1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Shyam Dye Chem | (b)Name of the Company / Organisation | SHYAM DYE CHEM | (c)Registered Address | Bunglow No. 19, Vaikunth Society GIDC, Ankleshwar,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Keshavbhai Savaliya | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. 6919 , 6901 ,GIDC, Ankleashwar,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | shyamdyes@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 2210000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/150661/2007 | (d)Master Proposal Number(Single Window) | SW/149178/2020 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No.: 6919 & 6901 | (b)Pincode | 393001 | (c)Bounded Latitudes (North) | | From | | Degree | 21.6179 | Minutes | | Second | | From | | Degree | 21.6179 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.0411 | Minutes | | Second | | From | | Degree | 73.0411 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 100 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/478/2007-IAII(I) | (b)Date of Apply of TOR | 07 May 2007 | (c)Date of Issue of TOR / Standard ToR | 24 Oct 2007 | (d)Date of Apply of EC | 24 Oct 2027 | (e)Date of Issue of EC | 05 Dec 2007 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Unit is in GIDC Ankleshwar | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | --- | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 23 2020 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Azo Pigment (Organic Yellow Pigment) | 0 | 1200 | 1200 | Tons per Annum(TPA) | | Road | | (2.) | Basic Dyes | 0 | 1200 | 1200 | Tons per Annum(TPA) | | Road | | (3.) | Reactive Dyes | 36 | 1164 | 1200 | Tons per Annum(TPA) | | Road | | (4.) | Solvent Dyes (Azo Group) | 36 | 1164 | 1200 | Tons per Annum(TPA) | | Road | | (5.) | Acid Dyes | 36 | 1164 | 1200 | Tons per Annum(TPA) | | Road | | (6.) | Azo Intermediate | 36 | 1164 | 1200 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | MSRL | 1 | 0 | 1 | 6 KL | (2.) | MSRL | 1 | 0 | 1 | 12 KL | (3.) | Filter Press | 1 | 0 | 1 | | (4.) | Dryer | 1 | 1 | 2 | | (5.) | Pulverize | 1 | 1 | 2 | | (6.) | Ball mill | 1 | 1 | 2 | | (7.) | MSRL | 0 | 1 | 1 | 5 KL | (8.) | Ball mill | 1 | 0 | 1 | | (9.) | Dryer | 1 | 1 | 2 | | (10.) | Dryer | 1 | 1 | 2 | | (11.) | Dryer | 1 | 1 | 2 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 08 Jul 2018 | (iv)Valid Upto | 28 Aug 2023 | (v)File No. | AWH-95210 | (vi)Application No. | AWH-95210 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3.29 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.57 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.065 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.14 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7149.89 | (b)Existing quantity of raw material/fuel | 196.2 | (c)Total quantity of raw material/fuel | 7346.09 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Cynuric chloride | 336 | Tons per Annum | | Gomoswa International, Ankleshwar | Road | | 6 | Open Market | | Copy of Linkage | (2.) | Aniline | 504 | Tons per Annum | | Par Industries, Ankleshwar | Road | | 5 | Open Market | | Copy of Linkage | (3.) | Ortho Toluidine | 1200 | Tons per Annum | | Shreeji Industries, Ankleshwar | Road | | 10 | Open Market | | Copy of Linkage | (4.) | Chloro Sulpho Toludine | 708 | Tons per Annum | | sun white chemicals, Ankleshwar | Road | | 9 | Open Market | | Copy of Linkage | (5.) | Beta Naphthol | 756 | Tons per Annum | | Par Industries, Ankleshwar | Road | | 9 | Open Market | | Copy of Linkage | (6.) | Hydrochloric Acid | 420 | Tons per Annum | | Triveni Chemicals | Road | | 8 | Open Market | | Copy of Linkage | (7.) | Sodium Nitrite | 432 | Tons per Annum | | Krishna Enterprise, Ankleshwar | Road | | 9 | Open Market | | Copy of Linkage | (8.) | Para Amino Azo Benzne | 98 | Tons per Annum | | Shreeji Industries, Ankleshwar | Road | | 3 | Open Market | | Copy of Linkage | (9.) | Caustic | 456 | Tons per Annum | | Amrut Enterprises, Ankleshwar | Road | | 8 | Open Market | | Copy of Linkage | (10.) | Sulphanilic Acid | 600 | Tons per Annum | | Yomas Enterprise, Ankleshwar | Road | | 7 | Open Market | | Copy of Linkage | (11.) | H Acid | 564 | Tons per Annum | | Shrihari Chemicals Trading | Road | | 9 | Open Market | | Copy of Linkage | (12.) | Salt | 1272 | Tons per Annum | | Padmavati salt Pvt. Ltd., Ankleshwar | Road | | 6 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 48 | 9 | 46 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 50 | 12 | 49 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 90 | 59 | 89 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 48 | 22 | 47 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 60 | 20 | 100 | 500 | (2.) | Chlorides | | | mg/l | | 844 | 181 | 250 | 1000 | (3.) | Total Hardness | | | mg/l | | 481 | 129 | 300 | 600 | (4.) | TDS | | | mg/l | | 2591 | 1098 | 500 | 2000 | (5.) | Fluoride | | | mg/l | | 0.49 | 0.05 | 1 | 1.5 | (6.) | pH | | | NA | | 8.2 | 7.1 | 6.5 | 8.5 | (7.) | Heavy Metals | | Iron | mg/l | | 0.54 | 0.1 | 0.3 | 1 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.5 | 3.8 | C | (2.) | BOD | | mg/l | | 0 | 0 | C | (3.) | COD | | mg/l | | 0 | 0 | C | (4.) | pH | | NA | | 9 | 6 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50 | 45 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 62 | 37 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 15.3 | 10.2 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 1.92 | 1.18 | (3.) | K(Potassium) | Milliequivalents per 100 Gram | | 1.89 | 0.39 | (4.) | pH | | | 8.5 | 7.2 | (5.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 15.1 | 11.48 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Ankleshwar | 8 | 3 | Copy of Permission Letter | Pipeline | | Others | Pipe line/ Tanker | NTA/ANK/DEE(WS)/208 | 02 Feb 2020 | 65 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | GIDC Ankleshwar | 59 | 60 | Primary to tertiary | Reuse within the Plant & Recycling | | 59 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 59 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 59 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Empty barrels/containers/liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 2 | Road | | Authorized Recyclers | | (2.) | Spent Cabon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 3 | Road | | Co-Processing | | (3.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 474.5 | Tons | 3 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Tons | 3 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Used or spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 2 | Road | | Authorized Recyclers | | (6.) | RO memberane | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 3 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 48 | 10 | 0.45 | 48.5 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 90 | 10 | 0.05 | 90.1 | 100 | (3.) | NOx | | Microgram per Meter Cube | 50 | 10 | 0.37 | 50.4 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 48 | 10 | 0.08 | 48.1 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Hot Air Generator | Natural Gas | 11 | 400 | Others | PM, SO2, NOx | 150,100,50 | (2.) | Bolier | Natural Gas | 11 | 400 | Others | PM, SO2, NOx | 150,100,50 | (3.) | D.G. Set | Diesel | 11 | 300 | Others | PM, SO2, NOx | 150,100,50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.1607 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1607 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 4743.53 | (b)Waste/Barren Land (ha.) | 5097.08 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1418.57 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 4562.30 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow Land, degraded , sand land veg | 15661.18 | Total (ha.) | 31482.6600 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.056245 | | (2.) | Green belt | | 0.035354 | | (3.) | Others | open plot,roads and storage area | 0.069101 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | --- | 0 | Not Applicable | (2.) | Wildlife Corridors | --- | 0 | Not Applicable | (3.) | Critically Polluted Area | GIDC Ankleshwar | 0 | Unit is in GIDC Ankleshwar | (4.) | WLS | --- | 0 | Not Applicable | (5.) | NPA | --- | 0 | Not Applicable | (6.) | ESZs | --- | 0 | Not Applicable | (7.) | ESAs | --- | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | --- | 0 | Not Applicable | (2.) | Defence Installations | | --- | 0 | Not Applicable | (3.) | Forest | | -- | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.16 | (b)Land yet to be acquired(Ha) | 0.16 | (c)Status of Land acquisition if not acquired | Already acquired by GIDC Ankleshwar | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 17 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 2 | (e)No. of working days | 365 | (f)Total Manpower | 24 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 100 | 545.69 | 645.69 | (2.) | Percentage of Total Project Area | 28 | 545.69 | 573.69 | (3.) | No. of Plants | 10 | 55 | 65 | (4.) | Funds Allocated | 0 | 100000 | 100000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The project is newly raised therefore; at the time of development plantation would be carried out. The various Environmental facilities and infrastructure planned in the project. This includes solid waste management facility, sewage treatment plant, and water harvesting facility, etc. | (2.) | Financial | The proposed project would have beneficial impacts through provision of direct and indirect employment opportunities.
At the time of construction and operational phases, there would be requirement for large number of skilled, semi-skilled and unskilled work force for current activity. | (3.) | Social | We will generate CER funds that will be utilized in surrounding area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Show Cause Notice from GPCB | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | applied for NABET | (ii)Name of the EIA Consultant | Jyoti Om Chemical Research Centre Pvt Ltd | (iii)Address | K1 7705/2,3,4, GIDC , Ankleshwer | (iv)Mobile No. | 9824150383 | (v)Landline No. | 0264622029 | (vi)Email Id | info@jyotiom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) On examination it seems that PP in S.No. 6 of Form 2 mentioned that TOR issued in 2007 and date of apply of Ec is 2027. Please clarify and upload copy of valid TOR, earlier EC, in Form 2 ( S.No. 6.).
(ii) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded).
(iii) It is also noted that PP has got earlier EC, however PP has not uploaded certified compliance report of earlier EC form RO MoEFCC.
(iv) PP submitted the references of page numbers w.r.t. TOR compliances only and not in details. TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(v) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Compliance Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(vi) All old CTOs not uploaded to verify the violation, if any done by PP.
(vii) Details of earlier production of various products with financial years needs to submit to check violation, if any.
(viii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(ix) On examination it is noted that there are show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded. Kindly revise the form 2 and upload the correct action plan on the direction and what is status of such direction.
(x) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted
(xi) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 04 Apr 2020 | 2. | NA | (i) On examination it seems that PP in S.No. 6 of Form 2 mentioned that TOR issued in 2007 and date of apply of Ec is 2027. Please clarify and upload copy of valid TOR, earlier EC, in Form 2 ( S.No. 6.).
(ii) This is an expansion proposal and as per TOR for expansion project, the PP shall submit the compliance report to the conditions of consents from the SPCB. However PP has not submitted the certified compliance report from SPCB as per TOR granted to PP. (S.No 9 of Form 2 has to revised and uploaded).
(iii) It is also noted that PP has got earlier EC, however PP has not uploaded certified compliance report of earlier EC form RO MoEFCC.
(iv) PP submitted the references of page numbers w.r.t. TOR compliances only and not in details. TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(v) S. no. 23.1 of form 2 (CPA) mentioned; However PP has not submitted the Compliance Report as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(vi) All old CTOs not uploaded to verify the violation, if any done by PP.
(vii) Details of earlier production of various products with financial years needs to submit to check violation, if any.
(viii) Details of Raw material and its linkage and its mitigation measure during transportation needs to be submitted (13.1 of form 2)
(ix) On examination it is noted that there are show cause notices issued by SPCB, however S.No. 37 of form 2 mentioned NIL. PP has conceal the information. In this regard details action taken by SPCB needs to submitted and accordingly revise the Form 2 and uploaded. Kindly revise the form 2 and upload the correct action plan on the direction and what is status of such direction.
(x) Effluent treatment mechanism with plan for Zero Liquid Discharge for the complete plant needs to be submitted
(xi) It is mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action. It is also mentioned that after acceptance the Proposal, EIA/EMP report/Form 2 can not be revise. Therefore, PP/Consultant is requested to kindly do needful. | 04 Apr 2020 | 3. | NA | The correction have been made as per the instruction received | 16 Jul 2020 | 4. | NA | 1. Please read the earlier EDS sought by the Ministry earlier. The matter was again examined and noted that PP has not revised the Form 2 and not uploaded the requisite information in Form 2 of Parivesh Portal (For eg. S.No. 6 of Form 2 etc. and many others)
2. It is pertain to mentioned that the processing of EC proposal, in the Ministry, is through Parivesh Portal only, therefore providing the requisite information/documents shall be in compliance as per Form 2 and accordingly the PP/Consultant are kindly requested to revise the application in the Form 2 alongwith EIA/EMP Report and resubmit the same. The EIA/EMP Report shall match with the information as filled in Form 2 for further appraisal necessary action.
3. It is also mentioned that after acceptance the Form 2 and EIA/EMP report can not be revise. Therefore, PP/Consultant is again requested to kindly do needful. | 28 Jul 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Keshavbhai Savaliya | Designation | Partner | Name of Company (Applicant Name should not be given here) | SHYAM DYE CHEM | Address | Bunglow No. 19, Vaikunth Society GIDC, Ankleshwar |
|