Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Coal Washery from 1.2 MTPA Dry Process to 3.6 MTPA By Adding 2.4 MTPA Through Wet Process
(b)Name of the Company / Organisation MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Anil Mundra
(b)Designation (Owner/ Partner/ CEO) Managing Director
(c)Address NIL
(d)Pin code 495004
(e)E-mail maheshwari12568@gmail.com
(f)STD Code. 712(f)Telephone No. 2293225
(g)Fax No. 2293225
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/151149/2007
(d)Master Proposal Number(Single Window) SW/151145/2020
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 699; 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8
(b)Pincode 495001
(c)Bounded Latitudes (North)
From
Degree 22.0375056
Minutes
Second
From
Degree 22.0427334
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.1273916
Minutes
Second
From
Degree 82.1389861
Minutes
Second
(e)Survey of India Topo Sheet No. 64J/4, 64K/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 270
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/950/2007-IA.II(M)
(c)Date of Issue of TOR 17 Dec 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 15 Apr 2020
(c)Date of Issue of EC 15 Nov 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0.5
At Open space behind sirgitti station
State :Chhattisgarh
District :Bilaspur
Tehsil :Bilaspur
Village :Parsada
200Employment Generation, Water ScarcityOthers*
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-1030/RON/2019-NGP/5904
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 21 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Washery120000024000003600000Tons per Annum(TPA)Road,Rail*
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal Washery1.2 MTPA2.4 MTPA3.6 MTPA*
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Jan 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 5672/TS/CECB/2018
(vi)Application No. 5672/TS/CECB/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 19
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.19
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2400000
(b)Existing quantity of raw material/fuel 1200000
(c)Total quantity of raw material/fuel 3600000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal3600000Tons per AnnumSECL minesRoad,Rail80 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Mili Gram per Meter Cube21.67.421.480
(2.)PM2.5Mili Gram per Meter Cube45.822.245.460
(3.)NOxMili Gram per Meter Cube38.412.138.480
(4.)PM10Mili Gram per Meter Cube70.741.270.4100
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l311.753.62501000
(2.)TDSmg/l20373935002000
(3.)Fluoridemg/l0.30.211.5
(4.)TSSmg/l5000
(5.)Total Hardnessmg/l868212300600
(6.)pHNA8.17.96.58.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.77.9A
(2.)DOmg/l6.45.8A
(3.)BODmg/l43.8D
(4.)CODmg/l17.68.6A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))49.1242.3155
(2.)Leq(Night)A-weighted decibels(dB(A))42.6439.3645
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare330.677.8
(2.)Electric ConductivityMillisiemens per Centimetre0.350.07
(3.)pH86.4
(4.)K(Potassium)Kilogram per hectare745.8109.3
(5.)P(Phosphorus)Kilogram per hectare65.418.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOwn RWH pond4430.5 Not Appliacble PipelineOthersPipeline0001 Jan 1999443
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste710Packaged Type STPOthersreused for dust suppression and plantation70
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Reject CoalIndustrial Waste480000Tons80Road,RailOthersSold to CFBC power plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.51.20.2164.72100
(2.)PM2.5Microgram per Meter Cube35.81.20.1235.9360
(3.)SO2Microgram per Meter Cube24.110.0124.1280
(4.)NOxMicrogram per Meter Cube38.410.0138.4280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CrusherNone300.3PM100.00002
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Chhatisgarh Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 21.59
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 21.59
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 21.59
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : * 0
    Total (ha.) 21.59
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt7.13
Total (ha.) 7.13
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNa0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)NPANA0NA
(6.)CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 21.59
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Apara River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 6.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 50
(e)No. of working days 330
(f)Total Manpower 220
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7.420.087.5
(2.)Percentage of Total Project Area32.890.3533.24
(3.)No. of Plants2071820020918
(4.)Funds Allocated10000003750001375000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green belt area.
(2.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status.
(3.)FinancialThe project will contribute to the Government through various taxes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)NAMajor
2.
Mine Capacity in ROM (Run of Mine) NA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 00
(b)Date of Approval 28 Nov 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department *
(e)Approved Mining Lease Area 0
(f)Approved Capacity 0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0
(b)Mineable Reserves (Million Ton) 0
(c)Extractable Reserves(Million Ton) 0
(d)Percent(%) of Extraction 0
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 0
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 0
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof NA
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NA
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)FOREST LAND000
(5.)SURFACE WATER BODIES000
(6.)SETTLEMENTS000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)EXTERNAL OB DUMPS0000
(3.)VIRGIN AREA0000
(4.)EXCAVATION/QUARRY0000
(5.)INTERNAL OB DUMPS0000
(6.)GREEN BELT0000
(7.)ROADS0000
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL00000
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan 0
Total Area Excavated (in hectare) 0
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 86
(ii)Name of the EIA Consultant Grass Roots Research and Creation India (P) Ltd.
(iii)Address F-374-375, Sector-63, Noida, U.P.
(iv)Mobile No. 9810032481
(v)Landline No. 0112757141
(vi)Email Id emtrcjkm@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 20 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir Please find enclosed herewith point wise reply of ADS generated for the above said Project. 12 Sep 2020
2.NA

56.2.4  The EAC after deliberation observed that the various deficiency in filling of Form #2 on PARIVESH Portal and further sought compliance on below mentioned details:

 

(i)            Quantity of wastewater generated and discharge is mentioned same in Form#2 at PARIVESH Portal. No loss of water is included for justifying zero liquid discharge.

(ii)         Form#2 at Sr. No. 32 in green belt plan- only proposed map of green belt development plan is submitted. PP shall submit year wise plantation with fund allocation for the same.

(iii)       Form#2 at Sr. No. 32 (i) and Sr. No. 22 regarding area of green belt is not matching

(iv)        The values of air quality mentioned in Form#2 at Sr. No. 14.1 and Sr. No. 18.1 are different. PP shall justify the same.

(v)          Copy of agreement of power requirement is not enclosed in Form# 2 at Sr. No. 19

(vi)        Action taken report and action plan for compliance of conditions on the basis RO report shall be submitted.

(vii)      Clarification from District Forest Officer regarding no presence of schedule I species in the project area and buffer zone shall be submitted.

(viii)    PP shall enclose Attendance of Public Hearing and Letter of Member Secretary to MoEF regarding information of Public Hearing proceedings.

(ix)        In EIA report: 0.48 MTPA of coal rejects will be generated during coal washing. The rejects will be stored in an earmarked place for sale to power plants and cement plants having CFBC and AFBC boilers for steam generation. No rejects shall be sold to brick and briquette manufacturers. Updated MoU or plan for utilization of rejects should be provided.

(x)          PP shall provide water balance with its quantity of usage at each points.

(xi)        Traffic Impact Assessment form coal mine to washery and impact on habitation along the road and 100 m from the corners of the road.

(xii)      Proposed Green belt development program along-with time line and budgetary allocation needs to be provided.

(xiii)    Air quality modelling for PM10 maximum value of 70.7 ug/m3 shall be conducted instead of 64.5 ug/m3 for impact modelling.

(xiv)     Impact modelling considering crusher stack and fugitive dust shall be conducted and also modelling for SO2, NOx has to be done.

(xv)       Details of past production figure vis-à-vis previous EC shall be submitted

 

In view of above the proposal was deferred for compliance of above points.

31 Jul 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnil Mundra
DesignationManaging Director
Name of Company (Applicant Name should not be given here)MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED
AddressMaheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3; 743/1,2,4;745 Sirgitti Industrial area, Sirgitti Railway Crossing. Village : Parsada Tahsil: Bilaspur Dist
Print