1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of existing 17 production wells and a gas production & processing facility, 522 production/development well, 5 gas production and processing facilities each of 65 mmscf/d and 40 appraisal we | (b)Name of the Company / Organisation | FOCUS ENERGY LIMITED | (c)Registered Address | 3rd Floor, Gopala Towers, 25 Rajendra Place,,Central,Delhi-110008 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Tara Dutt Bhatt | (b)Designation (Owner/ Partner/ CEO) | DGM | (c)Address | 3rd Floor, Gopala Towers, 25 Rajendra Place,,Karol Bagh,Central,Delhi-110008 | (d)Pin code | 110008 | (e)E-mail | bhatt@focusoil.com | (f)STD Code. | 0(f)Telephone No. | 25747696 | (g)Fax No. | 25751938 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/RJ/IND2/150738/2009 | (d)Master Proposal Number(Single Window) | SW/150732/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | RJ-ON/6 Block | (b)Pincode | 345022 | (c)Bounded Latitudes (North) | | From | | Degree | 2922365.57 | Minutes | | Second | | From | | Degree | 3024279.88 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 586035.76 | Minutes | | Second | | From | | Degree | 623879.93 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 40E/12, 40 E/15, 40 E/16, 40F/13, 40F/14, 40 F/9. | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 90 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 17 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/289/2009-IA II (I) | (b)Date of Apply of TOR | 08 May 2009 | (c)Date of Issue of TOR / Standard ToR | 08 Feb 2009 | (d)Date of Apply of EC | 08 May 2009 | (e)Date of Issue of EC | 10 Jul 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 May 2017 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Focus Energy Limited, Village- Langtala | State : | Rajasthan | District : | Jaisalmer | Tehsil : | Jaisalmer | Village : | Langtala |
| 66 | Water facility, Transportation Facility, Education Facility | Others | ADC | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/ENV/R/PL-8/677/2008 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 9 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Gas processing facility | 1 | 4 | 5 | Others | NA | Others | NA | (2.) | Appraisal well | 0 | 40 | 40 | Others | NA | Others | NA | (3.) | Production well | 17 | 505 | 522 | Others | NA | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Filter Separator | 1 | 1 | 2 | | (2.) | Manifold Production & Test | 3 | 2 | 5 | | (3.) | Heat exchangers for inlet gas cooling | 1 | 1 | 2 | | (4.) | Water Storage Tank | 1 | 1 | 2 | | (5.) | Knock Out Drums | 2 | 2 | 4 | | (6.) | Glycol Dehydration for Moisture Removal | 1 | 1 | 2 | | (7.) | Gas Boosting Compressor from wells | 2 | 2 | 4 | | (8.) | Produced Water Treatment Plant | 1 | 1 | 2 | | (9.) | 3 phase High Pressure Separator | 2 | 2 | 4 | | (10.) | LP Separator | 1 | 1 | 2 | | (11.) | Amine Plant- CO2 Removal plant | 1 | 1 | 2 | | (12.) | Test Separators | 1 | 1 | 2 | | (13.) | Electrical Auxiliaries | 1 | 1 | 2 | | (14.) | Condensate Tanks | 8 | 8 | 16 | | (15.) | Gas Metering Skid | 1 | 1 | 2 | | (16.) | Flare System | 1 | 1 | 2 | | (17.) | Gas turbine | 1 | 1 | 2 | | (18.) | Diesel Storage Tank | 1 | 1 | 2 | | (19.) | RO Plant | 1 | 1 | 2 | | (20.) | Control Room and Associated Facilities | 1 | 1 | 2 | | (21.) | Glycol Dehydration for Moisture Removal | 1 | 1 | 2 | | (22.) | Gas turbine | 1 | 1 | 2 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 22 Jan 2019 | (iv)Valid Upto | 20 Apr 2020 | (v)File No. | 97044 | (vi)Application No. | 230662 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2570 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 13.67 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6.925 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 172.175 | (c)Total quantity of raw material/fuel | 172.175 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Potassium Chloride | 65 | Others | MT | Open market | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Caustic Soda | 1.05 | Others | MT | Open market | Road | | 100 | Open Market | | Copy of Linkage | (3.) | Sodium Chloride | 8 | Others | MT | Open market | Road | | 100 | Open Market | | Copy of Linkage | (4.) | Soda ash | 1.5 | Others | MT | Open market | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2019 To 29 Feb 2020 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 18 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 1.08 | 0.6 | 0.88 | 2 | (2.) | NOx | | Micro Gram per Meter Cube | 26.1 | 9.72 | 22.09 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 111.52 | 34.14 | 103.13 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 55.12 | 21.8 | 54.57 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 9.9 | 3.15 | 8.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 19 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | pH | | | NA | | 9.24 | 7.17 | 8.5 | 8.5 | (3.) | Total Hardness | | | mg/l | | 6800 | 40 | 200 | 200 | (4.) | TDS | | | mg/l | | 23310 | 132.9 | 500 | 500 | (5.) | Chlorides | | | mg/l | | 9873 | 16 | 250 | 250 | (6.) | Fluoride | | | mg/l | | 1.62 | 0.24 | 1 | 1 | (7.) | Heavy Metals | | Zinc | mg/l | | 0.07 | 0.01 | 5 | 5 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 0 | 0 | E | (2.) | DO | | mg/l | | 0 | 0 | E | (3.) | pH | | NA | | 0 | 0 | E | (4.) | BOD | | mg/l | | 0 | 0 | E | |
14.4. No. of Ambient Noise monitoring locations : 19 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 57.4 | 48.9 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 49.7 | 38.4 | 45 | |
14.5. No. of Soil Sample Monitored locations : 17 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 47 | 7.7 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 18.0 | 6.8 | (3.) | pH | | | 8.3 | 7.4 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 50.4 | 21.8 | (5.) | Electric Conductivity | Others | Microsiemens per centimeter | 125.5 | 42.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.85 To 108.86 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.24 To 116.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 75 | 0 | Not Appliacble | modeOthers | Tanker | Tube Well | | - | 01 Mar 2020 | 75 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic water per gas processing facility | 4 | 5 | septic tank followed by soak pit | Others | septic tank followed by soak pit | 0 | 4 | (2.) | domestic water per well | 6 | 6 | septic tank follwed by soak pit | Others | losses of 6 KLd | 6 | 0 | (3.) | process water per well | 2.7 | 5 | Solar Evaporation pit | Others | Solar evaporation pit | 0 | 2.7 | (4.) | process water per gas processing facility | 21 | 25 | Waste water evaporation pit | Others | waste water evaporation pit | 0 | 21 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 33.7 | (b)Total Discharged Water (Kilolitre per Day) | 27.7 | (c)Total Reused Water (Kilolitre per Day) | 6 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drill cutting for each well | Others | Non-hazardous | 20000 | Kilolitre | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Biodegradable waste for each well | Municipal Solid Waste | | 8.7 | Tons | 0.5 | Road | | Others | septic tank via soak pit | (3.) | Used oil per well | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.64 | Kilolitre | 0.5 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 22.1 | 0.8 | 0.07 | 22.18 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 7.2 | 0.8 | 1.0 | 8.3 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 86.8 | 0.8 | 0.09 | 86.9 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 49.1 | 0.8 | 0.30 | 49.5 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 3x500 kVA | Diesel | 5 | 0.6 | Others | CO | 0.085 | (2.) | 5x1500 kVA | Diesel | 5 | 0.6 | NOx | | 0.175 | (3.) | 5x1500 kvA | Diesel | 5 | 0.6 | Others | CO | 0.204 | (4.) | 3x500 kVA | Diesel | 5 | 0.6 | PM10 | | 0.036 | (5.) | 3x500 kVA | Diesel | 5 | 0.6 | SO2 | | 0.030 | (6.) | 3x500 kVA | Diesel | 5 | 0.6 | NOx | | 0.083 | (7.) | 5x1500 kVA | Diesel | 5 | 0.6 | PM10 | | 0.175 | (8.) | 5x1500 kVA | Diesel | 5 | 0.6 | SO2 | | 0.09 | (9.) | 3x500 kVA | Diesel | 5 | 0.6 | Others | PM2.5 | 0.035 | (10.) | 5x1500 kVA | Diesel | 5 | 0.6 | Others | PM2.5 | 0.010 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 30000 | (b)Source | DG sets | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 x 500 KVA (at each drilling site), 1 x 1500 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 217600 | Total Land (ha.) | 217600 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 217600 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Waste/barren land | 0 | Total (ha.) | 217600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Total Plot Area | 217600 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | Not Applicable | (2.) | ESAs | Not Applicable | 0 | Not Applicable | (3.) | Wildlife Corridors | Not Applicable | 0 | Not Applicable | (4.) | ESZs | Not Applicable | 0 | Not Applicable | (5.) | WLS | Not Applicable | 0 | Not Applicable | (6.) | NPA | Not Applicable | 0 | Not Applicable | (7.) | Corridors | Not Applicable | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not Applicable | 0 | Not Applicable | (2.) | Archaeological Sites | | Not Applicable | 0 | Not Applicable | (3.) | Defence Installations | | Dhanana Check Post BSF | 25.6 | E | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 217600 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian wild ass, Chinkara, black buck, Desert fox, Wild cat, Wolf, Desert monitor lizard, Great Indian Bustard, Inian Vulture, Indian peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Canal near Alam ka gaon | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 17.11 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 111 | (d)Temporary Employment- During Operation | 271 | (e)No. of working days | 333 | (f)Total Manpower | 382 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 20 | 0 | 20 | (2.) | Percentage of Total Project Area | 0.01 | 0 | 0.01 | (3.) | No. of Plants | 5600 | 0 | 5600 | (4.) | Funds Allocated | 1 | 0 | 1 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Direct employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status | (2.) | Environmental | Increase in green belt area | (3.) | Financial | The project will contribute to the Government through various taxes | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev 85/09 March, 2020 at S. No. 172 | (ii)Name of the EIA Consultant | Wolkem India Limited | (iii)Address | Wolkem house E-101 Mewar Industrial Area, Madri, Udaipur-313003 | (iv)Mobile No. | 9415550525 | (v)Landline No. | 0294249260 | (vi)Email Id | wcs@wolkem.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 19 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | you are submitting information in industry -3 sector. Your sector is industry 2. Please submit the information in industry 2 sector and also contact PArivesh 1 team. | 19 Apr 2024 | 2. | ADS Reply Letter | We wish to inform, that the aforementioned project with proposal no. IA/RJ/IND2/150738/2009 was uploaded in Parivesh 1.0 and was appraised in industry-2 sector only for grant of EC on 12.05.2020.
Complaint regarding the same has been raised to NIC under complaint no. TIC-24005073 dated 08.03.2024. In view of above we wish to transfer the proposal by back end to IND EAC from IND3 EAC & also request to appraise our case in IND2 for recommendation of EC. | 04 Apr 2024 | 3. | NA | Matter pertains to Industry II. Please apply in industry II sector | 08 Mar 2024 | 4. | ADS Reply Letter | Reply of ADS generated on 26.05.2020 | 21 Feb 2024 | 5. | NA | The EAC during deliberations noted that the Mine Lease area is reported to be allocated to M/s ONGC and as such the instant project requires additional information/inputs for consideration. The Committee after detailed deliberations, deferred the proposal and insisted for requisite information/clarification with respect to the following:
(i) Details of PL/ML area with the project proponent. Confirmation from DGH regarding non allocation of same lease area to other project proponents.
(ii) Plan to mitigate blow out/safety/risk management in drilling site and storage area.
(iii) Plan for advance technology for water treatment and reuse.
(iv) Details of EIA/EMP report vis-à-vis ToR and scope of work proposed.
(v) Details of public hearing conducted, location/districts, ToR for the same. Action plan on public hearing issues with budgetary allocation
(vi) Permission for ground water extraction. Analysis on alternate source of water, if any, and commitment/MoU.
(vii) Cross verification of baseline AAQ data and incremental GLCs.
(viii) Details of Corporate Environmental Responsibility allocation and plan.
(ix) Certified compliance report and Action Taken Report on non-compliance points forwarded by the Regional Office of the MoEFCC.
The proposal was there for deferred for the needful. | 26 May 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Tara Dutt Bhatt | Designation | DGM | Name of Company (Applicant Name should not be given here) | FOCUS ENERGY LIMITED | Address | 3rd Floor, Gopala Towers, 25 Rajendra Place |
|