Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of existing 17 production wells and a gas production & processing facility, 522 production/development well, 5 gas production and processing facilities each of 65 mmscf/d and 40 appraisal we
(b)Name of the Company / Organisation FOCUS ENERGY LIMITED
(c)Registered Address 3rd Floor, Gopala Towers, 25 Rajendra Place,,Central,Delhi-110008
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Tara Dutt Bhatt
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address 3rd Floor, Gopala Towers, 25 Rajendra Place,,Karol Bagh,Central,Delhi-110008
(d)Pin code 110008
(e)E-mail bhatt@focusoil.com
(f)STD Code. 0(f)Telephone No. 25747696
(g)Fax No. 25751938
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/RJ/IND2/150738/2009
(d)Master Proposal Number(Single Window) SW/150732/2020
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. RJ-ON/6 Block
(b)Pincode 345022
(c)Bounded Latitudes (North)
From
Degree 2922365.57
Minutes
Second
From
Degree 3024279.88
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 586035.76
Minutes
Second
From
Degree 623879.93
Minutes
Second
(e)Survey of India Topo Sheet No. 40E/12, 40 E/15, 40 E/16, 40F/13, 40F/14, 40 F/9.
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 90
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 17
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/289/2009-IA II (I)
(b)Date of Apply of TOR 08 May 2009
(c)Date of Issue of TOR / Standard ToR 08 Feb 2009
(d)Date of Apply of EC 08 May 2009
(e)Date of Issue of EC 10 Jul 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Apr 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 May 2017
Distance of Public Hearing Venue from the Proposed Project :0
Focus Energy Limited, Village- Langtala
State :Rajasthan
District :Jaisalmer
Tehsil :Jaisalmer
Village :Langtala
66Water facility, Transportation Facility, Education FacilityOthersADC
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/PL-8/677/2008
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 9 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Gas processing facility145OthersNAOthersNA
(2.)Appraisal well04040OthersNAOthersNA
(3.)Production well17505522OthersNAOthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Filter Separator112
(2.)Manifold Production & Test325
(3.)Heat exchangers for inlet gas cooling112
(4.)Water Storage Tank112
(5.)Knock Out Drums224
(6.)Glycol Dehydration for Moisture Removal112
(7.)Gas Boosting Compressor from wells224
(8.)Produced Water Treatment Plant112
(9.)3 phase High Pressure Separator224
(10.)LP Separator112
(11.)Amine Plant- CO2 Removal plant112
(12.)Test Separators112
(13.)Electrical Auxiliaries112
(14.)Condensate Tanks8816
(15.)Gas Metering Skid112
(16.)Flare System112
(17.)Gas turbine112
(18.)Diesel Storage Tank112
(19.)RO Plant112
(20.)Control Room and Associated Facilities112
(21.)Glycol Dehydration for Moisture Removal112
(22.)Gas turbine112
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Jan 2019
(iv)Valid Upto 20 Apr 2020
(v)File No. 97044
(vi)Application No. 230662
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2570
(b) Funds Allocated for Environment Management (Capital) (in Crores) 13.67
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.925
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 172.175
(c)Total quantity of raw material/fuel 172.175
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Potassium Chloride65OthersMTOpen marketRoad100 Open MarketCopy of Linkage
(2.)Caustic Soda1.05OthersMTOpen marketRoad100 Open MarketCopy of Linkage
(3.)Sodium Chloride8OthersMTOpen marketRoad100 Open MarketCopy of Linkage
(4.)Soda ash1.5OthersMTOpen marketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 29 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 18
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube1.080.60.882
(2.)NOxMicro Gram per Meter Cube26.19.7222.0980
(3.)PM10Micro Gram per Meter Cube111.5234.14103.1380
(4.)PM2.5Micro Gram per Meter Cube55.1221.854.5760
(5.)SO2Micro Gram per Meter Cube9.93.158.380
    14.2.     No. of Ground Water monitoring locations : 19
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA9.247.178.58.5
(3.)Total Hardnessmg/l680040200200
(4.)TDSmg/l23310132.9500500
(5.)Chloridesmg/l987316250250
(6.)Fluoridemg/l1.620.2411
(7.)Heavy MetalsZincmg/l0.070.0155
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l00E
(2.)DOmg/l00E
(3.)pHNA00E
(4.)BODmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 19
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.448.955
(2.)Leq(Night)A-weighted decibels(dB(A))49.738.445
    14.5.     No. of Soil Sample Monitored locations : 17
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram477.7
(2.)P(Phosphorus)Milligram per Kilogram18.06.8
(3.)pH8.37.4
(4.)N(Nitrogen)Milligram per Kilogram50.421.8
(5.)Electric ConductivityOthersMicrosiemens per centimeter125.542.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.85 To 108.86
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.24 To 116.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater750 Not Appliacble modeOthersTankerTube Well-01 Mar 202075
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic water per gas processing facility45septic tank followed by soak pitOthersseptic tank followed by soak pit04
(2.)domestic water per well66septic tank follwed by soak pitOtherslosses of 6 KLd60
(3.)process water per well2.75Solar Evaporation pitOthersSolar evaporation pit02.7
(4.)process water per gas processing facility2125Waste water evaporation pitOtherswaste water evaporation pit021
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 33.7
(b)Total Discharged Water (Kilolitre per Day) 27.7
(c)Total Reused Water (Kilolitre per Day) 6
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill cutting for each wellOthersNon-hazardous20000Kilolitre0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Biodegradable waste for each wellMunicipal Solid Waste8.7Tons0.5RoadOthersseptic tank via soak pit
(3.)Used oil per wellHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.64Kilolitre0.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube22.10.80.0722.1880
(2.)SO2Microgram per Meter Cube7.20.81.08.380
(3.)PM10Microgram per Meter Cube86.80.80.0986.9100
(4.)PM2.5Microgram per Meter Cube49.10.80.3049.560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3x500 kVADiesel50.6OthersCO0.085
(2.)5x1500 kVADiesel50.6NOx0.175
(3.)5x1500 kvADiesel50.6OthersCO0.204
(4.)3x500 kVADiesel50.6PM100.036
(5.)3x500 kVADiesel50.6SO20.030
(6.)3x500 kVADiesel50.6NOx0.083
(7.)5x1500 kVADiesel50.6PM100.175
(8.)5x1500 kVADiesel50.6SO20.09
(9.)3x500 kVADiesel50.6OthersPM2.50.035
(10.)5x1500 kVADiesel50.6OthersPM2.50.010
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 30000
(b)Source DG sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 x 500 KVA (at each drilling site), 1 x 1500 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 217600
    Total Land (ha.) 217600
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 217600
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Waste/barren land 0
    Total (ha.) 217600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plot Area217600
Total (ha.) 217600
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0Not Applicable
(2.)ESAsNot Applicable0Not Applicable
(3.)Wildlife CorridorsNot Applicable0Not Applicable
(4.)ESZsNot Applicable0Not Applicable
(5.)WLSNot Applicable0Not Applicable
(6.)NPANot Applicable0Not Applicable
(7.)CorridorsNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Not Applicable
(2.)Archaeological SitesNot Applicable0Not Applicable
(3.)Defence InstallationsDhanana Check Post BSF25.6E
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 217600
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian wild ass, Chinkara, black buck, Desert fox, Wild cat, Wolf, Desert monitor lizard, Great Indian Bustard, Inian Vulture, Indian peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Canal near Alam ka gaon
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 17.11
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 111
(d)Temporary Employment- During Operation 271
(e)No. of working days 333
(f)Total Manpower 382
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt20020
(2.)Percentage of Total Project Area0.0100.01
(3.)No. of Plants560005600
(4.)Funds Allocated101
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect employment to eligible persons preferable local persons besides creating indirect employment opportunities. Various CSR, CER activities in adjoining villages will help in improving social status
(2.)EnvironmentalIncrease in green belt area
(3.)FinancialThe project will contribute to the Government through various taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 85/09 March, 2020 at S. No. 172
(ii)Name of the EIA Consultant Wolkem India Limited
(iii)Address Wolkem house E-101 Mewar Industrial Area, Madri, Udaipur-313003
(iv)Mobile No. 9415550525
(v)Landline No. 0294249260
(vi)Email Id wcs@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 19 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAyou are submitting information in industry -3 sector. Your sector is industry 2. Please submit the information in industry 2 sector and also contact PArivesh 1 team. 19 Apr 2024
2. ADS Reply LetterWe wish to inform, that the aforementioned project with proposal no. IA/RJ/IND2/150738/2009 was uploaded in Parivesh 1.0 and was appraised in industry-2 sector only for grant of EC on 12.05.2020. Complaint regarding the same has been raised to NIC under complaint no. TIC-24005073 dated 08.03.2024. In view of above we wish to transfer the proposal by back end to IND EAC from IND3 EAC & also request to appraise our case in IND2 for recommendation of EC. 04 Apr 2024
3.NAMatter pertains to Industry II. Please apply in industry II sector 08 Mar 2024
4. ADS Reply LetterReply of ADS generated on 26.05.2020 21 Feb 2024
5.NA

The EAC during deliberations noted that the Mine Lease area is reported to be allocated to M/s ONGC and as such the instant project requires additional information/inputs for consideration. The Committee after detailed deliberations, deferred the proposal and insisted for requisite information/clarification with respect to the following:

 

   (i)        Details of PL/ML area with the project proponent. Confirmation from DGH regarding non allocation of same lease area to other project proponents.

 

 (ii)        Plan to mitigate blow out/safety/risk management in drilling site and storage area.

 

(iii)        Plan for advance technology for water treatment and reuse.

 

(iv)        Details of EIA/EMP report vis-à-vis ToR and scope of work proposed.

 

 (v)        Details of public hearing conducted, location/districts, ToR for the same. Action plan on public hearing issues with budgetary allocation

 

(vi)        Permission for ground water extraction. Analysis on alternate source of water, if any, and commitment/MoU.

 

(vii)        Cross verification of baseline AAQ data and incremental GLCs.

 

(viii)        Details of Corporate Environmental Responsibility allocation and plan.

 

(ix)        Certified compliance report and Action Taken Report on non-compliance points forwarded by the Regional Office of the MoEFCC.

The proposal was there for deferred for the needful.

26 May 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTara Dutt Bhatt
DesignationDGM
Name of Company (Applicant Name should not be given here)FOCUS ENERGY LIMITED
Address3rd Floor, Gopala Towers, 25 Rajendra Place