1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Coal Washery from 1.2 MTPA Dry Process to 3.6 MTPA By Adding 2.4 MTPA Through Wet Process | (b)Name of the Company / Organisation | MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Anil Mundra | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | NIL | (d)Pin code | 495004 | (e)E-mail | maheshwari12568@gmail.com | (f)STD Code. | 712(f)Telephone No. | 2293225 | (g)Fax No. | 2293225 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/CMIN/151149/2007 | (d)Master Proposal Number(Single Window) | SW/151145/2020 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 699; 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8 | (b)Pincode | 495001 | (c)Bounded Latitudes (North) | | From | | Degree | 22.0375056 | Minutes | | Second | | From | | Degree | 22.0427334 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.1273916 | Minutes | | Second | | From | | Degree | 82.1389861 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64J/4, 64K/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 270 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/950/2007-IA.II(M) | (c)Date of Issue of TOR | 17 Dec 2007 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 15 Apr 2020 | (c)Date of Issue of EC | 15 Nov 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 10 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| At Open space behind sirgitti station | State : | Chhattisgarh | District : | Bilaspur | Tehsil : | Bilaspur | Village : | Parsada |
| 200 | Employment
Generation,
Water
Scarcity | Others | * | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-1030/RON/2019-NGP/5904 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 21 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal Washery | 1200000 | 2400000 | 3600000 | Tons per Annum(TPA) | | Road,Rail | * | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal Washery | 1.2 MTPA | 2.4 MTPA | 3.6 MTPA | * | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Jan 2018 | (iv)Valid Upto | 31 Dec 2019 | (v)File No. | 5672/TS/CECB/2018 | (vi)Application No. | 5672/TS/CECB/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 19 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.19 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.15 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2400000 | (b)Existing quantity of raw material/fuel | 1200000 | (c)Total quantity of raw material/fuel | 3600000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw coal | 3600000 | Tons per Annum | | SECL mines | Road,Rail | | 80 | LOA | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Mar 2017 To 31 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Mili Gram per Meter Cube | 21.6 | 7.4 | 21.4 | 80 | (2.) | PM2.5 | | Mili Gram per Meter Cube | 45.8 | 22.2 | 45.4 | 60 | (3.) | NOx | | Mili Gram per Meter Cube | 38.4 | 12.1 | 38.4 | 80 | (4.) | PM10 | | Mili Gram per Meter Cube | 70.7 | 41.2 | 70.4 | 100 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 311.7 | 53.6 | 250 | 1000 | (2.) | TDS | | | mg/l | | 2037 | 393 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 0.3 | 0.2 | 1 | 1.5 | (4.) | TSS | | | mg/l | | 5 | 0 | 0 | 0 | (5.) | Total Hardness | | | mg/l | | 868 | 212 | 300 | 600 | (6.) | pH | | | NA | | 8.1 | 7.9 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.7 | 7.9 | A | (2.) | DO | | mg/l | | 6.4 | 5.8 | A | (3.) | BOD | | mg/l | | 4 | 3.8 | D | (4.) | COD | | mg/l | | 17.6 | 8.6 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 49.12 | 42.31 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.64 | 39.36 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 330.6 | 77.8 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.35 | 0.07 | (3.) | pH | | | 8 | 6.4 | (4.) | K(Potassium) | Kilogram per hectare | | 745.8 | 109.3 | (5.) | P(Phosphorus) | Kilogram per hectare | | 65.4 | 18.5 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25 To 40 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Own RWH pond | 443 | 0.5 | Not Appliacble | Pipeline | | Others | Pipeline | 00 | 01 Jan 1999 | 443 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Waste | 7 | 10 | Packaged Type STP | Others | reused for dust suppression and plantation | 7 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Reject Coal | Industrial Waste | | 480000 | Tons | 80 | Road,Rail | | Others | Sold to CFBC power plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64.5 | 1.2 | 0.21 | 64.72 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 35.8 | 1.2 | 0.12 | 35.93 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 24.1 | 1 | 0.01 | 24.12 | 80 | (4.) | NOx | | Microgram per Meter Cube | 38.4 | 1 | 0.01 | 38.42 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Crusher | None | 30 | 0.3 | PM10 | | 0.00002 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | Chhatisgarh Electricity Board | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 21.59 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 21.59 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 21.59 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : * | 0 | Total (ha.) | 21.59 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 7.13 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | Na | 0 | NA | (2.) | ESZs | NA | 0 | NA | (3.) | Wildlife Corridors | NA | 0 | NA | (4.) | Critically Polluted Area | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | Corridors | NA | 0 | NA | (7.) | WLS | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 21.59 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Apara River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 6.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 330 | (f)Total Manpower | 220 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 7.42 | 0.08 | 7.5 | (2.) | Percentage of Total Project Area | 32.89 | 0.35 | 33.24 | (3.) | No. of Plants | 20718 | 200 | 20918 | (4.) | Funds Allocated | 1000000 | 375000 | 1375000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Increase in green belt area. | (2.) | Social | Direct employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status. | (3.) | Financial | The project will contribute to the Government through various taxes. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | NA | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | NA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 00 | (b)Date of Approval | 28 Nov 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | * | (e)Approved Mining Lease Area | 0 | (f)Approved Capacity | 0 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 0 | (b)Mineable Reserves (Million Ton) | 0 | (c)Extractable Reserves(Million Ton) | 0 | (d)Percent(%) of Extraction | 0 | (e)Grade of Coal /Ore /Mineral | 0 | (f)Stripping Ratio | 0 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | 0 | (h)Average Gradient(Degree) | 0 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 0 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 0 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | NA | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | NA | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NA | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | 0 | (b)Surface to Siding/Loading | 0 | (c)Transportation / Conveyor Details | 0 | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | FOREST LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 0 | 0 | 0 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (5.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (7.) | ROADS | | 0 | 0 | 0 | | 0 | (8.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | |
TOTAL | 0 | 0 | 0 | 0 | 0 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 0 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 0 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 86 | (ii)Name of the EIA Consultant | Grass Roots Research and Creation India (P) Ltd. | (iii)Address | F-374-375, Sector-63, Noida, U.P. | (iv)Mobile No. | 9810032481 | (v)Landline No. | 0112757141 | (vi)Email Id | emtrcjkm@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 20 May 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear Sir
Please find enclosed herewith point wise reply of ADS generated for the above said Project. | 12 Sep 2020 | 2. | NA | 56.2.4 The EAC after deliberation observed that the various deficiency in filling of Form #2 on PARIVESH Portal and further sought compliance on below mentioned details:
(i) Quantity of wastewater generated and discharge is mentioned same in Form#2 at PARIVESH Portal. No loss of water is included for justifying zero liquid discharge.
(ii) Form#2 at Sr. No. 32 in green belt plan- only proposed map of green belt development plan is submitted. PP shall submit year wise plantation with fund allocation for the same.
(iii) Form#2 at Sr. No. 32 (i) and Sr. No. 22 regarding area of green belt is not matching
(iv) The values of air quality mentioned in Form#2 at Sr. No. 14.1 and Sr. No. 18.1 are different. PP shall justify the same.
(v) Copy of agreement of power requirement is not enclosed in Form# 2 at Sr. No. 19
(vi) Action taken report and action plan for compliance of conditions on the basis RO report shall be submitted.
(vii) Clarification from District Forest Officer regarding no presence of schedule I species in the project area and buffer zone shall be submitted.
(viii) PP shall enclose Attendance of Public Hearing and Letter of Member Secretary to MoEF regarding information of Public Hearing proceedings.
(ix) In EIA report: 0.48 MTPA of coal rejects will be generated during coal washing. The rejects will be stored in an earmarked place for sale to power plants and cement plants having CFBC and AFBC boilers for steam generation. No rejects shall be sold to brick and briquette manufacturers. Updated MoU or plan for utilization of rejects should be provided.
(x) PP shall provide water balance with its quantity of usage at each points.
(xi) Traffic Impact Assessment form coal mine to washery and impact on habitation along the road and 100 m from the corners of the road.
(xii) Proposed Green belt development program along-with time line and budgetary allocation needs to be provided.
(xiii) Air quality modelling for PM10 maximum value of 70.7 ug/m3 shall be conducted instead of 64.5 ug/m3 for impact modelling.
(xiv) Impact modelling considering crusher stack and fugitive dust shall be conducted and also modelling for SO2, NOx has to be done.
(xv) Details of past production figure vis-à-vis previous EC shall be submitted
In view of above the proposal was deferred for compliance of above points. | 31 Jul 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Anil Mundra | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | MAHESHWARI COAL BENIFICATION & INFRASTRUCTURE PRIVATE LIMITED | Address | Maheshwari Coal Benefiacation and Infrastructure Pvt. Ltd.Khasra No.:699, 699/1;706/1,2;707/1,2,3,5;709/1,2,3,4,5,6,7,8,9,10,11;729/1,2,3;
743/1,2,4;745
Sirgitti Industrial area, Sirgitti Railway Crossing.
Village : Parsada
Tahsil: Bilaspur
Dist |
|