
(4.)ESZsNA00
(5.)Critically Polluted AreaNA00
(6.)WLSNA00
(7.)NPANA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAdavinekkalam RF13.3NW direction
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 497.62
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Complete
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Eluru Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Budimeru River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 120
(e)No. of working days 365
(f)Total Manpower 170
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt850008500
(2.)Percentage of Total Project Area0.1700.17
(3.)No. of Plants2000200
(4.)Funds Allocated02020
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green belt area.
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status.
(3.)FinancialThe project will contribute to the Government through various taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 24
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 4976200
(e)Total built up area (sqm) 52542
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 2
(d)Capacity 27.711
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Surface parking area will be extended by another 1
5.
Energy Saving Measures:
(a)Source/Mode Solar power
(b)Percentage 30
(c)Quantity 403
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There are no water bodies in the project site whic
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/1186
(ii)Name of the EIA Consultant Greencindia Consulting Private Limited
(iii)Address 608-611, level-5, Shopprix Mall, Vaishali, Sector-5, Ghaziabad
(iv)Mobile No. 9899101527
(v)Landline No. 0120411152
(vi)Email Id information@greencindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is an expansion project. As per ToR letter dated 07.09.2018 condition no. (vi), kindly submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board. Or submit copy of Consent to Establish and Consent to operate issued for the existing hospital vis-à-vis compliance of the conditions. 06 May 2020
2.NAThe correction have been made as per the instruction received 07 Aug 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply to queries raised during 54th EAC Meeting under Agenda No. 54.3.1 22 Dec 2020
2.NA

Kindly see the minutes of the 54th meeting of EAC (Infra-2).

06 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGMS Rao
DesignationDirector
Name of Company (Applicant Name should not be given here)AIRPORTS AUTHORITY OF INDIA, VIJAYAWADA
Address422/2, 423, 424, 425, 426, 428, 463 Kesarapally Village, Gannavaram Tehsil, Krishna District, Andhra Pradesh
Print